Colorado State University
RIC Imaging Suite Build-out
Installation Verification Checklist AEI Project #:10917-00
By signing below, the contractors certify the system is complete and ready for functional testing. All supporting systems and equipment are operating within design parameters. The attached installation verification checklist is being submitted supporting system completion. Only parties having direct knowledge have completed the items listed.
Installation Verification Checklist Contractor, Subcontractor and/or Representative Signatures:
Controls Contractor Name: Controls Contractor Signature: Date:
Construction Manager Name: Construction Manager Signature: Date:
Commissioning Agent has reviewed the required documentation and Approve Disapprove Approve as Noted the above named system ready to undergo functional testing.
Notes:
Completed Installation Verification Checklist Reviewed by Commissioning Agent:
Name Signature Date
Colorado State University
RIC Imaging Suite Build-out
Installation Verification Checklist AEI Project #:10917-00
1.
Calibration Checks
A. Check calibration of a random sample of sensors. Verify sensor reading is within the following specified tolerances:
Thermistors or Solid State Sensors: +0.5°F
Room Temperature Device (RTD): o 32°F – 600°F: +-1.0°F
Thermocouple: o 32°F – 1300°F: +-2.0°F
Outdoor Air Temperature & Humidity: o 40°F – 120°F: 0.54°F at 68°F o 0% - 100% RH: 2%
Duct Humidity: o 0% - 100% RH: +-2%RH
Wall Mounted Humidity: o 0% - 100% RH: +-2% RH
Air Differential Pressure: +-1%
Hi Static Pressure Safety Switch: 3% repetitive accuracy.
Water/Liquid/Steam/Refrigerant Pressure:
+-1% full scale
Air/Vacuum Pressure: 1% full scale accuracy
Analog Output Transducers: 2% full scale
Time Delay Relays: +-2% of setting
Air Pressure Gauges: +-2.5%
Current Transducers: +-0.5%
Voltage Transducers: +-1/2%
Carbon Dioxide Sensor: 20°C
(20ppm+1.5% of reading
Calibration Preformed by:
Controls Contractor Name:
Calibration Equipment Used:
Name / Model:
Controls Contractor Signature: Date:
Serial Number: Date of Last Calibration
Colorado State University
RIC Imaging Suite Build-out
Installation Verification Checklist - Controls Checkout
2.
Sensor Calibration Checks
A. Check calibration of a random sample of sensors. Verify sensor reading is within the following specified tolerances:
Sensor & Location
Location
OK
1 st Gage or
BAS Value
Instr. Meas’d
Value
Final Gage or
BAS Value
Pass
Y N
AEI Project #:10917-00
Controls
Contractor Date and Name
CxA Spot Check
- 5% Sample
Discharge Air Humidity
Zone Humidity
Colorado State University
RIC Imaging Suite Build-out
Installation Verification Checklist - Controls Checkout AEI Project #:10917-00
3.
Device Calibration Checks
Check calibration of a devices (valves, dampers, actuators, etc.). Verify device reading at BAS compared to actual condition observed at device is the same.
Device or Actuator &
Location
Procedure or
State
1st BAS
Value
Control
Reading
Site
Observation
Pass
Y N
Controls
Contractor Date and Name
CxA Spot
Check - 5%
Sample
Humidifier Output Override To 100%
75%
50%
25%
0%
Colorado State University
RIC Imaging Suite Build-out
Installation Verification Checklist - Controls Checkout
4.
Point-2-Point Checks
AEI Project #:10917-00
UI IN-1
UI IN-2
Humidifier
Humidifier
UI IN-3
Humidifier
UI IN-4 Humidifier
UI IN-5
Humidifier
UI IN-6 Humidifier
BI IN-7
Humidifier
BI IN-8 Humidifier
BO OUT-1
Humidifier
BO-OUT-2 Humidifier
BO OUT-3
Humidifier
CO OUT-4 Humidifier
CO OUT-5
Humidifier
CO OUT-6 Humidifier
CO OUT-7
Humidifier
AO OUT-8 Humidifier
AO OUT-9 Humidifier
DA-H
ZN-H
HUM-O
Discharge Air Humidity
Zone Humidity
Humidifier Output
END OF SECTION
Controls
Contractor Date and Name
CxA Spot Check
- 5% Sample