APPLICATION FOR THE RENEWAL OF
A MINING PERMIT
IN TERMS OF SECTION 27
OF
THE MINERAL AND PETROLEUM RESOURCES
DEVELOPMENT ACT, 2002,
(ACT NO. 28 OF 2002) (The Act)
2
STANDARD DIRECTIVE
All applicants applying for the renewal of a mining permit are herewith, in
terms of the provisions of Section 29 (a) of the Mineral and Petroleum
Resources Development Act, directed to specifically submit an application for
such renewal to the relevant Regional Manager, which application must
provide the specific information in the format required herein. The
information requested herein is intended for small scale mining operators,
and any permit holder may be required by the Regional Manager to provide
further detailed information in addition to that required herein.
The Regional Manager
REGION
1. DETAILS OF THE APPLICATION.
1.1. Applicant details
ITEM
Name
Tel no
Fax no:
Cellular no
E-mail address
Postal address
1.2. Permit details
PERMIT
REFERENCE
NUMBER
MINERALS STATED
IN THE PERMIT
RENEWAL PERIOD
REQUIRED
CONTACT DETAILS
3
2. ACTUAL MINING RESULTS AND FORECAST FOR THE RENEWAL PERIOD
ITEM
TOTAL
DURING THE
PERMIT PERIOD
EXPECTED
TOTAL DURING
THE RENEWAL
PERIOD
TOTAL
TOTAL
R’000
R’000
PRODUCTION
The mass or volume of the product to be
produced in each quarter, either in tons, m 3,
grams, carats, etc., whichever is applicable.
ITEM
PRICE
The price received for the mineral sold
REVENUE
The mass or volume of production multiplied by
the price
OPERATING COST
Operating cost of stores, materials, electricity,
water, fuel and other
TECHNICAL COMPETENCE COST TO BE
PROVIDED FOR
Cost of salaries, wages, labour, service providers,
subcontractors, etc.
ENVIRONMENTAL COST
CAPITAL AND OTHER
The cost of land, machinery, the plant, buildings
and infrastructure.
WORKING PROFIT / LOSS
The revenue minus all the costs listed above
3. Map of the mine and rehabilitation
(Provide a map of the mining area, showing the excavations, all stockpiles, dumps, dams, roads, buildings,
plant areas together with their arial extent, and indicate therein the areas that are already rehabilitated, the
areas not yet rehabilitated and the areas to be mined during the renewal period. The map may be attached
as an appendix)
4
4. Actual Environmental during the permit period and estimated cost during
the renewal period.
ACTIVITY
Mark with X which activities
are applicable
MITIGATION
MEASURES
Rehabilitation
Excavating
Dust control
measures
Noise control
measures
Blasting
Stockpiles
Storm water system
Access control
measures
Rehabilitation
Dust Control
Measures
Storm water system
Rehabilitation
Discard dumps or
dams
Loading, hauling and
transport
Dust control
Measures
Storm water system
Noise control
measures
Dust control
Measures
Water supply dams
and boreholes.
Accommodation,
offices, ablution,
stores, workshops
etc.
Rehabilitation
Rehabilitation
Noise control
measures
Processing Plant
Dust control
Measures
Storm water system
Rehabilitation
TOTAL
STATE ACTUAL
ENVIRONMENTAL
COST DURING
THE PERMIT
PERIOD TO DATE.
STATE THE
ESTIMATED
ENVIRONMENTAL
COST FOR THE
RENEWAL
PERIOD
5
5. FINANCIAL PROVISION
(Provide a calculation of the quantum, based on the map and dimensions provided in respect of
rehabilitation still to be completed as shown on the plan in paragraph 3 above, which quantum must be
calculated in accordance with the guideline contemplated in Regulation 54)
6. FINANCIAL AND TECHNICAL COMPETENCE
(Provide the mine’s or the applicant’s latest bank statement to meet the financial and technical competence
requirement)
7. MOTIVATION FOR THE RENEWAL PERIOD.
(The applicant must provide short explanation (not more than one page) why the mineral deposit in the
permit area was not mined out during the two year period of the initial permit, and provide an estimate as to
how long it will take to mine the permit area completely at the current rate of production ).
8. IDENTIFICATION OF THE APPLICATION
Herewith I, the person whose name and identity number is stated
below, confirm that I am the Applicant or the person authorised to Act
as representative of the Applicant in terms of the resolution submitted
with the application, and confirm that the information provided above
constitutes the official application for the renewal of the mining permit
in terms of the provisions of Section 27 of the Act.
Full Names and
Surname
Identity Number
-END-