107 CROYDON ROAD, FENHAM, NEW CASTLE UPON TYNE,NE4

advertisement
BEN EDO-OSAGIE, OSARETIN
31 Parvills, Waltham Abbey, EN9 1QG.
Phone: +447404747634. Email: osaretinedoosagie@yahoo.co.uk
PERSONAL INFORMATION
Marital Status: Single
Date of Birth: 14th October, 1975.
PROFILE
A distinct Civil Engineering professional who is meticulous and trustworthy, able to work on own
initiative or as part of a team and can deal with duties competently, who is keen to find a position which
will encourage continuous learning and career development.
WORK EXPERIENCE
Hertel Services: Conoco Philips, Humberside Refinery, Eastfield Road, Killingholme.
Immingham, September 2010 – Date
Site Engineer (Short term freelancing)
 Accomplished setting out for tank farms
 Determined elevation and levels for oil facilities
 Carried out As-built survey
 Handled Technical queries.
 Handled Health and Safety issues, etc.
Mcandrew Utilities Lakeshore, Bristol, February 2010 – September 2010
Project: Lakeshore Urban Side Residential Development.
Setting Out Engineer (Short term freelancing)
 Accomplished Setting out of Lines and levels
 Performed As-built survey
 Handled Technical queries.
Biwater Treatment Limited UK, STW, Wanlip, Leicester, LE7 4PF, United Kingdom, March
2007 – December 2009.
Client: Severn Trent Water.
Project: Wanlip Sewage Treatment Works (AMP 4) (£50m), 5years framework for new works and
upgrading of existing works comprising of : Piling works, FST’s, Inlet works, Balance tanks,
Aeration lanes, Pumping stations, sludge tanks, Gas tanks, CHP units, pipeline network, Washwater,
Traffic management, New field roads and upgrading of existing road layout accompanied by
expansive drainage network.etc.
Civil Project Engineer
 Accomplished Setting out.
 Procured construction and engineering materials through company’s system knowns as
EMIS(Enterprise Management Information System).
 Updated, filed and dispatched all incoming engineer revised drawings and briefed Site
Engineer’s and subcontractors of all major changes.







Accurately analysed and interprete Civil Engineering built drawings in collaboration with
M+E drawings.
Managed detailed design activities and technical queries both with designers and the clients.
Prepared scope of works for small work and temporary work packages.
Arranging and mediating in project progress review meetings with clients and
contractors.
Achieved Safe system of works(SSOW), Permits, quality assessment and quality control
Enforced CDM regulations and HSE on site, i.e best practice,etc
Responsible for men by managing and organizing gangs to carry out works and ordering
materials thru EMIS/retrieving same from inventory available..
Byrne Bros UK (A Division of the Byrne Group), 13-15 White Hart Lane, London, SW13 OPX.
United Kingdom.
October 2006 – March 2007.
Client: Sir Robert Mc-Alpine
Project: The New Shires Leicester(Commercial Development) (£200m)
Civil Project Engineer (Freelance).
 Carried out Complex Setting-out of Halfens, Slipform and RC Structures using, EDM, OffSet Programs and Co-ordinate transformation.
 Established site datums, grid lines, and levels for comax.
 Accurately analysed and interpreted Civil Engineering built drawings.
 Managed detailed design activities and technical queries
 Analysed work programs, schedules and planning
 Carried out Quality Assessments and Quality Control, and attended to non-conformance
reports, bar schedules etc.
 Liaised with client on project progress meetings and enforcing Health and Safety regulations
on site.
Ham Construction, Little Germany, Bradford, United Kingdom, April 2006- September 2006.
Project: East Brook Hall(Commercial/Residential) (£14m)
Civil Engineer (Freelance)
 Made use of Total station for Setting Out, Slipforms, and levels for RC frames.
 Carried out Quality Assessments and Quality Control
 Performed As-Built Survey.
 Carried out risk assessment, prepared method statement.
 Ensured Health and Safety regulations were enforced on site.
 Accurately analysed and interpreted Civil Engineering built drawings.
 Managed detailed design activities and technical queries.
Hertel Services UK, November 2004 – April 2006.
Client: BASF Petrochemical Company, Seal Sands, Middlesborough, TS2 1TX, United Kingdom.
Projects:
1. Construction of an (Overshed) comprising of reinforced concrete pad foundation, stub
columns, wingwalls and steel sections to withstand blast for AN6 control room. (£1m)
2. Construction of utilities building.
3. Evaluation of bundwall integrity around tank farms in petrochemical plant.
4. Construction of concrete pipe supports for pipeline overlay.
Civil Engineer
 Developed projects execution strategies, through planning and integrating operations
philosophy into projects.
 Managed stakeholders’ aspirations where necessary.
 Managed detailed design activities.
 Approved Setting out, grid lines, established site datums and evaluation of Pre-Construction
survey data’s.
 Carried out the preparation of work scope, planning and scheduling.
 Evaluated bundwall integrity and risk assessment around tank farms.
 Appropriately applied the use of autocad in preparing survey drawings.
 Correctly analysed and interpreted Civil Engineering built drawings.
 Ensured strict compliance of projects to prescribed designs and specifications.
 Carried out regular monitoring/supervision of projects by liaising with sub-contractors.
 Ensured strict compliance to CDM regulatioms, Health Safety and Environment (HSE) issues.
 Accomplished accurate appraisals of method statements and risk assessments.
Homan Engineering Company Limited, February 2003 – September 2004
Client: Shell Petroleum Development Company.
Projects:
1. Ovhor South East (Ejekimoni). Construction of 1.75km Access road, location preparation and
camp site ($3m)
2. Abura-J, location preparation ($1m)
Project Engineer
 Performed Setting out, levelling and evaluation of Pre-Construction survey
data for pavement design.
 Executed project design of earth retaining structures like drill waste pit, dirty
water sumps and cellar slabs, including the design of perimeter drain.
 Prepared work scope.
 Prepared Project tenders, schedules, cost estimates and job orders.
 Carried out project administration and implementation i.e. Project Execution Plan
(PEP), the periodical appraisals of Value of Work Done (VOWD) and project review reports.
 Ensured strict compliance of project to prescribed design and specification.
 Monitored and supervised Projects.
 Ensured strict compliance to Health Safety and Environment (HSE) issues.
Shell Petroleum Development Company, June 2001 – February 2003
Project: (In Consortium with Shell Global Solutions UK) Soil Remediation/Clean Up in Shell
Operational areas of the Niger Delta: Opuama, Benisede, Forcados, Ughelli fields, Evwereni etc.
($10m)
Remediation Engineer
 Developed Conceptual Site Models for EIA in Shell Operational Areas (Niger Delta).
 Prepared Remediation work-plans and technical reports for different fields.
 Carried out QA/QC of underground water.
 Mobilized workers and materials to Site.
 Ensured strict compliance to Remediation work-plan and procedures.
 Prepared weekly project report and time sheets of contractors.



Monitored the progress of Remediation work-plan by analysing laboratory test results at
different milestones to ascertain the level of hazard.
Prepared project close out report.
Ensured compliance to Health Safety and Environment (HSE) issues.
Shell Petroleum Development Company, 2000 – 2001.
Projects:
1. Design and Construction of DGW Car Park Edjeba (Shell Residential Area) ($0.5m)
2. SSW Industrial Area Road Rehabilitation ($0.1m)
Trainee Engineer
 Prepared work-scope and Job orders based on site investigation.
 Prepared project contracts and tenders.
 Ensured Budget Clearing and Pre-mobilisation of Contractors.
 Ensured strict compliance to project design and specification.
 Prepared Weekly Project Report.
 Prepared project review report, Value of Work Done (VOWD) and milestone schedules.
QUALIFICATIONS
Postgraduate Degree in Geochemistry
University of Newcastle Upon Tyne, UK.
B.Eng. (Civil Engineering) Second Class Lower 2.2
Ambrose Alli University.
EXTRACURRICULAR ACTIVITIES
Swimming, Reading, Listening to music and playing of Chess.
PROFESSIONAL MEMBERSHIP
Member, American Society of Civil Engineers
Membership no: 382286
Chartered Civil Engineer ICE (On-going)
Membership no: 614 41255 (UK)
TRAINING PROGRAMMES
Engineering Construction Industry Training Board, Safety Training (Hertel Services, UK)
Environmental Management in Construction Course (Biwater)
Shell Safety Training and Fire fighting course
Biwater Treatment Limited Safety training course
REFERENCES
Dr. Bryn Jones,
School of Civil Engineering and Geosciences,
University of Newcastle Upon Tyne,
Newcastle Upon Tyne, England, NE1 7RU
Email: bryn.jones@ncl.ac.uk
Phone: +44 191 222 8938
Graham Cooper,
Senior Civil Engineer,
Hertel Services UK,
% BASF Chemical Company,
Middlesbrough, TS2 1TX.
Email: graham.cooper@hertel.co.uk
Tel: 016425422420
Eric Griffith
Senior Civil Engineer
Ham Construction, UK.
Tel: 07980304839
Download