Laboratory - Documentation Checklist LABPR 403 – DoD ELAP Laboratory Name Date Instructions: All documentation stated below indicated with an X are required to be sent to L-A-B at least 30 days prior to the scheduled assessment. L-A-B does not maintain any laboratory quality documentation on file. Any delays in receiving the necessary documentation may result in a rescheduling of the assessment per L-A-B Policy 004. Electronic documentation must be sent to operations@l-a-b.com or l-a-b.sharefile.com. L-A-B documents are available on our website at www.l-a-b.com. Initial / Full Assessment Type I Surveillance Type II Surveillance X X X X If Changed If Changed X If Changed If Changed X X X X X X Laboratory Quality Manual X X X Laboratory Organizational Chart X X X Laboratory Documentation Submittal Requirements Date Submitted New or Modified “Proposed Scope of Accreditation” Scope changes require a Form 19 Change Notice and an updated Word version. If the scope is new or modified a new estimate may be required. If the scope remains the same and is listed correctly on our website put SAME. L-A-B Form 403A.2 - Assessment Checklist - Module 2 – General Requirements Complete on its latest revision level. Completely filled out Electronically. Required for surveillance if changed. L-A-B Forms 403A.3, 403A.4, 403A.5, 403.A.6, 403.A.7 - Assessment Checklists Module 2 – 7 Testing Requirements (as applicable) Complete on its latest revision level. Completely filled out Electronically. Required for surveillance if changed. L-A-B Form 001 - Traceability Tracking Provide this form which details the traceability of the calibrated items in the lab. L-A-B Form 002 – PT Provider Tracking Complete and updated as necessary. Laboratory Quality System Procedures Examples include (but not limited to) – Policy for ethics, procedures for document control, technical procedures or work instructions supporting the scope, etc. Form 403A.1 – Rev 2 – 05/05/14 X Page 1 of 2 Laboratory - Documentation Checklist LABPR 403 – DoD ELAP Laboratory Documentation Submittal Requirements Initial / Full Assessment Type I Surveillance Type II Surveillance X If Changed If Changed X X X X X X X X X X X X X X X Date Submitted Laboratory Technical SOP’s All technical procedures supporting testing identified on the scope including Preps and Instrumentation. Required for surveillance assessments if changed. Latest Management Review, Internal Audit Results Most current Management Review and Internal Audit results completed to the requirements of DoD QSM V5. LOD / LOQ Verifications For each Matrix to be included on the Scope of Accreditation. In-House LCS Control Charts and Limits Complete Data Packages - 2 per site covering scope testing methods See note below on data package requirements. Proficiency Testing Results Last three rounds covering ALL matrixes / analytes from scope testing. Preferred to provide your current years PT results submitted as the data package above. (Initial Assessment Only) - Recent NELAC Assessment Reports Please also provide non-compliance reports and a summary of laboratory actions to resolve. Initial Only (Initial Assessment Only) - Recent DoD Component Assessment Reports Example: Army, Navy, Air Force, Army Corps, ect. Please provide non-compliance reports and a summary of laboratory actions to resolve. Initial Only Note – A complete Data Package shall contain the following: 1. Calibration data (raw data printout or log sheets) 2. Preparation batch records (preparation) 3. Analytical batch records (instrumentation) (The above is for samples and QC and associated controls (blanks, negatives, positives as applicable to the technology) 4. Standards / Reagent Log Books Case narrative, final sample results, final qc results 5. Data review checklist or record(s) Form 403A.1 – Rev 2 – 05/05/14 Page 2 of 2