Annex C: Programme Document Part 1: Programme Document – to be drafted and finalized with the CSO Section 1. Programme & CSO overview 1.1 Programme submission reference 1.2 Organization information UNICEF Office Islamabad, Pakistan Programme Title Water, Sanitation & Hygiene Sanitation Program at Scale in Pakistan (SPSP) Submission date 1 March 2015 Organization Name Basic Development International Acronym BDI Name of CSO Authorized Mr. Harris Official 1.3 Programme information 1.4 Programme budget Title Chief Executive Officer Email harris@mail.com Phone +52 999-999-9999 Name of Progr. Focal Point Ms. Pasti Title Manager Programmes Email pasti@mail.com Telephone +52 999-999-9999 Duration One Year effective 1 April’15 Geographical coverage Across country Population focus 70,000 From CSO 41,000 9.3% From UNICEF 399,850 90.7% Total 440,850 Section 2. Programme description 2.1 Rationale/ justification (3 to 5 paragraphs; max 400 words) “Why” this programme This section outlines the problem statement, the context and the rationale for the Programme: Overview of the existing problem, using data (disaggregated) from existing reports; who is affected and what are the barriers/bottlenecks to outcomes for children? How the problem is linked to national priorities and policies; The relevance of the Programme in addressing problem identified. As per Multiple Indicator Cluster Survey (MICS) 2013, 45% population have no household toilets, which means population defecates in open places, a significant health hazard for the people. 60% of population has soap at place of hand washing and 85% have soap availability anywhere in the dwelling. As per survey conducted by Pakistan Rural Support Programme (Punjab Health Survey 20122014), children of Bahawalnagar reported following diseases/health issues to their health centers; Aresnicosis Cholera Flurosis Guinea worm disease Intestinal worms Malaria 35% 22% 18% 40% 55% 32% 1 Schistosomiasis Trachoma Typhoid 15% 6% 26% This project is UNICEF priority for this year which is accordance to National Sanitation Policy, Rural Development Policy of Government of Punjab 2014-15 and MDG goal 7 B, D and G. District governments and local government has shown great interest in collaborating with development partners for open defecation free campaign. For this purpose Local Government & Community Development Department (LG&CDD) has drafted a plan for ODF tehsil for Chishtian in Bahawalnagar district. The government is envisaging support from NGOs for supporting to have ODF villages in tehsil Chishtian of Bahawalnagar. In this spirit a project plan is developed by UNICEF and BDI, BDI will target 3 Union councils for 100 open defecation free villages by reaching 70,000 people by April 30, 2016. The project will be implemented in 3 districts. The purpose of the project is to ensure access to improved sanitation by creating open defecation free environment for 70,000 people in target villages. It will enable the affected population to realize their right to improved sanitation and hygiene and focus on reducing and preventing the incidence of WASH related diseases. The project will be implemented by combining hardware and software components that are necessary to create a healthy environment and to develop or support safe hygiene practices. It focuses on development of life-skills, a healthy and safe environment for the target population. The key activities to be undertaken are as follows: Provide access to improved sanitation services to 70,000 people through Pakistan Approaches to Total Sanitation (PATS) by facilitating the communities to open defecation free environment in 100 villages/basties. Identify 100 Community Resource Persons and build their capacity for triggering sanitation campaigns in 100 villages/basties. Train 100 school teachers for formation of WASH Clubs and triggering School Led Total Sanitation. Installation of 500 latrines low cost latrines for 5% extremely vulnerable people. Undertake hygiene promotion including messages on safe hygiene practices (latrine use, use of safe water and personal and domestic hygiene) through Behavior Change Communication (BCC) campaigns. Celebrate World Water Day, World Toilet Day, Global Hand Washing Day and collaborate with health teams during Mother and Child Week. The key strategies to be followed for effective and efficient implementation of the project include community involvement/participation at all stages of the project , service delivery, Behavior Change Communication (BCC) campaigns, Inter personal Communication (IPC) and locally/culturally appropriate technologies, capacity development, gender mainstreaming, Disaster Risk Reduction (DRR), ensuring government lead/ownership and coordination with other partners. 2.2 Expected results (No narrative required) “What” this programme will achieve The table below defines the programme results framework (results and their link to results defined in the country programme and/or humanitarian response plan; specific indicators, baselines, targets and MOV for each programme output). 2 Result statement Performance indicator/s Baseline Target Means of Verification1 People (incl. children and - Xxx women) provided training on - Xxx benefits or access to toilets and hand washing facilities that are culturally appropriate, secure, sanitary, user-friendly and gender-appropriate # of masons trained on low cost latrine 0 Programme Output Sanitation demand sustained installation and using the skills with supply side interventions 1000 -Quarterly progress reports -Quarterly Progress Reports -Final completion report # of demonstration latrines installed 0 for vulnerable families as per agreed criteria with community (maximum 5%) 300 -Third party monitoring reports -Field visit reports by UNICEF staff -Quarterly reports by IPs -Photographs # of latrines installed and hand 0 washing facilities in public schools as per agreed criteria with Education board 200 Quarterly progress reports Quarterly Progress Reports # of children (boys and girls) access to sanitation and hygiene in Schools # of people reached with demand 0 creation for sanitation and hygiene through community events (theaters, puppet shows) 70,000 Final completion report 2.3 Gender, Equity and Sustainability (3 paragraphs; max 250 words) “How” this programme takes into account gender, equity and sustainability This section briefly mentions the practical measures taken in the programme to address gender, equity and sustainability considerations. Construction of 500 environment friendly and low cost (with few design options) will meet demand of the lowest income families, children and especially women. These latrines in all villages will be for demonstration of technical solutions. It is therefore very important that design of these latrines fits with the income level of at least the second lowest income quintile. Families exclusively women who can’t go to toiles in day light will be in focus group and help their families in decision making to construct latrines in their houses. Education board will take of school latrines through Parents Teachers Association and every month additional 1000 will be paid to school funds for maintance and cleaning. Public health engineering department will link all household latrines with sewerage system and at village level. Tehsil in-charge officials will ensure to discuss sanitation issues in their monthly public meetings. Teachers, religious leaders, masons, community leaders, working women, mart owners, LHV, LHW and local government official will take responsibility to keep the community aware. 2.4 Partner’s contribution This section briefly outlines the partner specific contribution to the programme (monetary or in-kind) 1 The specific sources from which the status of each of the performance indicators can be ascertained. If any data source is a survey or a study which the implementing partner is planning to conduct for this programme, this should be planned and budgeted for in section 3 below (programme workplan and budget). 3 (1 paragraph; max 100 words) Partner will contribute in operation cost of the project in terms of field offices rent, warehouse rent, contribution of operation staff salaries, monitoring staff and related cost i-e vehicle rental, fuel, maintenance etc. Partner will use already developed manuals, which will be updated by its technical team and will be used as a contribution. 2.5 Other Public Health Engineering Department and Local Government will also take part of the all partners involved programme implementation and will also help to approve all training material. Parents Teachers Associations of the schools, youth organisation and local clubs will also be invited (1 paragraph; to be part of trainings. max 100 words) 2.6 Other considerations (3 paragraphs; max 250 words) List any other critical aspects of programme delivery specific to the programme document. For example, in humanitarian response content related to how the partner will meet the IASC Commitments to Affected Population.2 2.7 Additional documentation (1 paragraph; max 100 words) Additional documentation can be mentioned here for reference. 2 Since 2011, together with other members of the IASC, UNICEF formally endorsed commitments to affected population in five areas: 1) Leadership and Governance; 2) Transparency; 3) Feedback and complaints; 4) Participation; and 5) Design, monitoring and evaluation. 4 Section 3. Programme work plan and budget The table below defines the programme implementation work plan (the specific activities to be undertaken towards achievement of each of the programme outputs; the schedule of implementation; and the planned budget, including the CSO and UNICEF’s contributions to the programme). Result Level Timeframe (quarters/year(s) Result/activity Q1 Q2 Q3 Q4 Year2 Progr. 70,000 People (incl. children and women) provided access to toilets and hand Output 1: washing facilities that are culturally appropriate, secure, sanitary, user-friendly and gender-appropriate Total CSO (CSO+UNICEF contribution ) UNICEF contribution Cash3 157,000 9,000 143,000 25,000 2,000 23,000 Supply 5,000 Performance indicator(s): Act.1.1 100 school teachers and education officials trained on facilitating SLTS Act. 1.2 Formation and strengthening of 100 WASH clubs in school (Cost will be used for soap and other sanitary cleaning items) Act. 1.3 Capacity developed of 100 Village Sanitation Committees (VSCs) on demand creation for sanitation Act. 1.4 Conduct 1 capacity development event to enhance ownership of PATS by government officials and political leaders Act. 1.5 Street Theatres & Puppet Shows Act. 1.6 Community Action Plans (CAPs) developed in 100 villages x x x x 3 50 masons trained in low-cost latrine installation 50,000 45,000 5,000 x 25,000 x x x x x x x x x x 2,000 23,000 x x Progr. Sanitation demand sustained with supply side interventions Output 2: Performance indicator(s): Act 2.1 x x 2,000 2,000 50,000 50,000 5,000 5,000 152,000 12,000 6,000 1,000 125,000 15,000 5,000 The budget is prepared in the currency of implementation. Most generally, this correspond to the local currency in the country. 5 Result Level Timeframe (quarters/year(s) Result/activity Q1 Act. 2.2 15 entrepreneurs/middle men trained on establishing sanitation marts Act. 2.3 100 villages declared/verified & certified as Open Defecation Free (ODF) villages Act. 2.4 End line survey conducted Act. 2.5 Construct low-cost, environment friendly, gender appropriate and secure demonstration latrines (for 5% vulnerable families in 100 villages) Q2 Q3 Q4 x x x x x x x Year2 Total CSO (CSO+UNICEF contribution ) 11,000 1,000 10,000 10,000 UNICEF contribution Cash3 Supply 10,000 10,000 10,000 115,000 100,000 15,000 x Sub-total for the outputs Progr. Effective and efficient programme management Output 3 107,000 Act. 3.1 Salary of Programme manager, Filed Engineer, Sanitation Marketing Specialist, Monitors X X X X Act. 3.2 Office rent, utilities, warehouse rent, guards, admin officer, finance officer, warehouse in charge X X X X Act. 3.3 Vehicle rent, fuel, maintenance, drivers X X X X Sub-total for programme costs HQ costs4 HQ technical support5 (7% Total programme document budget 20,000 50,000 87,000 50,000 22,000 15,000 7,000 35,000 5,000 30,000 41,6000 41,000 355,000 of the cash component) 20,000 24,850 440,850 41,000 379,850 20,000 * UNICEF specifies whether subsequent year funding in the programme budget is indicative for planning purposes only. UNICEF Offices can add additional columns for multi-year planning 4 5 Only payable to organizations with headquarters outside of the country of implementation. Amount is an estimate. Amount paid is a standard 7% on actual expenditures subject to calculation exclusions as per Annex H of the CSO Procedure. 6 Section 4. Partnership review (To be completed with UNICEF as part of finalization of the programme document) 4.1 Financial management assessment (if applicable)6 Date planned/ completed 15 Jan’2015 Risk rating7 Significant 4.2 Assurance activities planned for the programme duration8 Type # Date planned/ frequency Programmatic visits 4 Every Quarter Spot checks 3 July’15, Dec’15, April’16 Audit9 Yes/No No 4.3 Other Partnership review Yes Mid review Sep 2015, End review March 2016 4.4 Cash transfer Advance modality(ies) 4.5 PRC Ref.#10 Section 5. Other requirements 5.1 Additional reporting required Specify any reporting requirements in addition to the FACE form and attached standard programme progress/final report Partner needs to be submitted to Government their implementation status report on monthly basis complied by their field monitors. 5.2 Applicable technical specifications or guidance Specify any technical specifications or guidance this is applicable to the programme implementation 5.3 Supply Specify any protocols, lead times and other key considerations related to supply considerations, if requirements applicable 5.4 Other 6. Signatures and date ______________________________________ ________________________________________ CSO Authorized Official, signature and date UNICEF Representative name, signature and date 6 As per UNICEF HACT Procedure, Ibid, High risk is assumed for an implementing partner requiring a micro assessment until the assessment is completed. If the partner does not require a micro assessment, the risk rating is “non-assessed” unless the financial management checklist is used to determine a risk rating. 8 Ibid 9 One audit is scheduled during the programme cycle if one or more of the programme documents with the CSO reach a cumulative value of $500,000 or more. 10 Partnership Review Committee Reference number. 7 7