2.4 Case Studies: Multiple and Sequential Land Use

advertisement
Background Document
December 2013
Executive Summary
Access to land, under clear and efficient processes that take into account environmental, heritage,
cultural values and land ownership issues, is fundamentally important to the successful management
of competing interests of mining, energy, agriculture, environment, community and other significant
land users.
On 10 June 2011, State, Territory and Australian Government Ministers responsible for resources and
energy portfolios endorsed the development of the Standing Council on Energy and Resources
(SCER) Multiple Land Use Framework (MLUF).
The MLUF is designed to be used by decision makers, primarily regulators, to achieve multiple and
sequential land use outcomes that:

Utilise land for different purposes simultaneously and sustainably within an area, with a view
to maximising the benefits for all Australians, and to retain options for current and future uses
to maximise net benefits to present and future generations.

Utilise land sequentially, enabling land to be used later for another purpose once the current
land use has ended or been terminated, noting sequential land use may be a reinstatement of
the former land use or development of an alternative land use.
The MLUF features:

Four desired outcomes;

Eight principles to guide land access and land use decisions; and

Nine components to consider in planning, preparing and assessing land access and land use
decisions.
Desired Outcomes

Shared commitment by government, industry and the community to multiple and
sequential land use – Minimise incidences of conflict over land use by improved ability to
recognise differing needs and benefits to all stakeholders early, then using a risk-based
approach to mitigate adverse impacts and realise mutual benefits.

Better informed public discourse – Increased transparency and consistency in land use
decisions, public access to relevant information, improved understanding of land access
regulations relevant to each activity, as well as recognising the benefits of coexistence and
collaboration through multiple land use approaches.

Merit based land use decisions – Ensure land is not designated for a single use only,
excluding other potential uses, without fully understanding the consequences. Providing certainty
for industry and improved community confidence in land use decisions.

Deliver acceptable outcomes for affected communities and landholders – Promote the view
that multiple and sequential land use approaches can be benefit all stakeholders and engender
greater confidence in, and positive engagement by, communities and landholders affected by
industry developments.
The MLUF is underpinned by a comprehensive research study that examined issues at play in
multiple and sequential land use and the possible ways of addressing these issues based on leading
practice approaches. The research study included stakeholder consultation, situation analysis and
international leading practice.
A range of key stakeholders across jurisdictions and peak bodies were consulted to better understand
current and emerging land access and land use issues confronted by all legitimate land uses in
Australia arising from the implementation of current policies and planning systems.
Stakeholders strongly supported the development of the MLUF, recognising the significant potential to
improve the efficacy and workability of interactions between regulated land users, land use regulators,
The Multiple Land Use Framework
2
communities and landholders, which can demonstrate a shared commitment to maximising the social,
economic, environmental, and heritage value of land environments.
Focus was also given to the assessment of leading practice to address these issues, through careful
examination of international and Australian case studies. The elicited leading practice and guidance
from stakeholder consultations then contributed to the formulation of the MLUF.
Guiding Principles
The MLUF guiding principles underpin key areas of activity required to achieve multiple and
sequential land use outcomes. The principles should be embodied into the mindset of governments,
community and industry in land use planning, policy and development.

Best use of resources – Maximise the social, economic, environmental and heritage values of
land use for current and future generations.

Coexistence – The rights of all land users are recognised and their intentions acknowledged and
respected. Ensure land use decision making does not exclude other potential uses without
considering the benefits and consequences for other land users and the wider Australian
community.

Strategic planning – Inter-governmental planning to recognise community expectations and
capacity to adapt to land change. Effective planning gives greater certainty to industry.

Tailored participation of communities and landholders – Directly affected landholders should
be informed and consulted on multiple land use options and potential for coexistence to promote
a greater understanding of mutual benefits and to resolve problems.

Engagement and information – Open and constructive debate and analysis of different multiple
land use options. Stakeholders should be willing to listen and appreciate the views, concerns and
needs of all land users.

Decision making and accountability – Risk-based approach in the assessment of land use
capability, including the benefits and consequences. Clear accountability and governance around
the decision-making process.

Efficient processes – Streamlined, transparent and consistent approvals processes. Those who
are responsible for the planning, assessment and approvals processes are clearly identified.

Accessible relevant information – Easy access to accurate information regarding land
capability, and examples of multiple and sequential land uses.
The MLUF is capable of both pre-empting and responding to land access and land use challenges,
thereby helping build the capacity of communities and the private sector to address challenges. The
MLUF components are a blend of adaptive capabilities (leadership, partnerships, planning,
engagement, information and continuous improvement) and technical solutions (assessment and
approvals processes underpinned by sound scientific and engineering guidance and practice).
Components
The MLUF defines areas of activity, supported by the overarching principles (outlined above), that
must be part of successful multiple and sequential land use:

Leadership, Facilitation and Coordination – Strong leadership from government, industry and
the community is central to successful multiple/sequential land use outcomes. Articulate the
broad areas of responsibilities of government, industry and the community in terms of facilitating
and leading the required changes to optimise multiple and sequential land use.

Planning – Seek clarity regarding governments’ objectives and intentions. Describe the optimal
approach to enable regions to benefit from land use change.

Partnerships – Partnerships between industry and affected stakeholders play an important role
in achieving mutually beneficial multiple and sequential land use outcomes. Identify what needs
The Multiple Land Use Framework
3
to be done in order for regional communities to be prepared for land use changes. Extensive
stakeholder consultation assists decision making and avoids inappropriate development and/or
exclusion of land from other potential uses.

Engagement – Early engagement to enable stakeholders to clearly understand any proposed
land use activity. Progress a tripartite approach, with government, industry and community
working, to resolving policy, planning and investment conflict. Guidance as to how to engage with
key stakeholders with an interest or involvement in land access and usage issues.

Information – Education and the adoption of evidence-based approaches are important features
of successful multiple land use planning approaches. Inform the broader community, industry
and media about the importance of land access and land use to the future viability of all
industries and the ongoing sustainability of regions. Inform media and industry about what
governments are doing to protect the public interest with respect to regulating industry and
protecting social and environmental values.

Assessments and Approvals – Project approvals are streamlined through applying risk-based
approaches that are based on best available science, evidence and sustainable development
principles. Transparent and consistent approvals processes which account for multiple and
sequential land use, and identify related issues such as water, heritage and cultural values.

Monitoring and Compliance – Improvement in the transparency and understanding of how
government ensures industry compliance with conditions/regulations set to protect the public
interest. Increased confidence in the regulator through spend and efficiency in enforcement.

Continuous Improvement – Drawing on past experiences in decision making will improve
multiple and sequential land use outcomes. Outline the necessary coordination of investment
and the resulting outputs of the investment in the areas of activity, to better understand the
cumulative effects of land use change and development across economic, environmental and
social dimensions.

Sharing and Collaboration – Collaboration between organisations such as government or
industry bodies can support sharing of data and information, and assure of its quality, accuracy
and correct application. Provide mechanisms and opportunities for government, industry and
community to share land related information to identify potential issues and opportunities for
multiple and sequential land use outcomes.
The MLUF has been developed from a comprehensive research study completed by Sinclair Knight
Merz (SKM) during 2012, which identified multiple and sequential land use issues, challenges and
opportunities. The study analysed approaches to multiple and sequential land use both nationally and
internationally to identify common elements that are present for successful multiple and sequential
land use and for leading practice.
The MLUF does not propose any significant change in existing accountabilities, roles and
responsibilities of State and Territory government agencies. It does not seek to impose any additional
responsibilities onto resource companies. Rather, the MLUF seeks to achieve consistent performance
by the various participants in land access and land use planning.
Application of the MLUF is flexible, where not all components are necessary in all situations. Rather,
implementing the Framework relies on users selecting the right mix of components to achieve the
desired outcomes.
The Multiple Land Use Framework
4
Contents
Executive Summary ................................................................................................................................ 2
Contents .................................................................................................................................................. 5
1.0 Introduction ....................................................................................................................................... 6
1.2 Background ................................................................................................................................... 6
1.3 Aims .............................................................................................................................................. 6
1.4 Scope ............................................................................................................................................ 7
2.0 Comprehensive Research Study ...................................................................................................... 8
2.1 Stakeholder Consultation and Feedback ...................................................................................... 8
2.2 Multi-Perspective Analysis: Land Use ........................................................................................... 9
2.3 Policy and Planning..................................................................................................................... 15
2.4 Case Studies: Multiple and Sequential Land Use ....................................................................... 17
2.5 Leading Practice Multiple Land Use ........................................................................................... 17
2.6 Multiple Land Use Principles ....................................................................................................... 23
3.0 Issue Identification and Analysis ..................................................................................................... 25
3.1 Public Debate .............................................................................................................................. 25
3.2 Landholders and Communities ................................................................................................... 25
3.3 Assessment and Approval Regulations ...................................................................................... 26
3.4 Regional Strategic Growth Planning and Land Use Planning .................................................... 27
4.0 Conclusion ...................................................................................................................................... 28
4.1 Desired Outcomes ...................................................................................................................... 28
4.2 Guiding Principles ....................................................................................................................... 28
4.3 Components ................................................................................................................................ 29
Appendix A – Stakeholders Consulted ................................................................................................. 35
Appendix B – Case Studies .................................................................................................................. 36
Reference List ....................................................................................................................................... 41
The Multiple Land Use Framework
5
1.0 Introduction
Competing land use can give rise to conflict through disagreements originating from different
economic, social or ideological perspectives. Failure to accommodate, plan and resolve these
differences, real or perceived, can inadvertently sterilise land from land uses that benefit the wider
community. To address this, the Standing Council on Energy and Resources (SCER) commissioned
the development of a Multiple Land Use Framework (MLUF). The aim of the MLUF is to effectively
and efficiently meet the land access and land use challenges, expectations and opportunities.
1.2 Background
In recent times the pace and scale of growth of resource development activity across Australia has
been significant. Rapid advancements in exploration technology has made it possible to re‐examine
explored areas as well as explore in previously underexplored sensitive ecological, cultural,
agriculture and urban fringe areas.
Exploration investment in the minerals sector alone increased five‐fold between 2002/03 and 2012
(from $1,725 in 2002/03 to $2.5 billion in 2012). The number of exploration licences issued per annum
by State and Territory Government mineral and petroleum sector regulators trebled over the last
decade (from approximately 1,600 in 2001 to approximately 4,900 in 2010/11).
Growth has occurred in areas without a strong history of resource exploration and development (i.e.
resource extraction, processing, and transportation). In some instances, the manner whereby access
to land for resource development has been granted has caused concern for community, other land
users and land use regulators. This has led to community opposition and resource development either
being excluded or significantly restricted.
Historically, land use planning controls were introduced to regulate the conversion of highly productive
and/or strategically important farmland to rural residential or urban uses. The recent expansion of the
resources sector, especially in New South Wales and Queensland, has refocused this issue. Recent
reforms in some States and Territories have sought to more strongly regulate resources sector land
access. Most notably these include Queensland’s Strategic Cropping Land Act 2011 (and other
related amendments under the State Planning Policy) and News South Wales’ Strategic Regional
Land Use Plans.
1.3 Aims
The aim of the MLUF is to effectively and efficiently meet the land access and land use challenges,
expectations and opportunities. In doing so, the MLUF will play a key role in advancing Australia’s
sustainable development aspirations in energy security, mineral resource development, agricultural
production, greenhouse gas emissions reduction, biodiversity, heritage conservation and healthy
communities.
The Multiple Land Use Framework
6
1.4 Scope
Initially, the MLUF was intended to focus on facilitating multiple and sequential land use for the
resources sector (Box A). Targeted stakeholder consultation with land use regulators and peak bodies
representing community and private sector land use interests revealed significant support for an
all-regulated land use framework. To expand from a ‘minerals and petroleum sector regulated’ to ‘allregulated’ MLUF requires scaling from a ‘one to many’ (Figure 1) to a ‘many to many’ framework
(Figure 2). The latter enables adoption of common land access and use principles, methods and tools
to be applied by the respective land use regulator in land use decision making.
Box A – Multiple Land Use and Sequential Land Use

Multiple land use is where land is used for different purposes simultaneously and sustainably
with a view to maximise the benefits for all Australians. The objective is to retain options for
current and future use to maximise the net benefits of all forms of land use for present and future
generations.

Sequential land use involves different uses of land over time. It may include a return to a former
use or the development of an alternative land use.
Urbanisation
Defence
Agriculture
Tourism
Minerals
and
Petroleum
Sector
Commercial
Forestry
Conservation
Social and
Economic
Infrastructure
Indigenous
Land Use
Figure 1: A ‘one to many’ Framework
Urbanisation
Defence
Agriculture
Tourism
Commercial
Forestry
All land
use/all
sector MLUF
Indigenous
Land Use
Minerals and
Petroleum
Conservation
Social and
Economic
Infrastructure
Figure 2: A ‘many to many’ Framework.
The Multiple Land Use Framework
7
2.0 Comprehensive Research Study
A comprehensive research study was undertaken and completed by Sinclair Knight Merz (SKM)
during 2012, which identified multiple and sequential land use issues, challenges and opportunities.
The research analysed approaches to multiple and sequential land use both nationally and
internationally to identify common elements that are present for successful multiple and sequential
land use and for leading practice. Table 1 summarises the research undertaken.
Table 1: Summary of research undertaken to provide evidence base for the MLUF
Area of research
Overview of research conducted
Stakeholder Consultation
A range of key stakeholders across Commonwealth, State and Territory
governments and peak bodies were contacted to discuss their current
and emerging land use issues, responses and effectiveness to date, and
suggestions on the way forward (refer to Appendix A – List of
stakeholders consulted).
Land use
multi-perspective analysis
An in‐depth analysis of Australia’s principal land uses was prepared from
desk‐top research. Land uses included: minerals and energy (including
renewable), environment, agriculture, forestry, native title, heritage,
urban, defence, tourism, critical economic and social infrastructure
(transport, telecommunications etc.) and groundwater (a cross‐cutting
issue). Each land use was analysed in terms of its importance to
Australia, current and emerging land use conflict, and policy and planning
responses.
Policy and planning
analysis
Relevant Commonwealth, State and Territory and local government
policies and planning systems were reviewed in the context of competing
land uses and resource development.
Leading practice case
studies analysis
Five international and thirteen Australian case study analyses were
undertaken (Appendix 2). For each case study, lessons learnt and
elements of leading practice were identified. These were combined with a
wider literature review to establish current leading practice in land use
planning and management of land use conflict.
Multiple Land Use
principles analysis
Extensive analysis of land use planning, administration, governance
frameworks, conventions and principles, including:

Global – e.g. World Bank, United Nations, European Union;

Resources sector – e.g. International Council on Mining and
Metals, Minerals Council of Australia Enduring Value;

Public sector administration – e.g. National Strategy for
Ecologically Sustainable Development; and

Related disciplines – e.g. regional growth planning.
2.1 Stakeholder Consultation and Feedback
Targeted consultation occurred with stakeholders representing the private (minerals and petroleum,
agriculture, pipeline infrastructure), public (Commonwealth Government departments responsible for
environment, water, communities, agriculture, climate change, resources, energy, tourism, defence
and transportation/infrastructure policy) and community (public health associations, conservation)
sectors.
The Multiple Land Use Framework
8
There was universal support for the development of a MLUF across all jurisdictions and industry
sectors. All stakeholders agreed that the MLUF is a unique opportunity to help resolve land use
tension and conflict.
An outcome of stakeholder consultation was the need for guiding principles applicable across
jurisdictions that provide clear direction to policy, planning and development, and as such, the MLUF
has been developed to provide a more consistent approach to development and planning across all
jurisdictions aligned with COAGs broader policy commitment of Ecologically Sustainable
Development, whilst allowing flexibility for locally developed mechanisms targeted to local situations
and needs. The MLUF focuses on the guiding principles for the use of land (and all its values and
associated resources) for more than one purpose both in place and time and must consider the
broader ecologically sustainable development policy context.
2.2 Multi-Perspective Analysis: Land Use
This element of the research study analysed land use issues, policies and state and regional planning
systems in Australia.
Multiple and sequential land use issues and conflict were considered from the perspectives of
Australia’s principal land uses including resources, environment, forestry and agriculture to ensure all
views were considered in the design of a MLUF. All principle land uses were discussed in terms of
importance to Australia, current and emerging land use issues and policy responses.
Minerals and Energy
The minerals and energy industries include a range of subsectors. Depending on industry definitions,
some of these can overlap, such as in respect of the exploration and mining of coal that provides for
both a major mineral export and a domestic fuel source for power generation.
The minerals industry includes the exploration and extraction, as well as the associated minerals
processing sectors. The following provides a summary of the major classes of multiple land‐use
tensions for the energy and minerals industries.
Land access
While the existing regulatory frameworks around Australia require processes of stakeholder
engagement and fair compensation for land access and use, development proposals are often met
with strong sectional interests and concerns that may cause some land‐owners to prevent access to
their land. Broader third party interests may object to changes in land‐use on varying grounds,
therefore prompting resistance to land access. Indirect, but potentially valid concerns are not well
managed by some planning processes or policy responses.
Land tenure and use
Mineral resources are owned by the crown with State and Territory governments the principal
authorities for regulating onshore mining and exploration in Australia. Tension typically relates to the
challenge of co-existence, shared-use and sequential use. Changes in land use can trigger a diverse
pattern of support or resistance, in the context of complex, expansive, overlapping and often
competing interests.
Land tenure, in part, defines the process and stakeholders that are relevant in land use negotiations,
and the process and parties that may be relevant in any decisions regarding compensation for a
changed pattern of land use benefits, or for any degradation in the exclusivity in rights to ownership or
use. The form of land tenure can therefore be a trigger, and can shape the character, of land‐use
tension, and the manner in which it may be resolved.
Land access agreements are negotiated when a new form of co-existence or shared use is proposed
to an existing land use, for example installation of a wind farm or resource development. The purpose
of land access agreements is to secure development whilst recognising rights of landholders to
conduct their actives free from unreasonable interference or disturbance - including matters that affect
the enjoyment or economic use of the land by others, legal liability, restrictions and constraints on
The Multiple Land Use Framework
9
use, site maintenance and compensation. Agreements also provide for compensation where a
‘compensable loss’ due to a land use change. These issues are encouraging horizontal integration,
including investment in agricultural ventures by mining companies.
Issues associated with post‐investment land recovery and sequential land use
Effective mine closure plans can be a catalyst to improved land use options post mine closure. Post
mining land use for an area should be defined in consultation with relevant interest groups
(government, traditional owners, private land holders, local community etc.). The quality of mine
closure planning and how production waste and by-products (water, tailings or other waste streams
that may require specialist treatment and management) are managed through the life of mine will
affect options for sequential land use.
Prior to mine closure, a decision may be made to place the mine site in care and maintenance for
potential future development. This may occur for a variety of reasons including resource depletion,
lower ore grades, ageing infrastructure or less efficient technology. During care and maintenance,
resource companies maintain plant and equipment on site and actively manage environmental
aspects.
A perceived impediment to sequential land use is the reluctance of State governments to relinquish
mining tenure, leaving the mine in long term care and maintenance. Reluctance may be driven by
concerns regarding liability for poorly rehabilitated mine sites. Adoption of the MLUF approach aims to
reduce this risk through greater land use planning.
Equity issues and concerns for corporate social responsibility
Large and remote resource projects can trigger local community interests related to corporate social
responsibility that may extend beyond the domain of the affected operations. This may be related to
the potential burden of the venture on local systems and infrastructure, or by perceptions of fairness,
local citizenship and equity on behalf of stakeholders and affected persons. This is suggestive of a
type of land‐use impact that extends to local and regional communities.
Regulatory environment
There is a perception that regulatory processes may be too narrow, thereby not effectively managing
the breadth of issues or stakeholders that are relevant to investment projects. In some cases,
important issues are too tangential or digressive to the project, making them difficult to effectively
manage. Examples include cumulative impacts that are relevant to projects in aggregate, not in
isolation, as well as impacts of a national interest or security nature, that may be triggered by a
project, but are not solely caused by the project.
Impacts on landscape and amenity
Industry related land‐uses imply some extent of land transformation, of a temporary or permanent
nature. When land‐use is shared, either directly or indirectly, this may enhance, degrade or change a
pattern of land‐use benefits, or benefits that may be linked to an adjacent natural or built system or
service that is affected by the land transformation, including impacts on surface and groundwater.
Environment
The State of the Environment Report 2011 concluded biodiversity has declined since European
settlement. Human land use is the biggest threat to biodiversity, having both direct and indirect
effects. These threats include: harvesting of species, consumption of water, clearing and
fragmentation of native ecosystems, land clearing, urban development, extractive industries,
agriculture, production forestry, invasive species and pathogens and pollution.
The National Reserve System (NRS) is the main instrument by which Australia seeks to protect a
representative sample of remaining intact, native ecosystems. The NRS includes conservation parks
and reserves on both public and private land, as well as Indigenous protected areas. The NRS has
grown steadily over the past 15 years.
Over the past decade, steps have been taken towards better managing native ecosystems outside
reserves for conservation objectives. These have been largely through non‐government groups
investing philanthropic funds, and through government grants for projects to protect or manage
The Multiple Land Use Framework
10
remnant vegetation. There are 4,065 covenants on private land protecting 30,280 km 2 making up
under 0.5 per cent of the area of protected areas (largely in Queensland and South Australia). They
perform an important role in protecting biodiversity value on private land in the agricultural and
pastoral regions of Australia.
Land use conflict around mining and biodiversity
Mining has direct local impacts on habitat extent and quality, as vegetation is removed, and wider
spread ecosystem impacts due to transport systems on land. Mining is a major industry in many
regions but currently accounts for 0.02 per cent of land use.
Successful rehabilitation of mine sites allow substantial offset of initial impacts in the long term.
Environmental impacts are generally actively managed, with resource companies widely recognised
for frequently going beyond environmental regulation. However, the rapid expansion of the resources
sector is continuing, and the scale of disturbance in some regions is transforming the landscape and
causing environmental change. Notable examples include the Hunter and La Trobe valleys and the
Bowen Basin. The scale of expansion, particularly for gas in eastern and north Western Australia, is
resulting in conflict over land use and the environment.
Agriculture
Agriculture is the predominant user of land and water in Australia. Agricultural uses account for
60 per cent of land area or approximately 4.6 million km2. While irrigated agriculture occupies less
than one per cent of land area, it is responsible for about 65 per cent of all consumptive water use in
Australia. The direct value of agricultural production exceeds $40 billion annually, of which 29 per cent
is from irrigated production. The value added through food and beverage production is substantial.
Over recent decades, agriculture has faced considerable competition for land from urban and rural
residential uses, industrial‐scale forestry plantations and mining. Competition between consumptive
water users (e.g. mines, urban areas) and between consumptive and environmental uses of water is
reducing water availability for irrigation and influencing land use patterns in areas with a strong history
of irrigation.
Land use planning policies in most jurisdictions aim to limit the encroachment of non‐primary
production uses onto defined high value, prime or strategic farming land. Planning controls were
initially introduced to protect highly productive farming land from conversion to urban uses.
Most land use conflict involving the minerals and energy sector relate to land whose traditional use is
for agriculture. Conflict in extensively grazed rangelands areas that comprise the majority of
agricultural land is limited. Conflicts with agricultural land uses are most commonly confined to areas
where mining or energy exploration and developments are located on highly productive farming land.
In some cases conflict is exacerbated by competition for water and/or perceptions that mining and
energy developments will affect the quality of water available for agricultural uses.
Land use planning processes in most jurisdictions incorporate protections for productive farming land
with particular economic or social significance from encroachment of other land uses. These
processes are being strengthened in New South Wales and Queensland, where conflict between
mining or energy development and agriculture are most intense. While the approaches that are being
taken differ between the two states, they have a common focus on defining and protecting “strategic”
cropping or agricultural land.
Commercial Forestry
Intense conflict over the management of native forests led to the Commonwealth, State and Territory
Governments agreeing on a National Forest Policy Statement, which was followed up in the key
native forestry states (New South Wales, Victoria, Tasmania and Western Australia) by the Regional
Forest Agreement (RFA) process. The RFA process gathered an evidence base for strategic land use
planning and led to development of a comprehensive, adequate and representative reserve system in
native forests that were designed to protect key conservation values. Multiple use forests were also
identified that were intended to provide resource security for the native forest timber industry.
Regional communities and industry stakeholders were intensively engaged.
The Multiple Land Use Framework
11
The move to establish forest plantations on farming land rather than native forests addresses most
(but not all) concerns over their impacts on biodiversity. While questions of impact on water
resources, agricultural land use and rural communities remain, forest plantations are now treated in a
broadly consistent manner with other primary production land uses. Water issues are dealt with as
consumptive water uses (e.g. irrigation) under national water frameworks and via regional, state or
basin water resource planning processes. Like most other forms of primary production, plantations
are generally an ‘as‐of‐right’ land use and are not regulated under local government land use planning
processes.
The commercial forestry sector provides useful insights into land use conflict. Opposition to
commercial forestry focuses on some common issues, including impacts on biodiversity and related
conservation values, changes in the nature of rural landscape, potential effects on water quality and
water availability, loss of productive farming land, and change in rural communities.
The RFA process offers some critical insights. Several of its key features are worth considering in the
context of providing access to mineral and energy resources in ways that take account of
environmental, heritage, cultural and land ownership issues. These include: strategic planning;
developing an evidence base and common language; establishment of a scientifically comprehensive,
adequate and representative reserve system; social impact assessment and extensive community
and stakeholder engagement; commitments to long‐term resource security; and resourcing of the
underpinning studies, community engagement and strategic planning.
While the RFA process had many desirable features and some successes, it has not fully achieved its
core objectives. It has only reduced, but not eliminated land use conflict over native forests. While it
has improved resource security for the timber industry, the available resource has continued to
decline as a result of further extension of the formal nature conservation reserve system. Failure to
fully achieve the objectives of the RFA process reflects many factors, including underestimating the
implementation challenge and under‐resourcing implementation; failure to meet review and reporting
commitments; inadequate process to assess economic implications of land use planning decisions;
and the inability to bind non‐government stakeholders (particularly environmental groups and non‐
government organisations) to the process outcomes.
Culture and Heritage
There are increasing pressures on Indigenous and non-Indigenous heritage values from a range of
land use practices. Land use issues for cultural heritage include:

Land use change – Extractive land uses (e.g. mining) have a greater potential to impact
cultural heritage values than more passive land uses such as agriculture, where cultural
values can remain undetected for many sequential land uses; e.g. burial sites laying
undisturbed beneath fields or townships.

Scale of impact – Extractive uses are likely to impact on Indigenous heritage values,
particularly in Greenfield areas. Managing these activities is often problematic and may result
in the cultural heritage values being removed, which is then addressed through offsets or
compensation.

Cultural water flows – Water usage by the energy and extractive industries can impact on
cultural water flows by depleting, diverting, polluting or otherwise modifying the environmental
flows.

Cumulative impacts – The cumulative impacts of land uses on cultural heritage values are
poorly understood due to poor baseline information regarding the presence and value of
heritage locations, particularly Indigenous heritage resources.
Cultural heritage is a finite and often non‐renewable resource which can relate to both land and water.
Its preservation has in the past, and will in the future, require specific attention within the land use
planning process.
The Multiple Land Use Framework
12
Urban Development
Today, 64 per cent of Australia’s nearly 23 million citizens live in capital cities. This represents a trend
that is forecast to continue so that by 2056, 66 per cent of Australia’s population will live in capital
cities. In Sydney, Melbourne, Perth and Darwin, the urban populations will at least double during this
period. In all states except Queensland, population growth will become more concentrated and occur
at faster rates in capital cities than in the rest of the states. Queensland differs from other states in
that it enjoys multiple high growth regional centres, most of which are within two hours of Brisbane.
The land use issues associated with urban development include:

Population growth and distribution – Managing city and town centres that are experiencing
population and economic growth and city and town centres that are losing population and
experiencing declining economies.

Inconsistent strategic land use planning across Australia – While there is progressive efforts
to develop strategic land use plans in and around metropolitan centres, there remains a lack
of regional‐scale assessment. For high growth regions in particular, purposeful future land
use planning, can contribute to more effective use of land and significantly reduce
infrastructure investment supporting urban growth.

Peri‐urban development – Urban encroachment and sprawl on the fringe of our cities has
emerged as an important issue in the areas of land use planning, natural resource
management and conservation.

Climate change – Urban heat islands, sea level rise, increasing demands on energy and
water place strains on infrastructure and land use planning practices.
Tourism
Tourism contributes on average $23.6 billion to the Australian economy every year. Australia’s
inbound tourism market has changed in recent times with arrivals and expenditure by visitors from the
United Kingdom (UK), United States of America and Germany falling while the figures from China,
New Zealand, South Korea, Singapore, Malaysia and India all rising. China overtook the UK in 2010
with some $3.1 billion in tourism “exports” compared with $2.9 billion from the UK. A change in market
mix is likely to affect Australia’s key tourist markets. For example, UK and German tourists participate
in more nature based tourism activities than Chinese and other mainland Europe tourists, who have a
greater preference for the Indigenous tourism market.
Land use issues relating to tourism include:

Infrastructure – Tourism relies on the quality and availability of appropriate infrastructure,
including transportation, information services, accommodation and hospitality services.

Carrying capacity – Managing the maximum number of visitors without reducing its
environmental and cultural value.

Attraction accessibility – Most Indigenous and nature based tourism activities are located in
regional and often remote locations. Access may involve travel over unsealed roads that can
be difficult and even unpassable in wet weather. There may be no accommodation in these
desired areas or none of a quality that attracts many tourists.

Quality of accommodation – There is a demand for good quality accommodation in
appropriate locations including within or close to protected areas, including eco‐type
accommodation that must meet strict environmental criteria but also provide an appropriate
level of services.

Security of land tenure – Relatively short lease terms and the increased risk of investing in
regional and remote infrastructure has made regional tourism more expensive than standard
facilities and have reduced private investment interest.

Potential cumulative impacts – Cumulative impacts of multiple tourism developments and the
interaction of tourism with local communities can create conflict.
The Multiple Land Use Framework
13
Transport and Infrastructure
Australia’s productivity and national economic performance will be increasingly linked to its cities. In
Australia, State and Territory governments retain responsibility for metropolitan planning and
infrastructure planning for Australia’s cities and regions. The Commonwealth plays a support role to
these jurisdictions through the CoAG and through other agencies such as Infrastructure Australia.
Land use issues relating to transport and infrastructure include:

Infrastructure investment and links to economic prosperity – Governments and business
leaders alike realise that delivering on major programs of infrastructure are critical to
economic performance.

Infrastructure repair and development – Governments confront divergent choices in their
effort to fund essential maintenance or build expensive new systems while at the same time
controlling overall expenditures in constrained budget environments.

Financing challenges – Implementation of transport plans will increasingly be linked to the
capacity to deal with funding challenges. Government budgets will be increasingly strained as
competing priorities divert funds away from major projects. These funding gaps will need to
be bridged by innovative approaches including de‐risking projects for the private sector.
Defence
The role of the Australian Defence Force is to defend Australia against armed attack and to protect its
interests. To support this role, the Department of Defence (Defence) maintains the largest and most
complex land and property holding in Australia, comprising of approximately 389 properties (including
72 significant bases) and 25,000 assets. The estate falls in all states and territories of Australia and
gives Defence environmental stewardship over three million of hectares of land, including some World
Heritage Areas.
While Defence manages its lands with the primary objective of supporting its military capability,
Defence also aims to manage a significant suite of conservation and environmental management
responsibilities, predominantly those relating to the Environment Protection and Biodiversity
Conservation Act 1999. The Defence estate land use issues include:

Vast array of cultural heritage (indigenous and non-indigenous), environmental (endangered
and threatened species and World Heritage Listed areas) within the Defence estate.

Multiple land use has historically been problematic due to:
o
Restricted access for public safety;
o
Restricted access for national security; and
o
Imperative to maintain operational capability.

Contaminated sites and Unexploded Ordinance (UXO) providing barriers to future land uses.

Damage to flora and fauna and loss of biodiversity, bushfire risks, and feral species
introduction or proliferation.
Areas of the Defence estate also coincide with mineral deposits and energy reserves, where access
must be negotiated with Defence. The major considerations for Defence in assessment of access
proposals include:

Risk to national security through access to areas that have limited public access.

National security risks posed by foreign investment and access to sensitive Defence areas.

Risks to safety of people on Defence areas where weapons area testing or weapons training
is conducted.
Despite these conflicts of interest, the Commonwealth and the South Australian Governments
recognise the economic value of mineral and petroleum resources development and are working on
innovative solutions to balance the use of the land in support of Defence capability, while allowing for
realisation of their potential for benefits to regional, State and national economies.
The Multiple Land Use Framework
14
2.3 Policy and Planning
Current land use and access regulation and administration
The current legislative mechanisms used by State and Territory governments to regulate the activities
and behaviour of the minerals and petroleum sector are:

Land access and compensation agreements.

The licencing of resource development activities (exploration and extraction).

The use of zonings/land tenure to exclude/restrict resource development (exploration and
extraction) activities from high ecological and cultural sensitive areas.
There are key differences among State and Territory government licence approval processes,
conditions and methods of managing and resolving objections from interested stakeholders. There is
commonality though in the type of methods and tools used by states and territories to administer land
access and usage. These methods and tools are largely technical as they are applied to known
conditions, impacts and solutions (engineering, scientific etc.) but may not be as effective where
contested on the basis of people’s values and views.
“Technical” tools and methods include:

Guidance and information suitable to administering access and managing impacts;

Resource surveying/mapping;

Impact assessments (cost/benefit analysis etc.);

Codes of practice and compliance standards; and

Ongoing stakeholder consultation and monitoring and review.
The question that lies at the heart of the multiple land use is whether the current arrangements for the
regulating and administering land access and use will be effective over the next decade in light of the
emerging challenges, issues and opportunities.
Multi land use policy analysis: Commonwealth
Multiple and sequential land use is paramount to achieving national policy priorities. A number of key
aspirations of the Commonwealth Government are heavily dependent upon the government’,
community and private sector’s ability to equitably, effectively, efficiently and economically utilise land.
These include:

Carbon reduction and environmental conservation – Strategies relate to how industry can
contribute to reducing the impact of climate change and environmental damage through their
operations, investments and long‐term plans.

Energy security – Strategies prioritise the long‐term economic prosperity and energy security
of Australia.

Economic and industry development – Strategies promote the productivity and
competitiveness of industries, specifically agricultural development, through innovation and
technology improvements.

Community and population growth – Strategies encourage planning that supports sustainable
population growth, compatible with economic prosperity, communities and the environment.

Urban planning – Strategies address local, regional and national urban planning that allows
for sustainable city investments, including a focus on improvements in built infrastructure and
skills development.
The Multiple Land Use Framework
15
Multi land use policy analysis: State and Territories
The focus of State and Territory policy incorporates both sector‐specific planning and more recent
integrated planning frameworks that are based around achieving sustainable economic growth and
investment balanced with protection of the natural environment and individual property rights.
Key policy priorities of State and Territory governments addressing land use planning relating to
minerals and petroleum sector are:

Regional planning – State-wide strategic land use plans enveloping comprehensive regional
strategies and priority areas relating to the efficient and effective multiple use of land.

Sustainable economic development (multiple industries) – Strategies highlight economic
development as a key priority area.

Environment, nature conservation and climate change – Strategies look to address
fundamental concerns about the cumulative impact of mining activities on land and climate
change.

Liveable communities – Strategies encourage planning and development of liveable
communities at or around minerals and petroleum activities.
A broad analysis of policies across jurisdictions relating to land use and mining revealed some
common themes.

Multi-land use conflict – Concurrence of competing uses of land and resource values presents
significant challenges for local and regional planners to manage competing land use conflict.

Cumulative impacts – The negative cumulative impacts of mining are of concern, including
pro-longed exposure to noise and dust impacts, loss of agricultural land and further scarcity of
water resources.

Natural resource management – Greater mining activity has exacerbated concern about the
current and future management of natural resources such as land, water, soil, flora and
fauna.

Sustainable regional development – Creating liveable communities: Mining activity has
provided attractive employment options to regional areas but is often project driven and
transient.
Multi land use planning, assessment and approval instrument analysis
An analysis across States and Territories also revealed common planning, assessment and approval
instruments that are used to inform decisions around the identification/assessment of resources and
mining projects, and enforcement and review of outcomes against strategic policy areas.
All States and Territories have some form of Strategic Regional Planning approach or framework,
outlining the economic, social and environmental aspirations and goals of a region. Regional land use
plans take a ‘place/spatial’ perspective of the different instruments and cohesively understand the
economic, environmental and community drivers and needs to be satisfied at a ‘place’. Land use
planning processes in most jurisdictions incorporate protection for productive farming land with
particular economic or social significance from encroachment by other uses.
Additional common planning, assessment and approval instruments are:

Land capability analysis – Comprehensive mapping of all alternative land uses is used to
highlight and inform decisions regarding new mining projects.

Impact assessments (e.g. cost/benefit analysis) – Impact assessments are considered
important for understanding the complexity and multi-faceted effects of exploration and
extraction within and across generations.

Land access/licenses – Licenses are a mechanism used to regulate access to private and
public land for exploration and development.

Specific purpose zoning – Zoning of significant areas for extraction, agricultural,
environmental or urban use.
The Multiple Land Use Framework
16

Compensation agreements – Providing an appropriate level of compensation recognises and
clarifies expectations and rights of resource authority holders and private landholders relating
to how resource activities must be undertaken on private land.

Codes of practice and compliance standards – Codes of practice and compliance standards
ensure conformity with appropriate exploration and extractive operations that result in
consistent, transparent and appropriate investment and management decisions.

Leading practice guidelines – Leading practice guidelines are provided for a range of
operational considerations relating to exploration and extraction.

Fostering partnerships – Partnerships and strategic alliances are encouraged to assist
coordination and synergies in activities across difference land uses.

Ongoing stakeholder consultation – Plans are informed by effective stakeholder engagement
with key representatives whilst ongoing stakeholder reference groups are being used to guide
the execution and monitoring and review of the plan.

Monitoring and review – To deliver on outcomes, appropriate review mechanisms are and
continue to be developed.
2.4 Case Studies: Multiple and Sequential Land Use
The purpose of case study analysis was to understand the issues, identify pertinent ‘lessons learnt’
and determine elements of ‘leading practice’ in multiple and sequential land use principles and
frameworks. A summary of the case studies are at Appendix B and discussed in Section 2.5 in
relation to leading practice.
Specifically, the case studies:

Demonstrate the benefits of multiple and sequential land use.

Elicit principles that guide decision making in regard to accommodating multiple and
sequential land uses.

Identify the necessary attributes and features of a land use planning framework that
effectively enables multiple and sequential land uses (delegation of decision making powers,
critical considerations, mechanisms to resolve grievances, how negative externalities and
drivers that led to the preference for a single use have been addressed).

Highlight the processes, practices and systems used by ‘impacted’ entities (regulators, land
owners, industry, proponents, community, and non-government organisations) to identify,
consult, evaluate and approve/reject changes in land use.

Expose the skills, experiences and knowledge needed by ‘regulators’ to make evidenced
based decisions regarding land uses that are in the ‘public’ good and demonstrate/explain to
impacted and interested stakeholders the reasoning for those decisions.

Enable comparison with comparable international jurisdictions to help identify specific multiple
land use principles and framework components and elements which could be relevant to a
MLUF.
2.5 Leading Practice Multiple Land Use
The case studies analysis identified components consistent to achieving leading practice multiple and
sequential land use. The analysis identified ten themes to achieve leading practice multiple and
sequential land use planning approaches that achieve multiple and sequential land use:

Leadership, facilitation and coordination;

Planning;

Partnerships;

Engagement;
The Multiple Land Use Framework
17

Information;

Assessments and approvals;

Monitoring and reporting;

Continuous improvement;

Sharing and collaboration; and

Physical evidence of good community or environmental practice.
The analysis also supported that a blend of adaptive and technical responses is needed to achieve
multiple and sequential land use outcomes. Current approaches are largely technical. An adaptive
response seeks to build capacity of affected landholders, communities and the minerals and
petroleum sector to work together on key challenges, rather than solely creating and publishing more
‘technical’ guidelines and standards that are enforced through complex regulations.
Case studies that have used these adaptive and technical responses lead the resources sector to
better integrate and co‐ordinate with:

Economic development priorities and policies – Economic development policies that better
balance the economic benefits and land use impacts associated with the growth of the
minerals and petroleum sector with the interests of incumbent land uses.

Regional land use plans – Land use plans supporting economic development policies by
outlining priority areas relating to the efficient and effective use of land.

Environmental protection – Regulations and strategies better addressing fundamental
concerns about the cumulative impact of resource development projects on the inherent and
future value of land.

Liveable communities – Strategies that contribute to maintaining the liveability of communities
at or around resource development projects (skills training programs, improved social
infrastructure, more land release for affordable housing etc.).
Leadership, Facilitation and Coordination
Strong government, industry and community leadership is necessary to evaluate, negotiate and
introduce multiple/sequential land uses into the community. The key roles of industry and community
actors are to:

Enable communities to transition to new land use models;

Articulate the benefits and concerns of that transition; and

Effective communication through leadership and facilitation.
The Emscher Park International Building Exhibition (IBA) was launched as a comprehensive renewal
programme to restructure a difficult part of the German Ruhr district that had a legacy of contaminated
land and a redundant workforce. The programme was coordinated by IBA GmbH, a public limited
company.
The company’s role was not to realise projects itself, but rather to act as quality control for individual
initiatives. Projects were developed by a wide range of bodies, including private companies and
voluntary organisations, but most work was actually carried out by the public sector.
The approach adopted by the IBA involved no formal change in the administrative structure, but took
more informal methods to increase public participation, cross‐departmental cooperation and
architectural competitions. Key learning to be gained from this approach includes:

New linkages between industry and community actors;

Reduction in conflict and improved levels of consensus;

Sharing of resources;

Mutual support of project outcomes; and
The Multiple Land Use Framework
18

The approach encouraged projects that involved low levels of potential conflict.
Alcoa’s bauxite mining operations in south west Western Australia provide an example of the benefits
to be gained through strong industry leadership. Through active community engagement, investment
in community infrastructure and activities and employment opportunities, the benefits of Alcoa’s
operations are tangible and recognisable in the local community. Alcoa has also invested in scientific
investigations within, but also beyond the region within which they operate and have demonstrated
commitment to education programs, including public tours of their operations.
The actions demonstrated through the Emscher Park and Alcoa examples generate goodwill between
industry and communities and contribute to the granting of a ‘social license to operate’.
Planning
Governments and government agencies should set clear strategic priorities for what they want to
achieve and have an informed understanding of land capability. Planning should also consider
questions such as: What is the region’s preferred future? What are possible alternative futures? What
planning, investment and actions are needed to realise the preferred future? How will the region
transition to that future?
An effective integrated regional plan must:

Assess and prioritise ‘need’ at different temporal and spatial scales – Operate top down and
bottom up.

Deliver ‘value’ – Balance long term value and short term need; generate value from linking
growth investments to desired outcomes.

Be transparent – Any assumptions used to develop the plan must be transparent to all.

Be implementable – Recognise and co-ordinate strategic, operational and tactical level
interdependencies between different actors (industry, government, community).

Evolve – Monitoring, evaluate, report and evolve to maintain or reshape direction or strategic
priorities.
The objective of the Regional Strategic Environmental Assessment in Canada (R‐SEA) is to inform a
preferred development strategy and environmental management framework for a region and improve
management of cumulative environmental effects. The traditional approach to environmental
assessment in Canada has been to address the symptoms or outcomes of individual project impacts
and mitigating them until they are deemed acceptable rather than grappling with broader regional
environmental change and the cumulative effects on valued ecosystem components.
The R‐SEA in Canada is still in its early stages of development and is largely untested, however,
there are a number of anticipated benefits:

Analysing, identifying and managing cumulative environmental effects at the regional scale.

Considering strategic alternatives early in decision making, ideally before irreversible
development decisions are taken.

Informing the subsequent project environmental impact assessment and providing
opportunities to streamline the review process.

Establishing the context and direction for preferred regional environmental management plans
and frameworks.
During the 1980s open pit and underground mines were operating within the Golden Mile mining area
that is located adjacent to the City of Kalgoorlie‐Boulder, Western Australia. Kalgoorlie Consolidated
Gold Mines (KCGM) planned to expand its operations, consuming its existing open cut operations into
a single ‘Super pit’ that would then grow to take in parts of the Kalgoorlie‐Boulder (predominantly
Boulder) township. The Environmental Protection Authority (EPA) produced the Kalgoorlie
Environmental Protection Policy in 1987 that focused on noise and air quality (particularly sulphur
dioxide emissions) arising from mining activities around Kalgoorlie‐Boulder.
The Multiple Land Use Framework
19
The ‘Conceptual Plan for Mining Developments on the Golden Mile’ was produced that provided a
framework for future mining developments to be viewed in the context of the overall social and
environmental protection of the region. The conceptual plan established a clear separation between
mining and residential areas (as conflicting land uses) and other mining‐related areas such as waste
and tailings dumps. When combined with new town development plans and the new Environmental
Protection Policy, an integrated plan for the region was formed.
Partnerships
The formation of partnerships between industry and affected stakeholders require structured
processes (e.g. community liaison group/contact), defined roles (e.g. liaison officer, community
delegate) and incentives to formulate and sustain an effective, enduring relationship. Partnerships
should aim to achieve mutually beneficial outcomes that endure for the duration of the industry’s
involvement in the region.
The Land Governance Assessment Framework (LGAF) recognises that stronger industry and
community partnerships may be a potential solution to land use conflict issues. LGAF is a diagnostic
tool prepared by the World Bank for assessing the legal framework, policies and practices concerning
land and land use and has been piloted in Peru, Ethiopia, Kyrgystan, Tanzania and Indonesia. LGAF
comprises:

Five thematic areas for monitoring and assessment;

A set of 21 indicators, sitting below these main thematic areas; and

A series of 80 ‘dimensions’, sitting below these indicators.
For each dimension, four pre‐coded statements are presented. Assessors then determine which precoded statements best reflect the situation in that particular area. The outcome of this can then be
used as a basis for discussion and development by policy makers and development partners.
Another useful model for consideration is the Commonwealth Scientific and Industrial Research
Organisation (CSIRO) community development value chain framework. This approach is designed to
support the delivery of multiple public policy outcomes in ways that build local capacity and resilience.
The model is predicated on a taking a systems‐based, participatory approach to developing and
delivering responses to local needs.
Engagement
The process of including key stakeholders in setting policy and planning for the mineral and petroleum
sector is vital. Stakeholders should include peak bodies and key influencers who represent the
interests of the general public and enable other stakeholders to clearly understand the rationale for
land use activities and help resolve areas of policy, planning and investment conflict. These
stakeholders include those directly and indirectly impacted by the activities taking place and who have
an interest in the economic, social and environmental impacts.
Strong community engagement featured as a highly successful aspect of the IBA Emscher Park
rejuvenation in Germany. Involvement of the public was integrated through comprehensive
participation of local project and community groups from the planning phase of a project. The
engagement not only encouraged direct participation, but also played a vital role in stimulating change
in the mindsets of local residents to help them realise that change was needed and desirable.
Information
Information plays an important function in informing affected stakeholders of the costs and benefits of
a land use activity, and adoption of evidence‐based approaches are essential to reinforcing or
dispelling positive or negative perceptions. This includes using information and communication
mechanisms such as the media to deliver the key messages. For example, advising stakeholders
about the ‘true’ nature of the activities and the measures in place to recognise and protect public and
environmental interests can play a significant role in reducing conflict and resistance.
The Multiple Land Use Framework
20
The Woomera Prohibited Area (WPA) is a weapons testing range used by the Australian Defence
Force. Mining activities also occur in the WPA, and while security and economic interests are the
primary land uses, other land uses and interests include pastoral, Aboriginal native title claim groups,
as well as highly significant conservation values. The Commonwealth and South Australian
governments have established the Woomera Prohibited Area Coordination Office (WPACO) to
implement a time‐sharing co‐existence model with the aim of maintaining the value of the WPA as a
weapons testing facility, while increasing access for non‐Defence mineral resource development
opportunities. The WPACO acts as a ‘one‐stop‐shop’ for decision making on access to the WPA and
administers all non‐Defence access to the WPA. The ‘time share model’ requires delicate balancing
between the different uses and has resulted in:

Increased transparency of the key issues and drivers of each group;

Increased surety of access to the WPA for mining interests;

Increased investment in the region by the minerals sector and opportunities for regional
community development for both Indigenous users and pastoral communities; and

WPACO has been established as an example of an institutional innovation in the coordination of multiple land uses.
Assessments and Approvals
Consultation and assessment of land use activities or change (e.g. a mining development) should
make clear and explicit connections to statutory planning and assessment processes to avoid
inappropriate developments and/or sterilisation of land. Approvals, consultation and assessment
processes should:

Consider cumulative impacts and effects rather than single project direct impacts and effects;

Be risked based, for example if exploration activity is low impact, the licence should be
granted with minimal government intervention;

Be meaningful – depending upon the extent of the likely impact of proposed exploration and
extraction, engagement and negotiation with landholders should be meaningful, respectful
and fair; and

Be transparent – assessments of developments or projects should always take into account
public interest.
An example of effective assessments and approvals is illustrated by the Regional strategic
environmental assessment framework (R‐SEA) model of the Canadian Council of Ministers of the
Environment. Their approach allows for strategic, evidence based and region‐wide assessments that
accommodate consideration of cumulative effects, and different scenarios and preferences based on
a clear understanding of land capability and potential environmental thresholds and impacts.
The Queensland Government, in partnership with industry, is developing a clean, green aquaculture
industry. Fisheries Queensland has prepared the Great Sandy Regional Marine Aquaculture Plan
(GSRMAP) to allow non‐intensive marine aquaculture within the Great Sandy Marine Park, near
Bundaberg, Queensland. GSRMAP is a non‐statutory plan that is implemented and enforced through
the existing regulatory frameworks. It functions as a guideline for identifying suitable sites and
management measures; however, anyone wishing to conduct aquaculture will need to obtain the
necessary approvals under planning and fisheries legislation. The GSRMAP management framework
links to the statutory approvals process by specifying assessment criteria for new applications and
conditions of statutory approvals. The plan’s provisions are thus enforceable under the relevant
approvals legislation.
Monitoring and Reporting
On‐going monitoring of industry activities reduces community concern, ensures government
conditions are followed, but most importantly allows industry to identify potential hazards and respond
before serious consequences occur.
The Multiple Land Use Framework
21
The Mindarie Mineral Sands Project is located approximately 150 km east of Adelaide in an
agricultural landscape. The proponent Murray Zircon has the intention of mining the agricultural land
and rehabilitating the mined area back to agricultural land use after mine closure. The major
community concern is managing the shared land use between cropping and mining and the potential
impact on the agricultural value of the landscape. Other issues include:

The level of compensation to affected landowners;

Landowner concerns about rehabilitation performance and post mining agricultural
productivity;

Community concerns about haulage on local roads;

Community concerns about how the regulator (South Australian Department for
Manufacturing, Innovation, Trade, Resources and Energy (DMITRE)) will hold the company
accountable to rehabilitation commitments and minimising social impacts; and

Community concerns that the short term benefits of the mining operations do not adversely
impact the long term viability of agricultural activities.
In order to address some of these challenges Murray Zircon have undertaken the following actions:

Engaged with the affected landowners and negotiated compensation agreements to enable
land access for the company and suitable payment for loss of income to the landowner;

Setting clear closure outcomes that outline measureable crop yield targets;

Regular community meetings with open discussion sessions on all areas of concern and
clarity by the company to identify those issues out of its control yet still providing support on
these issues where possible; and

Ensuring the regulators (DMITRE, EPA) maintain transparency with the community
throughout the process and including management strategies within the operational approval
document.
Continuous Improvement
Carefully captured learning should contribute towards better strategic planning, as well as ideas for
innovative research. Continuous improvement contains several elements that when combined
contribute to better informed decision‐making that encourages more consensus and creates lasting
strategic direction. The application of emerging research or existing learning should be used to
actively seek new approaches and solutions to multiple land use issues or conflict. The key elements
of applied learning include:

Consideration of a ‘whole of system’ perspective (community, industry, government,
environment);

Understand the past, present and future impacts of the multiple/ sequential land use activities
on local social, economic and environmental needs and drivers; and

Make decisions that are informed by previous experience and look to continually improve
processes.
In England, the Community Forest Program (CFP) started in the 1990s to bring back nature to spaces
where the environment had been mined. Many Community Forests are newly planted, although some
incorporate ancient woods. A key plank of the Community Forest programme is to connect
regeneration, economic development, the environment and sustainable development. Long-term
learning and demonstration of the benefits of land use for several socioeconomic functions, also
helped to sustain and build community support for the multiple land use approaches.
The approach adopted towards Alcoa’s bauxite mining operations in south west Western Australia
provides an adaptive planning and management framework in which state and local governments,
government agencies, affected landholders and the proponent (Alcoa) all contribute to the project
outcome.
The Multiple Land Use Framework
22
While, the primary purpose for Alcoa is to derive economic benefit, the framework established
commits the company to incorporating environmental and social benefits into the project. An example
of this is the ongoing research into rehabilitation, water management and ‘dieback’ management. The
research funded by Alcoa has derived best management rehabilitation practices which are now
applied more broadly across different environments and land uses. Alcoa has received many global
and national awards for their rehabilitation methods.
Sharing and Collaboration
In addition to shared platforms of information sharing, strong collaborations can also act as a platform
to capture and share learning, towards a flexible and evolving approach to leading practice decision
making and land management. The Land Governance Assessment Framework (LGAF) programme of
the World Bank, for example, encourages public provision of land information in the participating
countries, as a basis and starting point for shared and collaborative decision making.
Physical Evidence of Good Community or Environmental Practice
Success of the CFP in England is evidenced by the establishment of over 10,000 hectares of new
woodland, while the 10 years of the Emscher Park project in Germany has seen the reclamation of
1,500 hectares of brownfield land, including regeneration of 17 derelict sites previously occupied by
mines and steelworks to uses such as technology centres.
In the case of the Queensland Government’s Great Sandy Regional Marine Aquaculture Plan
(GSRMAP), the following benefits were identified:

Strong community engagement and active management of community expectations;

Documenting and providing feedback to stakeholders, including a history of revisions outlining
advice received and government responses;

Clear delineation of potential uses;

Adaptive management approach adopted, which contributes to communities feeling in control
over what is happening around them and confidence in the ability of government (particularly
environment agencies) to intervene if required; and

Tangible evidence of the benefits through regional employment and infrastructure.
2.6 Multiple Land Use Principles
The principles identified generally support the underpinning proposition of the MLUF that land should
not be put to a single use without considering the implications or consequences for other potential
land uses.
International principles, frameworks and conventions
A careful analysis of the international frameworks, charters and principles highlighted a concern for
ensuring intra and inter‐generational equity and sustainability. In general, there were seven common
themes that were consistent amongst the different international land use frameworks:

Resource maintenance and efficiency – Use of sustainable natural resource management,
minimising waste and optimising productivity.

Livelihood sufficiency and opportunity – Establishment of local economies and markets,
improving future employability.

Socio-ecological integrity – Preservation of native environment and community values,
considering local conditions.

Strong democratic governance – Adherence to law and international conventions and
standards, respecting human rights.
The Multiple Land Use Framework
23

Intra-generational equity – Provision of equal or higher economic compensation for exchange
of property rights.

Respect for Indigenous communities and cultural heritage – Incorporation of aspects of local
customs into projects, acknowledging the beliefs of all stakeholders.

Immediate and long-term integration – Balance of short-term goals with requirement for
longevity; applying an approach to planning that supports durable infrastructure.
The Multiple Land Use Framework
24
3.0 Issue Identification and Analysis
The MLUF will need to address an increasing number of complex, contestable and dynamic
challenges to securing reliable, predictable and timely access to land.
3.1 Public Debate
The public debate regarding resource development varies. Groups opposed to resource development
are characterised by emotive language, worst case scenarios and poorly validated evidence. This has
been viewed by other stakeholders as reducing the reliability and predictability of access to land. The
public discourse is heavily influenced by:

The ‘language of entitlement’ occasionally used by the resources sector can be offensive to
other land uses. Stakeholders consulted regularly indicated that the ‘language of entitlement’
can often trigger confrontation with other land users. While land access may be a legal right
for resource development activities, language that implies land access can be immediately
assumed without question is deemed ‘offensive’ by other land uses, land use regulators and
communities. The MLUF must recognise and respect the needs and interests of other land
uses and communities, especially pre‐existing occupiers or users.

Broader narratives e.g. best mechanism to distribute the wealth from the ‘resources boom’,
public debate regarding issues such as the Carbon Tax and Fly-In-Fly-Out (FIFO) workforce
arrangements.

Government’s role is perceived as being conflicted (both regulator and collector of royalties).

Examples of highly publicised poor landholder consultation by exploration firms ‐ It was
reported that intermediaries such as State/Territory Farmers Federation bodies are being
used for landholder consultation in lieu of individual land owners or tenants as this is seen as
a lower cost approach for exploration firms.

Vested interest groups (non-government organisations and industry lobby groups) are
becoming more co‐ordinated and sophisticated.

There are individuals and institutions that possess deeply held ideological views regarding the
legitimacy of exploration and extraction. Regardless of any reputable/verifiable evidence to
the contrary they will continue to view and describe the minerals and petroleum sector as it
operated in the 1970s.Difficulties easily identifying and understanding the “non‐ national”
economic benefits generated by resource development projects. The national and
state/territory economic benefits of resource development projects are well publicised; less
well known are the social and environmental benefits. It takes a significant amount of
searching to uncover relatively easily understood environmental benefits e.g. in the case of
water usage by using saline to hyper-saline groundwater the resource development projects
can provide surplus water to other adjacent land uses. Similarly locating clear and concise
information on the recognised social benefits is time consuming e.g. training, apprenticeships,
scholarships and work experience, funding of community services and infrastructure,
sponsorship of local events, services, charities and community organisations, revenue and
employment for Indigenous Australians.
3.2 Landholders and Communities
A frequent stakeholder discussion topic was the acknowledgement that many communities and
landholders were under‐prepared for the pace and scale of development projects. The issues
associated with community and landholder readiness for very large scale or multiple small footprint
development projects were:

Lack of clear planning regarding how communities will be prepared for development projects.
In some instances, there was no well understood plan or direction to guide development to be
consistent with community values and their capacity to adapt to the implications of the land
use change. Therefore some communities perceived that a single development was the start
of a long term trend and more of the same to come.
The Multiple Land Use Framework
25

Communities perceived they were not receiving back tangible benefits to offset the perceived
or real impacts. The ‘hollowing out effect’ was regularly cited. The community’s livelihood has
traditionally been associated with a few different land uses and the arrival of development
projects is perceived to threaten that livelihood.

Concern about health impacts of unfamiliar development activities in their area e.g. dust.

Landholders are unclear regarding their property rights. Many landholders have been required
to negotiate access agreements to their land and some have reported to their peak bodies
that they are unclear regarding their property rights. Landholders have reported that often
they were required to negotiate separate agreements with multiple entities for the same
development project e.g. access, pipeline construction.
3.3 Assessment and Approval Regulations
There was general recognition by stakeholders that current regulations could be improved so as to
lower costs to government and industry and strengthen public/community confidence.
The common regulatory issues cited by stakeholders were:

The basis for determining whether a development can proceed in a highly regulated area
should not be a drawn out process. There should be key decision points based on activities
that inform whether a development should proceed, for example exploration, as it allows for
data to be examined before a decision on whether to proceed with a development, or exclude
development, is made.

Areas should only be temporally excluded from development as long as the Government is
making a fully informed decision regarding the consequences of exclusion or greater
restrictions, noting circumstances change over time, and future advances in technology may
support development in areas where it is considered an incompatible today. The rationale for
exclusion must be transparent for all.

If outright exclusion should be the last resort, exclusion should only occur where is it very
clear that development activity creates value that is deemed to have a higher economic,
social and environmental value than resource development, and would be impacted by such
activity.

Lack of clarity and transparency regarding regulatory mechanisms to evaluate the social and
economic impacts of development projects. State and Territory government environmental
assessment regulations are reported as being used to justify reasons to reject or place
significant restrictions on resource development projects for primarily social impact reasons
e.g. potential health impacts.

Clear regulator expectations for assessing cumulative impacts. Stakeholders widely
supported the concept of assessing all development projects on the basis of their cumulative
impacts as this would provide greater insight into when development projects (as well as
other surrounding existing activities) exceed the social, economic and environmental
resources of a region. While strategic assessment instruments are available within various
States and Territories, they are similarly restricted to the ‘scope’ of the specific statute (e.g.
environment) and are used primarily for the assessment of cumulative impacts associated
with sequentially implemented resource and non‐resource development projects. Current
approaches need to be clarified regarding non‐environmental cumulative impacts that are
relevant to resource or non‐resource development projects in aggregate, not in isolation e.g.
impact on local employment conditions etc.

Cumulative impact assessments should inform policy responses. There is a common
sentiment within the minerals and petroleum sector that cumulative impact assessment
should inform policy responses to potential triggering of ‘regional thresholds’. The next
proposed development project should not be adversely assessed because it could potentially
exceed current social, economic and environmental capacity. It should be assessed in the
context of the policy response that would be needed to accommodate the development.
The Multiple Land Use Framework
26

Negotiating land access is overly confusing and complex by needing to identify and
understand the constraints on access and use of a myriad of different land tenures,
restrictions and exclusions.

Apparent duplication between Commonwealth and State and Territory legislation has led to
growing frustration within affected communities and the minerals and petroleum sectors. This
is being exacerbated by legislation within jurisdictions that prioritises a single land use over
others and the increasing area of Crown Land being classified as either exempt or restricted,
thereby excluding non‐conservation orientated land uses.

Environmental offsets are cited as a significant area of ‘green tape’. The complexity of
legislative requirements to provide environmental offsets under an exploration or mining
licence is becoming increasingly unworkable. For example, criteria for ‘like for like’ are leading
to some perverse outcomes. High offset ratios are also impacting other land uses,
necessitating land buyout for this purpose.

Complexity of obtaining approvals for multiple land use arrangements can dissuade smaller
resource companies from pursuing co‐existence benefits. The minerals and petroleum
sectors have sought out opportunities to turn challenging impact and waste management
issues into supporting and enhancing host and adjacent land uses. Such benefits however
have resulted largely from opportunistic synergies. Given that such resource development
projects generally require additional statutory approval under separate legislation
administered by different regulatory agencies, many smaller resource companies are
reluctant to incur the necessary costs to pursue such benefits.

Uncertainty regarding mine relinquishment regulations has resulted in an increasing number
of sites remaining in care and maintenance. A barrier to sequential land use is the uncertainty
regarding whether operators have fulfilled their relinquishment obligations, and the willingness
of government to sign-off on rehabilitation as complete to enable post-mine land use.
Governments are also inclined to keep access to former mine sites available for future
exploration and re‐evaluation of remaining resources as governments are reluctant to sterilise
any remaining resources left behind by resource companies. Governments are concerned
regarding signing off relinquished mine sites with hidden defects or liabilities that require
future costly remediation in order for the land to be used again. Community concern over
mining ‘endpoint’, and hence land access, may also be alleviated if sequential land use is
more effectively resolved.

Mechanisms for local councils to refer Development Applications to State and Territory
mineral and petroleum regulators are unclear. The triggers for a local council to refer a
Development Application are generally unclear and rely upon local councils having knowledge
of where medium to high value deposits may exist.
3.4 Regional Strategic Growth Planning and Land Use Planning
Many stakeholders cited the need for better Regional Strategic Growth Planning. Comments made
regarding the effectiveness of existing Regional Strategic Growth Planning included:

Strategic regional plans along the east coast of Australia appear to primarily plan for
population growth with land use, resource capabilities and vales being a secondary
consideration. Stakeholders indicated it was critical that governments retain a priority
investment in surveying for resource deposits and publishing this information.

Strategic regional plans tend to plan for a single, rather than multiple future scenarios and do
not adapt well to change. When change occurs, it may be perceived as not being in the plan
and therefore potentially resisted. Strategic regional plans have a tendency to be created,
used to guide government decision making, but are not well reported to inform local
communities on progress in implementing the plans.

The myriad and diversity of Commonwealth and State and Territory government policies and
plans (across different sectors, timeframes and spatial scales) makes strategic regional
growth planning extremely challenging and time consuming.
The Multiple Land Use Framework
27
4.0 Conclusion
By applying leading practices to identified land access and land use issues, the solution to achieving
multiple and sequential land use outcomes is a MLUF that comprises:

A set of principles for use by the resources sector and other land users that demonstrates a
commitment to maximising the social, economic, environmental, cultural and heritage value of
land and marine environments; and

A suite of mutually supportive methods and tools to better plan, prepare and assess land
access and land use decisions.
The MLUF is a blend of existing technical approaches, strengthened with more consistently applied
(in some cases new) adaptive methods and tools (components).
4.1 Desired Outcomes
The MLUF must better enable mutually beneficial co‐existence of resource development projects and
other legitimate land uses such as agriculture, conservation, commercial forestry, defence, indigenous
land use, urban development, tourism, and critical social and economic infrastructure (e.g. National
Broadband Network and High Speed Rail).
The desired outcomes from the MLUF are:

Shared commitment to multiple and sequential land use – Minimise conflict over land use
decisions by improved ability to recognise multiple needs and beneficial opportunities early
and implement effective risk based approaches to meeting needs, mitigating adverse impacts
and realising mutual benefits.

Better informed public discourse – Help balance the public discourse regarding the legitimacy
of resource development activity through increased transparency and consistency in land use
decisions and easier access to relevant fact based information about land access and use
regulations.

Merit based land access – Ensure land is not arbitrarily sterilised from other uses without
understanding the consequences, therefore providing certainty for industry and improved
community confidence in land use decisions.

Better outcomes for affected communities and landholders – Demonstrate and facilitate that
multiple land use can be accommodated in a manner that is beneficial to other landholders,
impacted communities and engender greater confidence in communities and landholders
impacted by resource development.
4.2 Guiding Principles
The MLUF principles (see Box B) are universal and do not promote the resource development sector
over other land uses. It will be essential that the principles are revisited every few years to ensure
they remain relevant and applicable. Changes in technology, community expectations, Australia’s
economic prosperity and environmental needs must be continually reflected and recognised in the
principles.
Box B – Multiple Land Use Framework Principles

Best use of resources – Maximise the social, economic, environmental and heritage values of
land use for current and future generations.

Coexistence – The rights of all land users are recognised and their intentions acknowledged and
respected. Ensure land use decision making does not exclude other potential uses without
considering the benefits and consequences for other land users and the wider Australian
community.

Strategic planning – Inter-governmental planning to recognise community expectations and
capacity to adapt to land change. Effective planning gives greater certainty to industry.
The Multiple Land Use Framework
28

Tailored participation of communities and landholders – Directly affected landholders should
be informed and consulted on multiple land use options and potential for coexistence to promote
a greater understanding of mutual benefits and to resolve problems.

Engagement and information – Open and constructive debate and analysis of different multiple
land use options. Stakeholders should be willing to listen and appreciate the views, concerns and
needs of all land users.

Decision making and accountability – Risk-based approach in the assessment of land use
capability, including the benefits and consequences. Clear accountability and governance around
the decision-making process.

Efficient processes – Streamlined, transparent and consistent approvals processes. Those who
are responsible for the planning, assessment and approvals processes are clearly identified.

Accessible relevant information – Easy access to accurate information regarding land
capability, and examples of multiple and sequential land uses.
4.3 Components
Enabling multiple and sequential land use requires a range of tools and methods to be applied at a
regional level, geographical features, economic and social context and current land uses.
The MLUF contains nine components (see Box C) that are adaptive (leadership, partnerships,
planning, engagement, education and applied learning) and technically orientated (assessment and
approvals processes underpinned by sound scientific and engineering guidance and practice).
Box C – Multiple Land Use Framework Components

Leadership, facilitation and coordination – Strong leadership from government, industry and
the community is central to successful multiple/sequential land use outcomes. Articulate the
broad areas of responsibilities of government, industry and the community in terms of facilitating
and leading the required changes to optimise multiple and sequential land use.

Planning – Seek clarity regarding governments’ objectives and intentions. Describe the optimal
approach to enable regions to benefit from land use change.

Partnerships – Partnerships between industry and affected stakeholders play an important role
in achieving mutually beneficial multiple and sequential land use outcomes. Identify what needs
to be done in order for regional communities to be prepared for land use changes. Extensive
stakeholder consultation assists decision making and avoids inappropriate development and/or
exclusion of land from other potential uses.

Engagement – Early engagement to enable stakeholders to clearly understand any proposed
land use activity. Progress a tripartite approach, with government, industry and community
working, to resolving policy, planning and investment conflict. Guidance as to how to engage with
key stakeholders with an interest or involvement in land access and usage issues.

Information – Education and adoption of evidence-based approaches is an important feature of
successful multiple land use planning approaches. Inform the broader community, industry and
media about the importance of land access and land use to the future viability of all industries
and the ongoing sustainability of regions. Inform media and industry about what governments
are doing to protect the public interest with respect to regulating industry and protecting social
and environmental values.
The Multiple Land Use Framework
29

Assessments and approvals – Project approvals are streamlined through applying risk-based
approaches that are based on best available science, evidence and sustainable development
principles. Transparent and consistent approvals processes which account for multiple and
sequential land use, and identify related issues such as water, heritage and cultural values.

Monitoring and compliance – Improvement in the transparency and understanding of how
government ensures industry compliance with conditions/regulations set to protect the public
interest. Increased confidence in the regulator through spend and efficiency in enforcement.

Continuous improvement – Drawing on past experiences in decision making will improve
multiple and sequential land use outcomes. Outline the necessary coordination of investment
and the resulting outputs of the investment in the areas of activity, to better understand the
cumulative effects of land use change and development across economic, environmental and
social dimensions.

Sharing and collaboration – Collaboration between organisations such as government or
industry bodies can support sharing of data and information, and assure of its quality, accuracy
and correct application. Provide mechanisms and opportunities for government, industry and
community to share land related information to identify potential issues and opportunities for
multiple and sequential land use outcomes.
Roles and responsibilities
The MLUF does not propose any significant change in existing accountabilities, roles and
responsibilities of the different State and Territory government agencies. It does not seek to impose
any significant additional responsibilities onto resource companies. Rather the MLUF seeks to ensure
the different participants in land access and land use planning, decision making and evaluation more
consistently performing their expected roles.
Interdependencies between components and their respective methods and tools
There are a number of critical interdependencies that exist across the MLUF. Understanding these
critical dependencies will help with its effective deployment. Figure 3 provides an overall illustration of
the MLUF including key dependencies. For example:

Clear Commonwealth, state and territory government policy and investment priorities
regarding regional growth will influence land/resource capability analysis and strategic
regional growth planning. In the absence of clear Commonwealth, state and territory
government priorities the effectiveness of land/resource capability analysis and strategic
regional growth planning is hampered.

Strategic regional growth planning and clear interfaces with the statutory planning systems
provide the “context” for community level partnerships. These two components provide the
parameters in terms of what outcomes communities are seeking and how land can be used in
the area to achieve those outcomes working side by side with industry and governments.

All MLUF components will be more effective and efficient if government is involved early in
coordination to facilitate bringing key stakeholders together to find workable and practical
solutions.

The achievement of multiple and sequential land use outcomes is heavily influenced by
whether there exists strong community and industry leadership especially in regards to
community debates about the legitimacy of resource development projects. Similarly effective
intra and inter government co‐ordination is necessary to drive outcomes around engagement,
education and assessments, approvals and co‐ordination.

The messages used in engagement and education flow from having clear Commonwealth,
state and territory government directions, strong regional planning, comprehensive
land/resource capability analysis, effective community and industry leadership and co‐
ordination across different spheres of government.
The Multiple Land Use Framework
30

Underpinning the MLUF are the components regarding applied learning and sharing and
collaboration. These components and their methods and tools provide the data, information
and knowledge base to inform decisions needing to be taken in the areas of assessments and
approvals as well as shaping messages/information products used in consultation, education
and engagement.
The Multiple Land Use Framework
31
Figure 3: Multiple Land Use Framework
The Multiple Land Use Framework
32
Based upon the stakeholder consultation and research undertaken, the MLUF has been developed as
a fit‐for‐purpose, values driven and authentic response to achieving multiple and sequential land use
outcomes. The research undertaken demonstrates the conditions required to achieve multiple and
sequential land use outcomes. Table 3 outlines how multiple and sequential land use outcomes can
be achieves through application of the MLUF principles.
Table 2: Achievement of MLUF desired outcomes
Desired Outcome
Shared commitment by
government, industry
and the community to
multiple and sequential
land use
Better informed public
discourse
Merit based land use
decisions
How MLUF seek to achieve outcome

Clear expectations of the behaviours (motivations) of key
stakeholders will be set ‐ The minerals and petroleum sectors and
other land use sectors will be able to demonstrate to each other a
shared commitment to maximising the social, economic,
environmental, and heritage value of land/marine environments.

The legitimacy of the land use and access planning and decision
making processes will be strengthened ‐ The behaviours of key
stakeholders involved in land use and access planning and decision
making should be consistent with the principles, thereby making the
land use outcomes less contestable and contentious.

Guide and encourage minerals and petroleum sectors to avoid using
“the language of entitlement” when interacting with other land users.

Strengthen community confidence by making it easier for public to
discover authoritative information on when a breach of land access
and use regulations has occurred and how those responsible have
been held accountable (monitoring and reporting MLUF component).

Strengthen stakeholder confidence by clearly demonstrating
responsiveness to the concerns other land uses, land use regulators
and community through greater visibility of the research and
development activities and investments (applied learning MLUF
component).

Make it considerably easier to discover and understand information
about the type of coexistence benefits that can be realised by
landholders and the minerals and petroleum sector (education MLUF
component).

Make greater use of organisations and individuals who are deemed to
be credible to develop and deliver education material to landholders,
communities and other land users (education MLUF component).

Effectively using strategic assessments to initially screen potentially
contentious resource development projects in a timely manner so as
to provide certainty to resource development firms and communities
regarding how project level approval should proceed (assessments,
approvals and consultation MLUF component – approvals).

Earlier and comprehensive understanding of the region’s existing
economic, social and environmental capacity to co‐exist with resource
development (and other development projects) and what would be
needed to build the required capacity (assessments, approvals and
consultation MLUF component – strategic cumulative impact
assessments).

Clearly setting out what a minimal level of research, analysis and
consultation should be undertaken prior to any decision to
permanently excluding any other land use (assessments, approvals
and consultation MLUF component – consultation).
The Multiple Land Use Framework
33
Deliver acceptable
outcomes for affected
communities and
landholders

Clarifying regulatory requirements across jurisdictions regarding mine
closure and using the different components of the MLUF to effectively
plan and prepare for mine closure (assessments, approvals and
consultation MLUF component).

Providing clearer guidance for local councils regarding when they
should consult with minerals and petroleum regulators on
development applications and the conditions they are considering
imposing for different land use zones (leadership, facilitation and
coordination MLUF component).

Better prepare potentially affected landholders and communities
through regional strategic planning that considers the likely impacts
and effects of resource development on the region and how resource
development can occur in a manner consistent with community
values and expectations (planning MLUF component).

Better enable affected communities and landholders and resource
companies to identify mutually beneficial outcomes based upon a
clear set of regional/community economic, social and environmental
values and needs (partnership MLUF component).

Work with landowners (either directly or via credible intermediaries) to
help them better understand their property rights with regards to
resource development activity. This must occur prior to the
landholders being required to negotiate land access agreements
(engagement MLUF component).

Streamline approval processes which involve different statutory
authorities where the resource development firm and affected
landholders can demonstrate that they are supportive of
arrangements to mutually benefit from water, waste recycling, etc.
sharing arrangements (leadership, facilitation and co‐ordination
MLUF component).
The other significant advantages of the MLUF include:
1. Does not require major change to existing roles and responsibilities ‐ It seeks to hold all the
different actors to greater account in terms of consistently performing their roles.
2. Seeks to gain greater value for money from existing investment in land access and use
methods and tools – The MLUF will bring together under a single framework existing
methods, approaches and tools being used disparately and intermittently across different
jurisdictions, land uses and agencies.
3. Ability to adapt and customise the MLUF components – The MLUF principles are universal,
however the application of the MLUF components will be based upon the specific challenges,
issues and opportunities facing each LAWG member and the resource development projects
planned or occurring in their jurisdiction (see case studies at Appendix B).
The Multiple Land Use Framework
34
Appendix A – Stakeholders Consulted
The stakeholders closely consulted included:

Australian Petroleum Production and Exploration Association

National Farmers Federation

Minerals Council of Australia

Australian Pipeline Industry Association

Australian Conservation Foundation

Public Health Association of Australia

Australian Local Government Association

Department of Sustainability, Environment, Water, Population and Communities
(Commonwealth)

Department of Agriculture, Forestry and Fisheries (Commonwealth)

Department of Climate Change and Energy Efficiency (Commonwealth)

Department of Regional Development and Local Government (Commonwealth)

Department of Finance and Deregulation (Commonwealth)

Department of Defence (Commonwealth)

Department of Resources, Energy and Tourism (Commonwealth)

Victorian and Queensland Departments of Planning

Victorian, Queensland and Western Australian Departments of Premier and Cabinet

All Land Access Working Group members
The Multiple Land Use Framework
35
Appendix B – Case Studies
Community Forest Programme, United Kingdom
The Community Forest programme (CFP) was established in 1990 as a pilot project to deliver a
comprehensive package of urban, economic and social regeneration capable of combining several
socioeconomic functions in the same area.
Since the late 1980s, the concepts and practices related to multi-purpose forestry, reclaimed ex
mining uses, and multifunctional agriculture have increasingly gained acceptance. In 1990 the
Government published its Environment White Paper ‘This Common Inheritance’ that introduced the
concept of sustainable development in England and Wales. This policy emerged in the wake of the
1987 Brundtland Report, which first drew the concept of sustainable development to mainstream
audiences. In 1999 the Government published its first Sustainable Development Strategy. The revised
strategy, ‘Securing the Future’, published in 2005 identifies four priorities: sustainable consumption
and production, climate change, natural resource protection and sustainable communities. This policy
context provided an ideal setting for the evolution of the concept of community forestry embodied in
the CFP. As a result, the CFP quickly established itself as a model to test how different functions in
problematic fringe locations may share space, why they may function badly, and how they might
function better.
Emscher Park Ruhr District, Germany
Emscher Park is located near the Emscher River in the German Ruhr district and covers an area of
approximately 800 square kilometers. For more than a century the area has been one of Europe’s
largest industrial districts with mining operations and heavy industry. In the 1990s, faced with a legacy
of contaminated land and a redundant workforce, the area commenced a long process of
transformation in which the old industrial architecture is preserved and plays a decisive part in a
framework for new multiple land uses. The IBA Emscher Park projects range from re‐naturalization of
watercourses to building new housing, business parks and research centres. The Emscher park is
often portrayed as a leading practice model for sustainable development and as an example of civic
participation in regional planning.
Regional strategic environmental assessment framework for Canada, Canadian Council of
Ministers of the Environment
Regional strategic environmental assessment framework for Canada (R‐SEA) seeks to incorporate
environmental considerations into the development of public policies and strategic decisions. In doing
so, R‐SEA can support the preparation of a preferred regional development strategy and
environmental management framework, and inform subsequent project‐based environmental
assessment and decision processes. Its main aim is to strengthen accountability and provide greater
public confidence that federal government decisions are being made in full awareness of the potential
environmental impact. The rationale for developing R‐SEA was to provide a methodology capable of
integrating environmental assessments in support of strategic planning and decision‐making in a
regional context.
Land Administration Assessment Framework
The Land Governance Assessment Framework (LGAF) is a framework aimed at monitoring land
governance at the country level. It provides a diagnostic tool that covers five main areas for policy
intervention: legal and institutional framework; land use planning, management and taxation;
management of public land; public provision of land information; and dispute resolution and conflict
management. Within each thematic area, a series of indicators has been developed with a subset of
dimensions that establish a specific line of enquiry for investigation, quantitative measurement or
qualitative assessment. LGAF was developed in order to provide governments with an objective
assessment tool that they can use to identify areas for improvement.
This case study will provide a brief description of key features of the LGAF and will report on initial
experience in one of the four countries where this approach was piloted. The pilot countries were
Peru, Ethiopia, Kyrgyzstan and Tanzania
The Multiple Land Use Framework
36
Carbon de Cerrejon, La Guajira Colombia
Established since the mid 1970’s, this major coal mining project in La Guajira, the most northerly
department of Colombia South America, represents a good example of mineral extraction in a wellpopulated area of traditional agriculture and indigenous as well as immigrant communities. Unlike
many such projects in Latin America, Cerrejon’s statutory consent processes have all been negotiated
with national and local authorities within the modern legislative era. Spatial planning, an awareness of
the longer term interests of communities, and prioritising of environmental interests are all enshrined
to a greater or lesser extent in policy statements at Departmental Development Plan level and within
the mining company’s own statements of the social and physical context within which it operates.
Regional Forestry Agreements
Regional Forest Agreements (RFAs) were developed between the Australia government and those of
New South Wales, Victoria, Tasmania and Western Australia. RFAs were developed for these
regions:
 New South Wales – Eden, North East, Southern NSW
 Victoria – East Gippsland, Central Highlands, North East, Gippsland, West
 Western Australia – South West forest region
 Tasmania – State‐wide
 Preparatory work for an RFA for south‐east Queensland were commenced by not concluded
The RFA process commenced with the agreement by Australian, State and Territory Governments to
the National Forest Policy Statement in 1992. Background work to the RFAs, including
Comprehensive Regional Assessments, commenced soon after. RFAs were progressively negotiated
between 1997 and 2001.
Western Growth Corridor of Melbourne
The Western Growth Corridor of Melbourne encompasses the Wyndham and Melton Growth Areas.
The focus of this case study is the Wyndham Growth Area due to the presence of extractive industry
in the western end of the growth corridor.
The City of Wyndham is the fastest growing municipality in Victoria and one of the fastest growing in
Australia. According to the Australian Bureau of Statistics, Wyndham had a population of 168,552 in
2011, adding 12,230 residents during 2010/11. This represents an annual growth rate of 7.8 per cent
p.a. Projections to June 2012 suggest an annual growth rate of seven per cent in the City, reaching a
population of 184,191 by June 2012.
The Growth Areas Authority (GAA) has prepared a Draft West Growth Corridor Plan which sets out a
comprehensive vision for the future evolution of the Wyndham and Melton growth areas. The Growth
Corridor Plan contains a hierarchy of activity centres, existing and new residential areas, protection of
biodiversity values, new infrastructure corridors and open space. The Wyndham growth corridor
contains two quarries. One quarry is operated by Boral (Ravenhall), the other operated by Holcim
(Werribee). Both quarries are used for rock extraction and are located adjacent or in close proximity to
existing and/or proposed new residential areas.
In addition to urban uses, the corridor contains and interfaces with several key environmental assets
including RAMSAR sites, the Cheetham Wetlands, marine environments, areas containing potentially
endangered species and a large area of native grasslands. The Draft West Growth Corridor Plan also
addresses buffer issues to extractive industries to ensure that these activities can still occur in an
environment undergoing rapid urban expansion.
Underground coal mine, Margaret River
LD Operations Pty Ltd proposed to construct and operate an underground coal mine 15km east
northeast of the Margaret River Township in south‐west Western Australia. The proposal comprised
three main components: mine site, coal handling and preparation plant and transport route.
The Multiple Land Use Framework
37
The surface mine infrastructure and entrance to the underground would be located on an approximate
80 hectare (ha) parcel of land owned by the proponent, which is largely cleared agricultural land
currently used for cattle grazing plus one dwelling. The proposed mine site area abuts the North‐East
Margaret River and Blackwood State Forests immediately to the north. Rezoning of the land was
identified as potentially being required to allow development of the mine.
The proposed mine site would have a surface footprint of up to 40ha, with an extensive underground
network of tunnels totalling 1,200ha. The underground mine would be 160 – 500 metres (m) below the
ground surface, some of which underlies the North‐East Margaret River and Blackwood State
Forests, as well as the Margaret River (including two of its permanent pools). The proposed
underground mining area would be located within the Sue aquifer, which is overlain by the Leederville
aquifer.
The proposed mine site area would be located within the Proclaimed, Busselton‐Capel Groundwater
Area, Cowaramup Groundwater Subarea as well as the Proclaimed Margaret River Public Drinking
Water Supply Area, Priority 3 Surface Water area. Some of the underground mine would be below the
Priority 1 Surface Water area, which is part of the catchment for the Ten Mile Brook Dam. The
Ten Mile Brook Dam is utilised for the Margaret River and Cowaramup town water supplies.
Kalgoorlie‐Boulder, Western Australia, Kalgoorlie Consolidated Gold Mines
During the 1980s open pit and underground mines were operating within the Golden Mile mining area
that is located adjacent to the City of Kalgoorlie‐Boulder. Technological advances in mining made it
possible to extract gold from lower grade ore. As a result Kalgoorlie Consolidated Gold Mines
(KCGM) planned to expand its operations, consuming its existing open cut operations into a single
‘Super pit’ that would then grow to take in parts of the Kalgoorlie‐Boulder (predominantly Boulder)
township. As well as this, there were plans to re‐process existing tailings and waste dumps that
contained large volumes of material containing low gold grades.
In 1987, the Environmental Protection Authority (EPA) recommended that an integrated plan be
developed for the region that recognised the role of mining in the region, the need to coordinate
mining activities and the potential for significant environmental and social impacts on the township. In
response, the WA Government established the Golden Mile Development Planning Committee group
to oversee mining in the area in the same year. The EPA produced the Kalgoorlie Environmental
Protection Policy in 1987. The policy was focused on noise and air quality (particularly sulphur dioxide
emissions) arising from mining activities around Kalgoorlie‐Boulder.
In 1989 a ‘Conceptual Plan for Mining Developments on the Golden Mile’ was produced by the
Golden Mile Mining Planning Committee. The conceptual plan provided a framework for future mining
developments to be viewed in the context of the overall social and environmental protection of the
region. The conceptual plan established a clear separation between mining and residential areas (as
conflicting land uses) and other mining‐related areas such as waste and tailings dumps. When
combined with new town development plans, the new Environmental Protection Policy and conceptual
plan for mining, an integrated plan for the region was formed.
Darling Range, Western Australia, Alcoa of Australia Limited
This case study explores mining in high conservation forests and water catchments close to a
metropolitan centre with excellent community interactions and corporate citizenship. Strip mining is
used to remove the bauxite resource, which involves clearing of the overlying vegetation, mining the
bauxite resource and then rehabilitating the site. Mining takes place predominantly within Jarrah
forests south of Perth; however, comes within close proximity of local townships and private
properties.
Exploration of the Jarrah forests began in 1957. In 1961, the first mining lease was granted and
mining began in 1963. Since that time, Alcoa has continuously, cleared, mined and rehabilitated
portions of the Jarrah forest. Alcoa has received national and international recognition for its
continuing rehabilitation work and demonstrating successful land management practices.
The Multiple Land Use Framework
38
Alcoa’s operations are overseen by the Mining and Management Program Liaison Group, chaired by
the Department of Industry and Resources, on behalf of the Minister for State Development, with
representatives from the Department of Environment and Conservation and the Department of Water.
Surat Basin, QLD
Queensland’s Surat Basin region comprises some 110,000 km 2 of land within the Toowoomba,
Maranoa and Western Downs local government areas with a total estimated population in 2011 of
almost 210,000. It is among the richest agricultural regions in Australia and holds vast reserves of
thermal coal and natural gas from coal seams.
The mining and energy sectors provide unprecedented economic development opportunities for the
Surat Basin region and its communities. However, it is also posing significant challenges for the
region’s infrastructure and services and the management of land and water resources and natural
environments. In recognition of these challenges, the Queensland government, local governments,
communities and industry have prepared the Surat Basin Future Directions Statement to cast the
vision for the region and provide a framework of principles and policies to sustain and manage the
region’s anticipated growth.
Jacinth‐Ambrosia Project, SA
The Jacinth‐Ambrosia Project has been developed by Iluka Resources Limited, who is proposing to
conduct a mineral sands mining operation within two Regional Reserve conservation areas. The
project involves the establishment of a mineral sands mining operation in the Eucala Basin,
approximately 200 km north‐west of Ceduna in South Australia (Iluka 2008).
Upper Hunter Valley Land Use Plan, NSW
The upper Hunter Valley region is situated in rural NSW approximately 200 km north‐east of Sydney
The changing concentration of land use and increasing amount of coal and natural gas from coal
seams projects in the Upper Hunter has caused concern amongst various stakeholders. In March
2012, the NSW government released a draft Upper Hunter Valley land use plan to address this
regional land use conflict.
High Speed Rail, East Coast, Australia
The Commonwealth Department of Infrastructure and Transportation completed a feasibility study into
the potential introduction of high speed rail (HSR) to connect Brisbane, Sydney, Canberra and
Melbourne in April 2013. Intermediate stations are being considered in regional centres, such as the
Gold Coast, Newcastle, Wollongong and Shepparton.
The operational characteristics of HSR require railway corridors to be relatively straight and flat to
allow the trains to reach maximum speeds of 350 kilometres per hour (kph). In addition, corridors
must be designated, preserved and eventually acquired, in many cases years in advance of need,
with little scope for changes in alignment once the HSR network has been established. Finally, interim
management of the HSR corridor must be carefully considered and implemented to avoid the
introduction of uses within or close to the corridor that would prevent, delay or impose unnecessary
costs on the HSR when it is constructed.
As of September 2013, there was no arrangement between the Commonwealth, the affected states
and the ACT for implementing an infrastructure project on the scale and scope envisaged for HSR.
New agreements and legislation would be required between the various levels of government
addressing environmental assessment procedures, regional and strategic land use planning, corridor
acquisition and preservation, and funding arrangements. Since the corridor eventually selected will
affect existing and potential mining leases, consideration must also be given to how the affected
resources can be developed without adding to the cost or affecting the timing of the HSR network
construction.
The Multiple Land Use Framework
39
Woomera Protected Area
The Woomera Prohibited Area (WPA) is a weapons testing range used by the Australian Defence
Force. Declared a prohibited area under the Defence Force Regulations 1952, the area’s remoteness,
large area of 127,000 km2, and relatively low levels of use by other people allow Defence (and our
allies) to use the area to test long‐range weapons systems and to conduct classified test activities.
The WPA is an important Defence test and evaluation capability.
There are tight controls on access for non‐Defence purposes, allowing for the testing to be conducted
in safety and within prescribed security protocols. As a declared prohibited area, access to the WPA
for non‐Defence use requires Commonwealth approval and is based on the proviso that Defence
activities would not be unduly compromised.
Mining activities also occur in the WPA. In addition to the current mining activities, the South
Australian Government have identified a potential of $35 billion worth of mining developments in the
area in iron ore, gold and uranium projects. While security and economic interests feature as the
primary land uses in the WPA, other uses include pastoralism, use by Aboriginal native title claim
groups, and conservation values.
Mindarie Mineral Sands Project, SA
The Mindarie Mineral Sands Project is located approximately 150 km east of Adelaide in Murray
Mallee region of South Australia. The proponent of the project is Murray Zircon Pty Ltd. (MZ). This
case study presents an example of a mining operation taking place in an agricultural landscape, with
the intention of rehabilitating the mined area back to agricultural land use after mine closure. The
predominant land use of this area is dry land agriculture, mostly as cropping and grazing. Wheat and
barley are the main crops with smaller areas of rye, oats, and lupins.
Most of the native mallee vegetation of the area has been cleared during the mid-1900s for
agriculture. Occasional areas of remnant, degraded or regrowth vegetation and low density scattered
trees exist in paddocks and alongside the roads. The original site establishment and construction
activities for the Mindarie Sands Project were undertaken by the company Australian Zircon. This
original mining activity ceased in 2009 when Australian Zircon went into voluntary administration. The
mineral sands mine has been under care and maintenance since this closure.
In 2011 the project was purchased by Murray Zircon and who embarked on extensive engagement
and consultation with the community in the process of reapplying for operational approval. This also
included the undertaking of the outstanding rehabilitation which was left uncompleted when the
previous operator went into administration. In April 2012 Murray Zircon gained approval from the
DMITRE to re‐open the mineral sands mining operation on the site. The Mindarie Mineral Sands
project will involve the mining of eight mineral sands strandlines located in nine separate Mineral
Leases and two Exploration Licences.
The Multiple Land Use Framework
40
Reference List
Adams, V & Moon, K, Security and equity of conservation covenants: contradiction of private
protected are polices in Australia, Land Use Policy 30,2013, pp. 114‐119
AEC Group, Surat Basin economic development strategy: Part A Regional background and research
framework. Final report to the Department of Employment, Economic Development and Innovation,
Queensland, 2011
African Development Bank and Economic Commission for Africa, Monitoring and evaluation system
(M & E) for land policy formulation and implementation in Africa,, African Development Bank and
Economic Commission for Africa, Johannesburg, 2011.
Murray Zircon 2010 ‐ http://www.murrayzircon.com.au/index.php/projects‐2/mindarie‐project/ ‐
accessed 8/5/12
Agriculture and Resource Management Council of Australia and New Zealand and Australian and
New Zealand Environment and Conservation Council, National water quality management strategy.
Policies and principles: a reference document, 1994.
http://www.environment.gov.au/water/publications/quality/nwqmspolicies‐principles.html
Alcoa n.d. Bauxite mining rehabilitation. Available at:
http://www.alcoa.com/australia/en/info_page/land_management_bau_mine_rehab.asp
Anonymous n.d. Save Liverpool Plains. http://www.saveliverpoolplains.com/index.php/about/
Antakirinja Matu‐Yankunytjatjara Aboriginal Corporation, Submission for the Australian Government
Review of the Woomera Prohibited Area, 2010 Available at:
http://www.defence.gov.au/woomera/review/submissions/AMYAC.pdf ‐ accessed 7 May 2010
Association of Greater Manchester Authorities , Application for Local Nature Partnership Fund,
second revision, Association of Greater Manchester Authorities, Manchester,Oct. 2011
Australian Bureau of Agricultural and Resource Economics and Sciences. Australian forest and wood
products statistics, September and December quarters 2010, Canberra,2012.
Australian Bureau of Statistics 2012, Population clock. Available at:
http://www.abs.gov.au/websitedbs/D3310114.nsf/home/home?opendocument#from‐banner=GT
Australian Bureau of Statistics 2012, 3218.0 - Regional Population Growth, Australia, 2011. Available
at:
http://www.abs.gov.au/AUSSTATS/abs@.nsf/Lookup/3218.0Main+Features12011?OpenDocument.
Australian Bureau of Statistics 2011, 75010DO001_201011 Value of Principal Agricultural
Commodities Produced, Australia, Preliminary, 2010–11. www.abs.gov.au
Australian Bureau of Statistics 2011, 71110DO001_201011 Principal Agricultural Commodities,
Australia, Preliminary, 2010‐11. www.abs.gov.au
Australian Bureau of Statistics 2011, 4610.0.55.008 ‐ Gross Value of Irrigated Agricultural Production,
2000‐01 to 2009‐10. www.abs.gov.au
Australian Bureau of Statistics 2011, Australian farming in brief. 2011. www.abs.gov.au
The Multiple Land Use Framework
41
Australian Bureau of Statistics, 2011,Our Cities – The challenge of change, 2010 background and
research paper. The Australian Government (p.45)
Australian Bureau of Statistics 2010, 1301.0 ‐ Year Book Australia, 2009–10. www.abs.gov.au
Australian Bureau of Statistics, 2009: ABS Water account 2008‐09, ABS Catalogue No. 4610.0
Australian Bureau of Statistics 2008, 3105.0.65.001 Australian Historical Population Statistics, 2008.
www.abs.gov.au
Australian Bureau of Statistics 2006,7104.0.55.001 ‐ Agriculture in Focus: Farming Families,
Australia, 2006. www.abs.gov.au
Australian and New Zealand Environment and Conservation Council Agriculture and Resource
Management Council of Australia and New Zealand, National Water Quality Management Strategy:
Guidelines for Groundwater Protection in Australia, 1995. Available at
http://www.environment.gov.au/water/publications/quality/nwqms‐groundwater‐guidelines.html
Accessed on 24 April 2012.
Australian Department of Agriculture, Plantations for Australia: The 2020 vision, Canberra, Canberra
http://www.plantations2020.com.au/assets/acrobat/2020vision.pdf
Australian Department of Resources, Tourism and Energy, The Jackson Report, Informing the
National long‐term Tourism Strategy, Canberra, 2009
http://www.ret.gov.au/tourism/documents/tmc/jackson-report-july09.pdf
Australian Government response to the report of the independent review of the EPBC Act
Commonwealth of Australia 2011, http://www.environment.gov.au/system/files/resources/605a54df7b33-4426-a5a8-51de24b29c71/files/epbc-review-govt-response.pdf
Australian Government n.d., National Tourism Planning Guide: A best practice approach
http://www.ret.gov.au/tourism/Documents/tmc/NationalTourismPlanningGuide_a_best_practice_appro
ach.pdf
Australian Government, Tourism Industry Facts & Figures at a Glance Tourism Research Australia,
May 2011
Australian Government, Mining Interests in the Woomera Prohibited Area. Government Statement,
2010 Available at: http://www.defence.gov.au/woomera/review.htm accessed 8/5/12
Australian Government,Australian Indigenous cultural heritage, 2008 accessed at
http://australia.gov.au/about‐australia/australian‐story/austn‐indigenous‐cultural‐heritage on
13/4/2012.
Australian Government,. National Forest Policy Statement. A new focus for Australia’s forests.
Secondedition, 1995, http://www.daff.gov.au/rfa/publications/nfp‐statement
Australian Government, Department of Agriculture, Comprehensive regional assessment, Chapter 3 Multiple use forest management, 1998 Available at:
http://www.daff.gov.au/__data/assets/pdf_file/0009/49671/wa_sw_chap3.pdf
The Multiple Land Use Framework
42
Australian Government and Victorian Government, The Central Highlands Regional Forest
Agreement, 1998 http://www.daff.gov.au/rfa/regions/vic‐centralhighlands
International Council on Monuments and Sites (ICOMOS), The Burra Charter: The Australia ICOMOS
charter for places of cultural significance, Melbourne, 1999
Australian State of the Environment Committee, State of the Environment 2011, Department of
Sustainability, Environment, Water, Population and Communities, 2011
Australian Government Department of the Environment, Australian Government response to the
report of the independent review of the EPBC Act Commonwealth of Australia, Canberra, 2011
Australian Senate Select Committee on Agricultural and Related Industries 2009. Food production in
Australia. Second interim report, Canberra, 2009
http://www.aph.gov.au/Parliamentary_Business/Committees/Senate_Committees?url=agric_ctte/food
_production/interim_report_2/index.htm
Barr N ,House on the hill. MacMillan, 2009
Benyon RG, Theiveyanathan S and Doody TM, Impacts of tree plantations on groundwater in southeastern Australia. Australian Journal of Botany, 54, 2006, pp. 181–192
Beynon, H., Cox, A., Hudson, R., Digging Up Trouble: The Environment Protest and Opencast
Mining. Rivers Oram Press, 2000, London.
The Global Environmental Facility & United Nations Development Programme (UNDP), Best practices
in sustainable land management (SLM) theme on sustainable agriculture: Cambodia, 2011
http://www.un.org.kh/undp/media/files/Best%20Practices%20in%20Sustatainable%20Land%20Mana
gement%20(Theme%20on%20Sustainable%20Agriculture).pdf
Billa Kalina Station, South Australia,, Submission, 2010 Available at:
http://www.defence.gov.au/woomera/review/submissions/BillaKilinaStation.pdf ‐ accessed 7 May
2012.
Brooks University, Planning for delivery of quality of life benefits – an evaluation of planning
mechanisms for delivery of quality of life benefits with reference to Community Forests,
Countryside Agency, Cheltenham, 2002
Bureau of Rural Sciences, Australia’s plantations. 2010 Inventory update, 2010
Bureau of Rural Sciences, Land use in Australia – at a glance, Australian Collaborative Land Use
Mapping Program, 2002 www.brs.gov.au/landuse
Burns, T., Deininger, K., Selod, H., Dalrymple, K., Implementing the Land Governance
Assessment Framework, ,, Facing the Challenges ‐ Building the
Capacity, International Federation of Surveyors Congress, Sydney, Australia, 11‐16 April 2010
Bush Heritage Australia, (2010). Bon Bon Station Reserve, South Australia, Submission, Hawke
Review of the Woomera Prohibited Area, 3 August 2010 Available at:
http://www.defence.gov.au/woomera/review.htm ‐ accessed 8/5/12
Calvert, A., () Community Forestry Scotland, A Report for Forest Research, Surrey, 2009
Canadian Environmental Assessment Agency, Strategic Environmental Assessment Workshop 2004,
Canadian Environmental Assessment Agency, Ottawa, 2004
The Multiple Land Use Framework
43
Centre for Indigenous Environmental Resources, Meaningful Involvement of aboriginal peoples in
environmental assessment, final report, Canadian Environmental Assessment Agency, Ottawa, 2009
Christou, M.D., Struckl, M. and Biermann, T., Land Use Planning Guidelines, European Commission
Joint Research Centre: Institute for the Protection and Security of the Citizen Hazard Assessment
Unit,Ispra, 1996 http://ec.europa.eu/environment/seveso/pdf/landuseplanning_guidance_en.pdf
Chomsky, A, Coal Mines and Communities in Colombia: The Salem Connection, prepared for
presentation at Salem State College Graduate Research Day, April 27 2002;
Commonwealth of Australia, Seeing the forest through the trees, Canberra, 2011, pp. 5-15
Commonwealth of Australia, National Framework for Non‐urban Water Metering – Policy Paper, 7
December 2009. Available at:
http://www.environment.gov.au/water/publications/agriculture/pubs/nationalframework‐for‐non‐urban‐
water‐metering.pdf ‐ accessed 24 April 2012.
Commonwealth of Australia 2009,The Defence White Paper 2009 Available online at:
http://www.defence.gov.au/whitepaper/docs/defence_white_paper_2009.pdf ‐ accessed 10 May 2012.
Commonwealth of Australia, The Environment Protection and Biodiversity Conservation Act 1999.
Available at http://www.comlaw.gov.au/Series/C2004A00485 ‐ accessed 10 May 2012.
Commonwealth of Australia, The Defence Force Regulations 1952. Available:
http://www.comlaw.gov.au/Series/F1996B01695 ‐ accessed 11 May 2012.
Commonwealth of Australia, The Defence Act 1903 Available at:
http://www.austlii.edu.au/au/legis/cth/consol_act/da190356/ ‐ accessed 11 May 2012.
Commonwealth of Australia, Nature Conservation Act 1992
Confinas M and Creighton C., Australian native vegetation assessment 2001. National Land and
Water Resources Audit, 2001
Corrs Chambers Westgarth, ‘Investing in mining related infrastructure – what investors and
contractors should know’. www.corrs.com.au/thinking/insights/investing‐in‐mining‐related‐
infrastructure‐what‐investorscontractors‐should‐know/
Council of Australian Governments Meeting Communiqué, 13 April 2012,
http://www.coag.gov.au/coag_meeting_outcomes/2012‐04‐13/index.cfm
Council of Australian Governments,Intergovernmental Agreement on a National Water Initiative, 2004
Available at http://www.nwc.gov.au/__data/assets/pdf_file/0019/18208/Intergovernmental‐Agreement‐
on‐a‐national‐water‐initiative2.pdf Accessed on 24 April 2012
Daley J and Lancy A., Investing in regions: Making a difference, The Grattan Institute, May 2011
Danielzyk, R. and Wood, G., Innovation strategies of political regionalization: the case of North Rhine ‐
Westphalia, in European Planning Studies, 12(2), 2004, pp. 191–207.
Die Internationale Bauausstellung (1999) Die Internationale Bauausstellung web‐site. Viewed 30 April
2012, http://www.iba.nrw.de/main.htm
The Multiple Land Use Framework
44
Defence Force Regulations 1952 Available at:
http://www.austlii.edu.au/au/legis/cth/consol_reg/dfr1952207/ ‐ accessed 3/5/12.
Deininger, K., Land policies for growth and poverty reduction, Volume 1, World Bank:
Washington, 2003
Deininger, K., Land Governance Assessment Framework: Implementation Manual for
Assessing Governance in the Land Sector, World Bank, Washington, 2009
Deininger, K. Selod, H., and Burns, T., Using the land governance assessment framework
(LGAF): lessons and next steps, World Bank, 2012
Deininger, K., Selod, H., Burns, T., The Land Governance Assessment Framework: Identifying
and Monitoring Good Practice in the land sector, World Bank, 2012 Available at:
issuu.com/world.bank.publications/docs/9780821387580
Department of Defence,2012 ‐ http://www.defence.gov.au/woomera/review.htm ‐ accessed 7 May
2012
Department of Agriculture, Fisheries and Forestry, Regional Forest Agreements Home,2010
www.daff.gov.au/rfa
Department of Climate Change and Energy Efficiency The Carbon Farming Initiative handbook, 2012
http://www.climatechange.gov.au/en/government/initiatives/carbon‐farming‐initiative/handbook.aspx
Department of Climate Change and energy Efficiency 2009 Climate Change Risks to Australia’s
Coast, First Pass National Assessment, , Canberra, 2009,p. 6
Department of Defence, Defence Environmental Strategic Plan 2010 – 2014. Available at:
http://www.defence.gov.au/environment/strat_plan.pdf ‐ accessed 10 May 2012.
Department of Defence, Defence Heritage Strategy – From a Proud Past to a Better Future,.2010
Available at: http://www.defence.gov.au/environment/defenceheritagestrategy.pdf ‐ accessed 10 May
2012.
Department of Defence, Defence Heritage Register, 2012 Available online at:
http://www.defence.gov.au/environment/register.htm ‐ accessed 10 May 2012.
Department of Defence , Defence Environmental Strategic Partnerships 2010‐11, 2012 Available at:
http://www.defence.gov.au/environment/docs/Strategic%20partnerships%20v4.pdf – accessed 10
May 2012.
Department of Defence, Standing Offer Panels, 2012 Available at:
http://www.defence.gov.au/im/support/panels/panels.htm
Department of the Environment, Water, Heritage and the Arts, EPBC Act, List of Threatened
Ecological Communities,2013 [on-line] http://www.environment.gov.au/cgibin/sprat/public/publiclookupcommunities.pl
Department of the Environment, Water, Heritage and the Arts 2009, Assessment of Australia’s
Terrestrial Biodiversity 2008, Report prepared by the Biodiversity Assessment Working Group of the
National Land and Water Resources Audit for the Australian Government, Canberra.
Australian Government response to the report of the independent review of the EPBC Act
Commonwealth of Australia 2011
The Multiple Land Use Framework
45
Department of the Environment, Water, Heritage and the Arts, 2009 The Australian Environment Act:
Report of the Independent review of the Environment Protection and Biodiversity Conservation Act
1999 Final report www.environment.gov.au/epbc/review/publications/index.html
Department of Environment, Transport and the Regions (UK), Scenario Analysis of Community
Forestry in England 1993‐1997, HMSO, London,1998.
Department of Environment, Transport and the Regions (UK), A better quality of life: A strategy for
sustainable development for the United Kingdom, HMSO, London, 1999
Department of Industry Tourism and Resources, Biodiversity Management: Leading Practice
Sustainable Development Program for the Mining Industry, Government of Australia, Canberra, 2017
Accessed from http://www.ret.gov.au/resources/Documents/LPSDP/LPSDP-BiodiversityHandbook.pdf
Department of Infrastructure, State of Australian Cities, 2011, Ch: 3 Population and Settlement.
http://www.infrastructure.gov.au/infrastructure/mcu/soac_files/SOAC_Chapter_3.pdf
Department of Infrastructure and Transport, The State of Australian Cities 2011, Major Cities Unit,
Canberra, 2011
http://www.infrastructure.gov.au/infrastructure/mcu/soac/files/00_INFRA1267_MCU_SOAC_2011_FA
1.pdf
Department of Infrastructure and Transport, The State of Australian Cities, Major Cities Unit,
Canberra, 2011
Department of Infrastructure and Transport 2011 ‘Our Cities, Our Future ‐ A National Urban Policy for
a productive, sustainable and liveable future Infrastructure Australia.’
http://www.infrastructure.gov.au/infrastructure/mcu/files/Our_Cities_National_Urban_Policy_Paper_20
11.pdf
Department of Resources, Energy and Tourism, National Long‐Term Tourism Strategy, Canberra,
2009 http://www.ret.gov.au/tourism/Documents/tmc/DRET%20Tourism%20Strategy.pdf
Department of Sustainability, Environment, Water, Population and Communities, About Marine
Bioregional Planning, Canberra, 2012 http://www.environment.gov.au/coasts/mbp/about/index.html
Department of Sustainability, Environment, Water, Population and Communities, Environmental
Offsets Policy: Consultation Draft [on-line], Canberra, 2011
http://www.environment.gov.au/epbc/publications/pubs/consultation-draft-environmental-offsetspolicy.pdf
Department of Sustainability, Environment, Water, Population and Communities, Conservation
organisations Canberra: DSEWPaC, 2011 [on-line], Canberra, 2001
www.environment.gov.au/parks/nrs/gettinginvolved/organisations/index.html
Department of Sustainability, Environment, Water, Population and Communities, Threatened Species
and Ecological Communities in Australia [on-line], Canberra, 2011
http://www.environment.gov.au/biodiversity/threatened/publications/overview.html
Department of Sustainability, Environment, Water, Population and Communities, EPBC Act list of
threatened fauna. Canberra, 2011, www.environment.gov.au/cgibin/sprat/public/publicthreatenedlist.pl
The Multiple Land Use Framework
46
Departamento De La Guajira, Plan Departamental de Desarollo de la Guajira 2008 ‐ 2011, Bogata,
2008 (PDDG) http://cdim.esap.edu.co/BancoMedios/Documentos%20PDF/la%20guajira%20%20pd%20-%2008%20-%2011.pdf
Departamento Nacional de Planeación, Plan Nacional de Desarollo de Colombia 2010 – 2014,
Bogata, 2010 https://www.dnp.gov.co/pnd/pnd20102014.aspx
Driml, S, Robinson, J, Tkaczynski, A & Dwyer L 2010 Tourism Investment in Australia: A scoping
study, Sustainable Tourism Cooperative Research Centre, 2010
Dudley, N. (Ed.),. Guidelines for Applying Protected Area Management Categories. Gland,
Switzerland, 2008. http://data.iucn.org/dbtw-wpd/edocs/paps-016.pdf
Economic Development Agency of Canada for the Regions of Quebec, Sustainable Development
Strategy 2011‐2013, Ottawa, 2011
Deutsche Gesellschaft fur Technische Zusammenarbeit, Land Use Planning: Methods, Strategies
and Tools, Working Group, Universum Verlagsanstalt, Berlin,1999
D.G. Ockwell Monitoring and Evaluation Framework for REACT (Regeneration through
Environmental ACTion) for the COUNTRYSIDE AGENCY, Entec UK, 2003
European Commission Enterprise Directorate General, Mineral Planning Policies and Supply
Practices in Europe,, Brussels,2004.
Environment Defenders Office, Reforming Mining Law in Victoria, Melbourne, 2012
http://www.edovic.org.au/downloads/files/EDO_Reforming-Mining-Law-in-Victoria.pdf
Equator Principles, http://www.equator‐principles.com
Evans MC, Watson JEM, Fuller RA, Venter O, Bennett SC, Marsack PR, Possingham HP, “The
spatial distribution of threats to species in Australia”, BioScience 2011;61 (4), pp.281–9.
Extractive Industries Transparency Initiative (EITI), What is the EITI? , 2012 http://eiti.org/
Fermio, S and Hamstead, M,, “Integrating the mining sector into water planning and entitlements
regimes”, Waterlines report, National Water Commission, Canberra. 2012 Available at
http://nwc.gov.au/__data/assets/pdf_file/0005/21857/Integrating‐the‐mining‐sector.pdf
Finke, L. and Neumeyer, H., Die IBA Emscher Park—ein Beispiel fur eine nachhaltige
Regionalentwicklung? Informationen zur Raumentwicklung, 3/4, 1999, pp. 195 – 203.
Foran B, Lenzen M, Dey C., Balancing act: a triple bottom line account of the Australian economy,
Canberra: CSIRO Resource Futures & the University of Sydney, 2005, viewed 2 September 2011,
www.isa.org.usyd.edu.au/publications/balance.shtml
Forest Practices Authority, Information on land clearing controls in Tasmania, Hobart, 2011
http://www.fpa.tas.gov.au/__data/assets/pdf_file/0017/58121/Land_clearing_information_sheet.pdf
Forestry Commission, Regional Forestry Frameworks: Information for Stakeholders Assisting the
Preparation of Regional Frameworks for Implementing the England Forestry Strategy, Forestry
Commission, London, 2003
Foster, F., Koundouri, P., Tuinhof, A., Kemper, K., Nanni, M., and Garduño, H., Groundwater
Dependent Ecosystems the challenge of balanced assessment and adequate conservation, Briefing
Note Series. Note 15, World Bank, 2006
The Multiple Land Use Framework
47
Gachechiladze, M., Noble, B.F., and Bitter, B., Following‐up in strategic environmental assessment: a
case study of 20‐year forest management planning in Saskatchewan, Canada, Impact Assessment
and Project Appraisal, 27(1), 2009, pp. 45–56
Gallent, N., Andersson, J.,Bianconi, M., Planning on the edge: the context for planning at the rural
urban fringe, Routldge, London, 2006
Ganser, K., Architecture as a process: the IBA Emscher Park, in K. Wachten, K. (Ed.) Change
Without Growth: Sustainable Development for the 21st Century, Struve’s
Buchdruckerei und Verlag GmbH, Eutin, 1996
Garden J, McAlpine C, Peterson A, Jones D, Possingham H., Review of the ecology of Australian
urban fauna: a focus on spatially explicit processes, Austral Ecology;31 (2), 2006,, pp.:126–48.
GEF Strategic Investment Program for Sustainable Land Management in Sub ‐Saharan Africa (SIP):
Country SLM Investment Framework. Global Environmental Facility, Washington,), 2006.
Gemma García G, Feliú E, EsteveJ.F., Perez Soba, M, Hazeu G., Rasmussen R.O., GaleraLimdblom P. and Banski J, EU‐LUPA: European Land Use Patterns, European Union, Brussels, 2010
http://www.espon.eu/export/sites/default/Documents/Projects/AppliedResearch/EULUPA/Inception_report_EU-LUPA.pdf
Gerrand A, Keenan RJ, Kanowski P and Stanton R., Australian forest plantations: an overview of
industry, environmental and community issues and benefits. Australian Forestry 66, 2003, pp.1‐8.
Gibson N, Yates CJ, Dillon R., Plant communities of the ironstone ranges of south Western Australia:
hotspots for plant diversity and mineral deposits, Biodiversity and Conservation, 19 (14), 2010, p :39–
62.
Government of Queensland,. State Planning Policy 1/12: Protection of Queensland’s strategic
cropping land, Brisbane, 2012 http://www.derm.qld.gov.au/land/planning/strategic‐
cropping/legislation‐planning.html
Government of Queensland, Petroleum and Gas (Production and Safety) Act 2004
Government of South Australia,. Mineral exploration and mining activities within the Woomera
Prohibited Area, Adelaide, 2012 Available at:
https://sarigbasis.pir.sa.gov.au/WebtopEw/ws/samref/sarig1/image/DDD/ISM32.pdf;jsessionid=CD440
4C9191D4F27889D36E03A792DAE – accessed 3/5/12
Government of South Australia, A Review of Yellabinna Regional Reserve 2000 – 2010, Department
for Environment and Heritage: Adelaide, 2009.
Government of South Australia,: A Review of Nullabor Regional Reserve 1999 – 2009, Department
for Environment and Heritage, Adelaide, 2009.
Government of Tasmania, State policy on the protection of agricultural land, Hobart, 2009
http://www.dpac.tas.gov.au/__data/assets/pdf_file/0004/82714/State_Policy_on_the_Protection_of_A
gricultural_Land_2009.pdf
Gunn, H., Integrating Strategic Environmental Assessment and Cumulative Effects Assessment in
Canada, PhD. thesis Department of Geography and Planning University of Saskatchewan,
Saskatoon, Canada, 2009
Gunn, J., Strategic Environmental Assessment in Canada: A Key Link in Pursuing Sustainable
The Multiple Land Use Framework
48
Development, power point presentation Department of Geography and Planning & School of
Environment and Sustainability, University of Saskatchewan, 25 May, 2010
Harriman, J., Gunn, H., and Noble, B., A conceptual basis and methodological framework for regional
strategic environmental assessment (R‐SEA), Impact Assessment and Project Appraisal, 27(4), 2009,
pp 258 – 270
Hawke, A., Review of the Woomera Prohibited Area – Final Report, February 2011. Available at:
http://www.defence.gov.au/woomera/review.htm ‐ accessed 8/5/12
Hernandez, Deborah Pacini, Resource Development and Indigenous People: The El Cerrejon Project
in Guajira, Colombia, Cultural Survival Occasional Paper 15, December, 1984;
HM Government,) This Common Inheritance: Britain's Environmental Strategy, HMSO, London, 1990
HM Government, Securing the future – delivering UK sustainable development strategy, HMOS,
London, 2005
Howe, P.,, Framework for assessing potential local and cumulative effects of mining on groundwater –
project summary report, Waterlines report, National Water Commission, Canberra, 2011
Iluka Resources Limited, Technical Report – Jacinth‐Ambrosia Project: Extractive Mineral Leases
Mining and Rehabilitation Program, Revision B, 2008.
Iluka Resources Limited, Jacinth‐Ambrosia Mineral Sands Mining Project – Mining and Rehabilitation
Program (Operational) Part F: Operational Details, 2008 Available at:
http://www.iluka.com/docs/environmental-management-plans/marp(ops)_part-f_operationaldetails.pdf
International Council on Mining and Metals, Good Practice Guidance for Mining and Biodiversity,
(ICMM),London, 2006.
International Finance Corporation, IFC Sustainability Framework: Policy and Performance Standards
on environmental and Social Sustainability access to information Policy, IFC, Washington, 2012 and
International Fund for Agricultural Development, IFAD’s Environment and Natural Resource
Management Policy: Resilient livelihoods through the sustainable use of natural assets, IFAD, Rome,
2011
International Fund for Agricultural Development, Environment and Natural Resource Management
Policy – Resilient Livelihoods through the Sustainable Use of Natural Assets , IFAD, Rome, 2011
http://www.ifad.org/gbdocs/eb/102/e/EB-2011-102-R-9.pdf
International Fund for Agricultural Development, Environmental management and sustainable
development, Rome, 2009 IFAD’s Environmental and Social Assessment Procedures
http://www.ifad.org/gbdocs/eb/96/e/EB-2009-96-R-7.pdf
Juturna Consulting & Mount Isa to Townsville Economic Zone (MITEZ),‘MITEZ 50‐Year Freight
Infrastructure Plan: Final Report, May 2012
http://www.infrastructureaustralia.gov.au/publications/files/MITEZ_50_Year_Plan_2012.pdf
KCGM Pty Ltd Overview on-line, Available at: http://www.superpit.com.au/.
Kelton, G.,Easier access to Woomera Prohibited Area area closer, AdelaideNow, 4 May 2012.
Available at: http://www.adelaidenow.com.au/business/easier‐access‐to‐woomera‐prohibited‐area‐
areacloser/story‐e6frede3‐1226347162880. Accessed 7 May 2012.
The Multiple Land Use Framework
49
Kilper, H. and Wood, G.,) Restructuring policies: the Emscher Park International Building
Exhibition, in Cooke, P. (Ed.) The Rise of the Rustbelt, UCL Press, London, pp. 208 – 230.
Kitchen, L., Marsden, T. And Milbourne, P., Community forests and regeneration in postindustrial
landscapes, Geoforum, 37, 2006, pp. 831 – 843.
Knapp, W., Kunzmann, K., and & Schmitt, P. , A cooperative spatial future for RheinRuhr,
European Planning Studies, 12(3),2004, pp. 323 ‐ 349.
Koch, AJ, Chuter, A and Munks, SA , A review of forestry impacts on biodiversity and the
effectiveness of “off-reserve‟ management actions in areas covered by the Tasmanian forest
practices system, Report to the Independent Verification Group and the Forest Practices Authority, 20
January 2012. Forest Practices Authority Scientific Report.
Koch JM and Hobbs RJ.,Synthesis: is Alcoa successfully restoring a jarrah forest ecosystem after
bauxite mining in Western Australia? Restoration Ecology, 15, 2007; pp.137–44
Kokatha Uwankara Native Title Claim Group, Submission to the Australian Government Review of the
Woomera Prohibited Area From Kokatha Uwankara Native Title Claim Group Federal Court
Proceeding SAD 90 of 2009, 2010 Available at:
http://www.defence.gov.au/woomera/review/submissions/KokathaUwankaraClaimants.pdf ‐ accessed
7 May 2012.
Kwiatkowski, R E and Ooi, M, Integrated environmental impact assessment: a Canadian example,
Bulletin of the World Health Organization, 81(6), 2003, pp. 434–438
Kuczera G., Prediction of water yield reductions following a bushfire in ash‐mixed species eucalypt
forest, Journal of Hydrology, 94, 1987, pp. 215‐236.
Land Use Consultants and SQW Ltd., Evaluation of the Community Forest Programme Final Report,
Natural England, London, 2005
Lawrence, A., Anglezarke, B., Frost, B., Nolan, P. and Owen, R. , What Does Community
Forestry Mean in a Devolved Great Britain?, International Forestry Review, 11(2), 2009, pp.281 ‐297
Leary, J., Mining infrastructure – issues and opportunities for investors, Presentation for Bond
University, Freehills, 22 July 2011
Low Choy, D., Sutherland, C., Gleeson, B., Sipe, N., and Dodson, J. , Change and Continuity in Peri –
Urban Australia: Peri – Urban Futures & Sustainable Development. Monograph 4, Griffith University,
Brisbane, 2008 viewed 2 September 2011, http://periurban.org.au/references/monograph4.pdf
McDermott C, Cashore B, Kanowski P., Global environmental forest policies: an international
comparison, Earthscan Ltd, Oxford, 2010.
Macdonald, R., The IBA Emscher Park, Urban Design Quarterly, 56, October, 1995 Viewed 30 April,
2012, from http://www.udg.org.uk/
Minister of Public Works and Government Services Canada, Strategic Environmental Assessment,
The Cabinet Directive on the Environmental assessment of Policy, Plan and Program Proposals:
Guidelines for implementing the Cabinet Directive Privy Council Office and the Canadian,
Environmental Assessment Agency, Ottawa, 2010
European Commission, Modelling of EU land‐use choices and environmental impacts – scoping
study. European Commission, Environment Directorate-General - European Commission, Brussels,
2008.
The Multiple Land Use Framework
50
Montreal Process Implementation Group for Australia, Australia’s State of the Forests Report. Bureau
of Rural Sciences, Canberra, 2008
Murray‐Darling Basin Authority, Guide to the Murray‐Darling Basin Plan: overview, Canberra, 2010
www.mdba.gov.au
Murray‐Darling Basin Authority Proposed Basin Plan., Canberra, 2012
http://www.mdba.gov.au/sites/default/files/archived/altered-PBP/APBP-Proposed-Basin-Plan20120806.pdf
Murray‐Darling Basin Authority, Acid sulfate soils in the Murray–Darling Basin, Canberra, 2011
Available at http://www.mdba.gov.au/files/publications/Acid‐sulfate‐soils‐in‐the‐MDB.pdf
National Collaborating Centre for Healthy Public Policy, Four Types of impact Assessment used in
Canada: Comparative Table, prepared for Gouvernement du Québec, Québec, 2011
Natural Resource Charter, www.naturalresourcecharter.org. 2010
National Land and Water Resources Audit 2001, Australian dry land salinity assessment 2000.
Extent, impacts, processes, monitoring and management options. National Land and Water
Resources Audit, Canberra, 2001
National Native Title Tribunal, Native Title: An overview, 2009 accessed at
http://www.nntt.gov.au/Information‐about‐native‐title/Pages/Nativetitlerightsandinterests.aspx on
17/4/2012
National Native Title Tribunal, About Native Title: Resolution of native title issues over land and water,
2006 Accessed at http://www.nntt.gov.au/Information‐about‐native‐
title/Pages/Nativetitlerightsandinterests.aspx on 17/4/2012
Natural England, Green Infrastructure and the Urban Fringe: Learning lessons from the
Countryside In and Around Towns programme, Natural England, Sheffield, 2007
Natural Resource Management Ministerial Council, Environmental Protection and Heritage Council, &
National Health and Medical Research CouncilAustralian Guidelines for Water Recycling, Managing
Health and Environmental Risks (Phase 2) – Managed Aquifer Recharge. National Water Quality
Management Strategy, 2009 Available at: http://www.ephc.gov.au/taxonomy/term/39. Accessed: April
2012.
National Water Commission, The National Water Initiative, Canberra, 2011
http://www.nwc.gov.au/reform/nwi
Nation Water Commission, Australian Water Resources 2005. A baseline assessment of water
resources for the National Water Initiative. Level 1 Assessment Key Findings, Canberra, 2005
Natural Resource Policies and Program Committee, Australia’s strategy for the National Reserve
System 2009–2030, Canberran 2009. [on-line]
http://www.environment.gov.au/parks/publications/nrs/pubs/nrsstrat.pdf
NBN Co; National Broadband Network, National Map; www.nbnco.com.au/rollout/coveragemaps.
html?icid=pub:network::men:nbn‐cov
The Multiple Land Use Framework
51
NSW Department of Infrastructure and Planning, Strategic Regional Land Use Plan: Upper Hunter,
Sydney, 2012
http://www.nsw.gov.au/sites/default/files/uploads/common/UpperHunterSLUP_SD_v01.pdf
NSW Department of Infrastructure and Planning 2012. Draft New England North West Strategic
Regional Land Use Plan. www.planning.nsw.gov.au
NSW Department of Aboriginal Affairs, Land Rights and Land Councils, Sydney, 2001 accessed at
http://www.daa.nsw.gov.au/landandculture/landrights.html on 17/4/2012.
Noble, B., Strategic approaches to regional cumulative effects assessment: a case study of the Great
Sand Hills, Canada, Impact Assessment and Project Appraisal, 26(2), 2008, pp. 78–90
Noble, B. and Harriman, J., Regional Environmental Assessment (R‐SEA): Methodological Guidance
and Good Practice, prepared for the Canadian Council of Ministers of the Environment, 2008
OECD, Tourism satellite account recommended methodological framework, Luxembourg:
Commission of the European Communities, 2001
Orenstein, M., Lessons from Integrated Assessment: Shell Canada, The Role of Impact Assessment
in Transitioning to the Green Economy, 30th Annual Meeting of the International Association for
Impact Assessment 6‐11 April 2010, Geneva, 2010
Orenstein, M., Fossgard‐Moser, T., Hindmarch, T., Dowse, S., Kuschminder, J., McCloskey, P.,
Mugo, R. K.,Case study of an integrated assessment: Shell's North Field Test in Alberta, Canada,
Impact Assessment and Project Appraisal, 28(2), 2010, pp. 147‐157
Brooks University, Planning for delivery of quality of life benefits – an evaluation of planning
mechanisms for delivery of quality of life benefits with reference to Community Forests,
June 2002, Countryside Agency, Cheltenham, 2002
Paton, R., Draft Final Archaeology Report on the Test Excavations of the Jordan River Levee Site
Southern Tasmania, Unpublished report for the Department of Infrastructure Energy and Resources,
2010
Parsons Brinkerhoff, Mindarie Mineral Sands Project – Mindarie C and A(2) – Program for
Environment Protection and Rehabilitation, 2011 – available at:
http://www.pir.sa.gov.au/__data/assets/pdf_file/0004/170995/PEPR_main_text.pdf ‐ accessed 8/5/12
Policy and Financing for Sustainable Land Management in Africa. The Challenges, lessons from
experience and guidance for action. United Nations Convention to Combat Desertification. Year ?
(>2005).
Public Statements of government agencies on the Strategic Environmental Assessments can be
found at: http://www.ceaa.gc.ca/default.asp?lang=En&n=4002B60C-1
Queensland Government,Sustainable Resources Communities Policy – Social impact assessment in
the mining and petroleum industries, Brisbane, 2008
http://www.google.com.au/url?sa=t&rct=j&q=&esrc=s&frm=1&source=web&cd=1&ved=0CC8QFjAA&
url=http%3A%2F%2Fwww.wellington.vic.gov.au%2Ffiles%2Ff252057e-404a-4d44-9ab3a1cc00cbebf3%2FQLD-Government-Sustainable-Resource-CommunitiesPolicy.pdf&ei=nW1fUtG0JOWfiAfO94CQCQ&usg=AFQjCNG_6QtYbykzFeRB7e4-H2ggZ18kJQ
Queensland Department of Employment, Economic Development and Innovation, Land access code,
2010
The Multiple Land Use Framework
52
Queensland Department of Employment, Economic Development and Innovation, Surat Basin future
directions statement. Final report, 2011
Queensland Department of Employment, Economic Development and Innovation, Land access policy
framework, 2011 http://mines.industry.qld.gov.au/mining/land‐access‐policyframework.htm Accessed
10/05/2012.
Queensland Department of Environment and Resource Management, Reef Wise Farming, 2012
http://www.reefwisefarming.qld.gov.au/
Queensland Department of Environment and Resource Management,) The Great Artesian Basin,
2011
Queensland Department of Environment and Resource Management, Protecting Queensland’s
strategic cropping land. Guidelines for applying the proposed strategic cropping land criteria, 2011
Queensland Department of Environment and Resource Management,. Strategic cropping land
Protection and Management Areas, 2011. http://www.derm.qld.gov.au/factsheets/pdf/land/l274.pdf
Queensland Department of Environment and Resource Management, Strategic cropping land, 2012
http://www.derm.qld.gov.au/land/planning/strategic‐cropping/index.html Accessed 10/05/2012.
Queensland Department of Environment and Resource Management,. Strategic cropping land
standard conditions code for resource activities, January 2012.
Queensland Department of Environment and Resource Management, State Planning Policy 1/12.
Protection of Queensland strategic cropping land, 2012
Queensland Department of Local Government and Planning, Surat Basin Regional Planning
Framework – A framework for a prosperous and sustainable community, 2011
http://www.dsdip.qld.gov.au/resources/plan/surat-basin-regional/planning-framework.pdf
Queensland Government, Coal seam gas water management policy, 2010
Read V.T.,. The concept of prime agricultural land: A Western Australian perspective. Department of
Agriculture Resource Management, Technical Report No. 72, 1988
Rechmann, B., Kommunalverband Ruhrgebiet: the Ruhr’s expert in Regional co‐operation,
Ekistics: The Problems and Science of Human Settlements, Vol. 59, No. 352/353, 1992
Remedios Fajardo Gomez, ‘Violacion sistematica de los derechos humanos de indigenas, negros
ycampesinas por parte de la multinacional minera Intercor filial de Exxon,’ en el departamento de La
Guajira, Colombia, August 9th, 2
Routley R and Routley V., The fight for the forests: the takeover of Australian forests for pines, wood
chips and intensive forestry. Research School of Social Sciences, Australian National University,
Canberra, 1972.
Ryan MF, Spencer RD and Keenan RJ,. Private native forests in Australia: What did we learn from
the Regional Forest Agreement program, Australian Forestry, 65, 2002, pp.141‐152.
Salian, P. and Anton, B.,) The Emscher Region ‐ the opportunities of economic transition for
leapfrogging urban water management, input to deliverable 6.1.5‐6 Comparative Analysis of
The Multiple Land Use Framework
53
Enabling Factors for Sustainable Urban Water Management, SWITCH ‐ Managing Water for the City
of the Future, ICLEI European Secretariat, n.d.
Selod, H., Using the land governance assessment framework (LGAF) Lessons and next steps,
presented at the Annual World Bank Conference on Land Policy and Administration,
Washington, 2011
Shaw, Robert, The International Building Exhibition (IBA) Emscher Park, Germany: A Model for
Sustainable Restructuring?, European Planning Studies, 10(1), 2002, pp. 77‐97.
Sieverts, T., Urban networks and townscape: is the Emscher region a model for the city of the
21st Century? in K. Wachten(Ed.), Change Without Growth: Sustainable Development for the 21st
Century, Struve’s Buchdruckerei und Verlag GmbH, Eutin, 1996
Solar, S., Shields, D., Miller, M., Mineral Policy in the Era of Sustainable Development: Historical
context and future content, RMZ – Materials and Geo‐environment, Vol. 56, No. 3, 2009, pp. 304 ‐
321.
Slee B., Resolving production‐environment conflict: the case of the Regional Forest Agreement
Process in Australia, Forest Policy and Economics, 3, 2001, pp.17 ‐ 30
SPG Media Limited, Net Resources International, Fimiston Open Pit "Super Pit" Gold Mine, Australia.
Available at: http://www.mining-technology.com/projects/superpitgoldmineaust/
State of the Environment 2011 Committee, Australia state of the environment 2011. Independent
report to the Australian Government Minister for Sustainability, Environment, Water, Population and
Communities, DEEWPaC, Canberra, 2011.
Stirzaker R, Vertessy R and Sarre A., Trees, water and salt: An Australian guide to using trees for
healthy catchments and productive farms, Joint Venture Agroforestry Program, RIRDC Publication
No. 01/086, 2002.
Stratos, Evaluation of the Cabinet Directive on the Environmental Assessment of Policy, Plan and
Program proposals, final report, prepared for the Canadian Environmental Assessment Agency:
Ottawa The Canadian Council of Ministers of the Environment, Ottawa,2009 Regional Strategic
Environmental Assessment in Canada: Principles and Guidance
The Australian Business Journal,, Coal mining banned in Margaret River, The Australian Business
Journal, 24 July 2012 Available at: http://www.australianbusinessjournal.com.au/mining-in-margaretriver-poses-unacceptable-environmental-risk/.
Thompson D,. Plantations for Australia: The 2020 Vision. A progress report by the 2020 Vision
Partners, Plantations 2020, Armidale, 2008.
Tourism Research Australia, Regional Tourism Profiles 2010‐11, Canberra, 2012
http://www.tra.gov.au/statistics/Regional-overview.html
Tuinhof A, Dumars C, Foster S, Kemper K, Garduño H and Nanni M .,. Sustainable Groundwater
Management Concepts and Tools. GW ‐Mate. The World Bank, n.d. Available at http://www.unigrac.org/publications/441 Accessed on 24 April 2012
United Nations, Extractive Industries and Conflict: Guidance Note for Practitioners. United Nations,
Washington, 2012http://www.un.org/en/land-natural-resources-conflict/extractive-industries.shtml
The Multiple Land Use Framework
54
United Nations, FAO Planning for Sustainable Use of Land Resources. Towards a New Approach,
Food and Agriculture Organisation of the United Nations, Washington, 1995
United Nations Global Compact Principles http://www.unglobalcompact.org/AboutTheGC/index.html
United Nations Environment Programme, Planning for Change: Guidelines for National Programme
on Sustainable Consumption and Production, United Nations Environment Programme,Paris,, 2008.
UN Millennium Development Goals Background, 2000 http://www.un.org/millenniumgoals/bkgd.shtml
United Nations, Negotiating a Sustainable Future for Land, United Nations Environment Programme
and Food and Agriculture Organisation of the United Nations, Washington, 1997
Seiser, A., Restoring jarrah forest in southwestern Australia after bauxite mining, University
of Minnesota, Department of Horticultural Science, Restoration and Reclamation Review,Vol.7, No.1,
2001 A. Available at: http://conservancy.umn.edu/bitstream/60118/1/7.1.Seiser.pdf Student Online Journal, vol 7, No 1.
University of New South Wales n.d. Connected waters.
https://www.connectedwaters.unsw.edu.au/resources/articles/subsidence.html. Accessed on 13 April
2012.
Vasse Coal overview, on-line. Available at: http://vassecoal.com.au/site/index.cfm?display=242413.
Victorian Competition and Efficiency Commission, Issues Paper: Inquiry into Victoria’s tourism
industry, October, 2010
http://www.vcec.vic.gov.au/CA256EAF001C7B21/WebObj/TourismIssuesPaper/$File/Tourism%20Iss
ues%20Paper.pdf
Victorian Government, Metropolitan Planning Authority, Growth Corridor Plans, Chapter 4 - The west
growth corridor plan, 2012 Available at: http://www.gaa.vic.gov.au/wp-content/Assets/Files/GCP%20%20Chapter%204%20West%20Corridor%20Plan.pdf.
Victorian Department of Planning and Community Development, Victorian Planning Provisions, 2011.
14.01‐1 Protection of agricultural land. http://planningschemes.dpcd.vic.gov.au/aavpp/14_sppf.pdf
Victorian Department of Planning and Community Development,. Melbourne 2030. A planning update.
Melbourne at 5 million, 2008
http://www.dpcd.vic.gov.au/planning/plansandpolicies/planningformelbourne/planninghistory/melbourn
e@5million
Victorian Department of Primary Industries, Community Engagement Guidelines for Mining and
Mineral Exploration in Victoria, 2008
http://www.energyandresources.vic.gov.au/__data/assets/pdf_file/0003/19578/CE_Guide_Exp_and_
Min.pdf
Victorian Department of Sustainability and Environment, Code of Practice for Timber Production,
2007http://www.ballarat.vic.gov.au/media/591953/code_of_practice_for_timber_production.pdf
Victorian Department of Sustainability and Environment, Victorian Best Practice Guidelines for
Managing Coastal Acid Sulfate Soils, 2010
http://www.dse.vic.gov.au/__data/assets/pdf_file/0009/97191/DSE‐CASS_Strategy3‐web.pdf
Vertessy, R., Zhang, L. and Dawes, W., Plantations, river flows and river salinity, Australian Forestry,
66, 2003, pp. 55 – 61.
The Multiple Land Use Framework
55
Wachten, K., About the exhibition, in Wachten, K (Ed.) Change Without Growth: Sustainable
Development for the 21st Century, Struve’s Buchdruckerei und Verlag GmbH, Eutin,1996.
Walcott, J., Agriculture and biodiversity: connections for sustainable development, Bureau of Rural
Sciences Canberra, 2004
Websites for Carbones de Correjon; Departamento de La Guajira, Bogata, Columbia
http://www.cerrejon.com/site/english/
Western Australia, Department of Industry and Resources, Introduction to the completion criteria for
Alcoa’s Bauxite mine rehabilitation, Perth, 2007 Available at:
http://www.dsd.wa.gov.au/documents/Bauxite_Mine_Rehabilitation(1).pdf
Western Australian Government, Environmental Protection Agency, Fimiston project state II – mine
and waste dumps report and recommendations Available at:
http://epa.wa.gov.au/EPADocLib/502_B539.pdf.
Western Australian Government, Environmental Protection Agency, Fimiston Gold Mine Operations
Extension (Stage 3) and Mine Closure Planning report and recommendations. Available at:
http://epa.wa.gov.au/EPADocLib/2612_Bul1273_KCKM_FimistonPER.pdf.
Western Australian Government, Environmental Protection Agency, Vasse Coal Project report and
recommendations Available at: http://edit.epa.wa.gov.au/EPADocLib/Final_VCP_EPA_Report_20-0411.pdf.
Western Australian Government, Environmental Protection Agency, Vasse Coal Project, Newsletter,
Available at: http://www.epa.wa.gov.au/AbouttheEPA/EPAnews/Pages/VasseCoalProject.aspx.
Western Australian Department of Environment and Conservation, The Great Western Woodlands –
Biodiversity and Cultural Conservation Strategy, Perth 2010.
Western Australia Environmental Protection Authority, Environmental Offsets Position Statement, No.
9, January, 2006
Whitelaw, G., McCarthy, D., Kirchhoff, D., Crandall, D., Levin, D. Exploring Strategic Environmental
Assessment in the Context of a Rapidly Urbanizing Municipality: A Case Study of the Regional
Municipality of York, Ontario, Canada, A Synthesis Report for the Canadian Environmental
Assessment Agency: Ottawa, 2010
Wilmot, A. and Harris, K., Community Woodland baseline Report Wales, Report commissioned by
Forest Research: Surrey, 2009
Wit, P., Vergeye, W., Land Use Planning for Sustainable Development, Land Use Land Cover and
Soil Sciences,Encyclopedia of Life Support Systems, Vol 3, UNESCO, 2002
Wocat, Sustainable Land Management in Practice: Guidelines and Best Practices for Sub ‐Saharan
Africa, A UN TerrAfrica Partnership Publication, (Year > 2005).
Wood, G., Projektorientierte Planung im Ruhrgebiet: Die Internationale Bauauststellung (IBA)
Emscher Park, in Habrich, W. and W. Hoppe, W. (Eds.) Strukturwandel im Ruhrgebiet; Perspektiven
und Prozesse, Dortmunder Vertrieb für Bau- und Planungsliteratur, Dortmund, 2001 pp. 71 – 83.
WPA Coordination Office (2012) – http://www.defence.gov.au/woomera/index.htm ‐ accessed 8/5/12
The Multiple Land Use Framework
56
World Bank, Sustainable Land Management. Challenges, Opportunities and Trade‐offs, The World
Bank, Washington, 2006.
World Bank, Sustainable Land Management Sourcebook. Agriculture and Rural Development, The
World Bank, Washington, 2008.
World Bank, Sustainable Groundwater Management: Concepts and Tools, The World Bank water
resources website (www.worldbank.org/gwmate) and the Global Water Partnership
World Bank 2003 Incorporating Social Dimensions into Bank support projects
http://siteresources.worldbank.org/INTTSR/Resources/SocialAnalysisSourcebookFINAL2003Dec.pdf
Wyndham City Council, Sustainable Land ManagementAvailable at:
http://www.wyndham.vic.gov.au/environment/landbiodiversity/landmanagement.
Xstrata 2011 Submission to Australian Government Biodiversity Policy and EPBC Act Environmental
Policy Consultation Drafts http://www.environment.gov.au/epbc/reform/pubs/offset-policy/32xstrata.pdf
Yainshet, A. Lampard, M. Copeland, A. And Heyhoe, E.,. An economic assessment of mineral
developments within the Woomera Prohibited Area, Australian Bureau of Agricultural and Resource
Economics – Bureau of Rural Sciences, Canberra, 2010
Zaar U, George DC, Matsuyama A and Haig T., Aboriginal views on “Balancing the Budget”, Paper
presented at International Association of Hydrogeologists Conference, Darwin 2002.
The Multiple Land Use Framework
57
The Multiple Land Use Framework