IVC Controls Checkout

advertisement

Colorado State University

RIC Imaging Suite Build-out

Installation Verification Checklist AEI Project #:10917-00

Installation Verification Checklist - Controls Checkout

Humidifier System

By signing below, the contractors certify the system is complete and ready for functional testing. All supporting systems and equipment are operating within design parameters. The attached installation verification checklist is being submitted supporting system completion. Only parties having direct knowledge have completed the items listed.

Installation Verification Checklist Contractor, Subcontractor and/or Representative Signatures:

Controls Contractor Name: Controls Contractor Signature: Date:

Construction Manager Name: Construction Manager Signature: Date:

Commissioning Agent has reviewed the required documentation and Approve Disapprove Approve as Noted the above named system ready to undergo functional testing.

Notes:

Completed Installation Verification Checklist Reviewed by Commissioning Agent:

Name Signature Date

Colorado State University

RIC Imaging Suite Build-out

Installation Verification Checklist AEI Project #:10917-00

Installation Verification Checklist

Humidifier System – Controls Checkout

1.

Calibration Checks

A. Check calibration of a random sample of sensors. Verify sensor reading is within the following specified tolerances:

Thermistors or Solid State Sensors: +0.5°F

Room Temperature Device (RTD): o 32°F – 600°F: +-1.0°F

Thermocouple: o 32°F – 1300°F: +-2.0°F

Outdoor Air Temperature & Humidity: o 40°F – 120°F: 0.54°F at 68°F o 0% - 100% RH: 2%

Duct Humidity: o 0% - 100% RH: +-2%RH

Wall Mounted Humidity: o 0% - 100% RH: +-2% RH

Air Differential Pressure: +-1%

Hi Static Pressure Safety Switch: 3% repetitive accuracy.

Water/Liquid/Steam/Refrigerant Pressure:

+-1% full scale

Air/Vacuum Pressure: 1% full scale accuracy

Analog Output Transducers: 2% full scale

Time Delay Relays: +-2% of setting

Air Pressure Gauges: +-2.5%

Current Transducers: +-0.5%

Voltage Transducers: +-1/2%

 Carbon Dioxide Sensor: 20°C

(20ppm+1.5% of reading

Calibration Preformed by:

Controls Contractor Name:

Calibration Equipment Used:

Name / Model:

Controls Contractor Signature: Date:

Serial Number: Date of Last Calibration

Colorado State University

RIC Imaging Suite Build-out

Installation Verification Checklist - Controls Checkout

2.

Sensor Calibration Checks

A. Check calibration of a random sample of sensors. Verify sensor reading is within the following specified tolerances:

Sensor & Location

Location

OK

1 st Gage or

BAS Value

Instr. Meas’d

Value

Final Gage or

BAS Value

Pass

Y N

AEI Project #:10917-00

Controls

Contractor Date and Name

CxA Spot Check

- 5% Sample

Discharge Air Humidity

Zone Humidity

Colorado State University

RIC Imaging Suite Build-out

Installation Verification Checklist - Controls Checkout AEI Project #:10917-00

3.

Device Calibration Checks

Check calibration of a devices (valves, dampers, actuators, etc.). Verify device reading at BAS compared to actual condition observed at device is the same.

Device or Actuator &

Location

Procedure or

State

1st BAS

Value

Control

Reading

Site

Observation

Pass

Y N

Controls

Contractor Date and Name

CxA Spot

Check - 5%

Sample

Humidifier Output Override To 100%

75%

50%

25%

0%

Colorado State University

RIC Imaging Suite Build-out

Installation Verification Checklist - Controls Checkout

4.

Point-2-Point Checks

AEI Project #:10917-00

UI IN-1

UI IN-2

Humidifier

Humidifier

UI IN-3

Humidifier

UI IN-4 Humidifier

UI IN-5

Humidifier

UI IN-6 Humidifier

BI IN-7

Humidifier

BI IN-8 Humidifier

BO OUT-1

Humidifier

BO-OUT-2 Humidifier

BO OUT-3

Humidifier

CO OUT-4 Humidifier

CO OUT-5

Humidifier

CO OUT-6 Humidifier

CO OUT-7

Humidifier

AO OUT-8 Humidifier

AO OUT-9 Humidifier

DA-H

ZN-H

HUM-O

Discharge Air Humidity

Zone Humidity

Humidifier Output

END OF SECTION

Controls

Contractor Date and Name

CxA Spot Check

- 5% Sample

Download