Statement of Requirements (for Space Projects) <Project Name> <Location (if applicable)> <Client> National Project Management System Definition Phase Version: November 23, 2015 Prepared by: Date: Lease Number: SOR Template for Space Based Projects Table of Contents Section I - Statement of Requirements...............................................................................................................2 1. Problem/Opportunity Definition ............................................................................................................2 2. Background .............................................................................................................................................2 2.1 Project History.......................................................................................................................................2 2.2 Building Condition .................................................................................................................................2 2.3 Tenant Considerations ..........................................................................................................................3 2.4 Strategic Context...................................................................................................................................4 2.5 Stakeholders..........................................................................................................................................4 3. Project Scope .........................................................................................................................................4 4. Risk Considerations .................................................................................................................................5 5. Project Identification Stage Funding Requirement .................................................................................6 6. Appendices ..............................................................................................................................................6 Section II - Client Approval ..................................................................................................................................7 1. Client Approvals Sought ..........................................................................................................................7 2. Client Signature(s) ...................................................................................................................................7 Section III - PWGSC Approval ..............................................................................................................................8 1. PWGSC Approvals Sought .......................................................................................................................8 2. Source of Funds.......................................................................................................................................8 3. PWGSC Signatures...................................................................................................................................9 1 SOR Template for Space Based Projects Section I - Statement of Requirements A Statement of Requirement document is a proposal to an authority, stating a problem or an opportunity and seeking funding and approval to conduct Project Identification Stage activities. The Statement of Requirements provides a broad description of the nature of the requirement, overall timing and any special considerations. Note: A Statement of Requirements must be written for each client within a project. 1. Problem/Opportunity Definition 1. General Information Client requirement Occupancy Expiry Date New Acquisition Date Deadline to exercise lease option(s) (if applicable) Location of space (address) 2. Drivers Program requirements Current Accommodation not suitable (if applicable) Possible opportunities 3. Previous approvals, decisions or agreements: Real Property Investment Board (RPIB) Regional Investment Management Board decision (RIMB) Treasury Board approvals (TB) Cabinet or Ministerial decision Interdepartmental agreement 4. Special Involvement of other departments Note: This section should not include any indication of the proposed solution. Its purpose is to concentrate on what drives the project. 2. Background 2.1 Project History - Description of tenants Short description of the relevant history of the client occupancy at this location Date when the client first occupied the space 2.2 Building Condition 1. Brief description of building Age, area , location, main characteristics, classification of the building, building owner History of occupancy (When did the federal government begin leasing in this building? How was this space acquired initially?) Environmental performance assessment (BOMA BESt, LEED, etc) 2 SOR Template for Space Based Projects 2. Overall condition Building Performance Report (Building-related problems and impacts) Recent renovations, refresh projects or tenant service projects, and fit-up condition Accessibility Report (if not available; must have a confirmation from Property Management on condition, and should include the estimated date that the report will be available) Lease Condition Report (LCR) (if not available; must have a confirmation from Property Management on condition, and should include the estimated date that the report will be available) 2.3 Tenant Considerations 1. Description of tenants Background information on tenants Inventory of current occupancies for Client Departments Nature of program(s) that may be impacted by this requirement Inventory of current occupancies in the region1 Client Occupancy Starting Date Name or address Fontaine Monclair Apr. 1, 2009 May 1, 2010 Saint-Joseph Vincent Massey May 1, 2010 Aug. 1, 2011 Expiry Date Dec. 31, 2013 Mar. 31, 2013 Aug. 31, 2014 Mar. 31, 2016 Lease Expiry Date Office Options Left Dec. 31, 2022 Apr. 30, 2020 Aug. 31, 2014 Jul. 31, 2036 1 X 5Y Grand Total m2u 117.6 1,350. 1 195.6 1,477. 0 3,140. 3 SPS m2r 129.2 1,357. 9 225.9 2,429. 0 4,142. 0 m2u Total m2r m2r 129.2 1,357.9 752.8 884.3 225.9 3,313.3 752.8 884.3 5,026.3 Current client(s) occupancies affected by this requirement Note: for Special Purpose Space (SPS) and office, even if they are the same rate, they should always be shown separately Client Lease No OI Funding ABC 123456 4A000 0 Non-reimbursing 123457 4A000 1 Reimbursing Type of Space FTEs m2u m2r Parking Occupancy Expiry Office SPS 62 May 31, 2015 46 1,125. 6 562.8 844.2 2 Office 1,000. 0 500.0 750.0 3 May 31, 2015 2,250. 0 2,532. 6 5 Total for ABC 2. 1 108 Impact of current problem/opportunity on tenants (if applicable) Additional tenant costs Disruption of Program Required relocation In-service date This information is from the OI List 3 SOR Template for Space Based Projects 3. Client liaison activities (if applicable) How client concerns are currently being dealt with 2.4 Strategic Context 1. Describe how the problem/opportunity relates to current strategies and plans National Investment Strategy (NIS) Regional Investment Strategy (RIS) Community Based Investment Strategy (CBIS) Portfolio Strategy Strategic Action Plan Lease Action Plan Client Strategy (Explain the client’s long-term and short-term accommodation strategy) Government of Canada Workplace 2.0 (WP2.0) fit-up standards 2. Meet with Portfolio Management, Owner Investor Analyst, Asset Manager and any other relevant stakeholders, to ensure that all necessary background information is included; any additional directives from upper management, priorities, budget cuts, strategic and operating review, etc. Also, obtain a copy of the Accommodation Projects 101 Workbook, which explains PWGSC’s accommodation project processes and helps guide you through the implementation of an accommodation project from start to finish. 2.5 Stakeholders 1. List all the relevant stakeholders who have an involvement in the problem/opportunity 2. Briefly describe their stake 3. Project Scope 2 1. Requirements Space required : number of FTEs to accommodate, m2 of Special Purpose Space (SPS), m2 of storage (warehouse, training rooms, etc,) Type of space (identify if any non-compliant space or SPS was approved by PWGSC) Swing Space (if applicable) Geographical boundaries including justification of boundaries chosen North: _________ South: _________ West: _________ East: _________ - Identify the City and Province. Identify unique program and/or operational requirements that may further restrict the geographic boundaries as per the Geographic Boundaries Procedure. - Date by which space is required Length of term as required by client 2 If a Client Accommodation Requirement Questionnaire (CARQ) and/or a Tenant Requirement Package (TPR) were filled-out include them in the appendices. 4 SOR Template for Space Based Projects 2. PWGSC Space Allocation Limits (see table below) Number of FTEs Space entitlement (m2u/ m2r) as per Space Allocation Limits (WP2.0) Ratio m2u/FTE (current vs. WP2.0) Determine if space is quasi-judicial; if yes, WP2.0 entitlement is different If client is above m2u/FTE target, justification is required Requirements for compliance to WP 2.0 fit-up standards and exemptions (non-compliant space) Space Allocation Standards based on future project requirement Client X Y Z Type of Space Office – General Administration Office – Public Contact Office – Quasi-Judicial Total Usable Area Required FTEs 183 Office 5 SPS 0 0 188 Space Allocation Limits (m2u) 2,429.12 Requested Space (m2u) Variance (+/-) Utilization rate (m2u /FTE) 2,430 0 12.92 0 0 2,429.12 0 0 2,430 0 0 n/a n/a 12.92 Office Space Calculator 3. Operational parking requirements (as per the custodial parking policy) 4. Special considerations (if applicable) Specific location within a building (ground floor, retail space, etc.) Specific type of location Security requirements (highly sensitive) Heritage building 5. Client demand forecast (if applicable) Factors influencing future demand Likelihood of factors Impact on client requirements Future changes in funding levels 6. Occupancy commitments (client commitment vs. lease term) 7. Impact on space envelope and source of client funding (ECF or Non-Reimbursing) 4. Risk Considerations 1. Identify any potential risks that might come up when developing the project, any risks that might impact the success of the proposed project. Some examples could be: Risk of client commitment to the project Risk of lack of funding Risk of public perception of the established requirements Risk of changing priorities in the Federal Government or department Etc. 2. Identify how and when these risks will be mitigated through the next steps of the project (Feasibility Report, Investment Analysis Report, additional studies, etc.) 5 SOR Template for Space Based Projects 3. Risk of not proceeding. State the risk(s) that management would be exposed to if approval to start the project is not granted. Some risks could pertain to, but not restricted to: Health and safety Timing Delays Cost increase or escalations Operational restraints 5. Project Identification Stage Funding Requirement Approval of Expenditure Authority in the amount of $XX (total costs, substantive estimates, current dollars, including HST of $XX) to undertake the scope of work outlined in the table below in order to develop this project to Project Approval (PA). REQUIRED SEED FUNDING Item FY1 20XX/XX FY2 20XX/XX FY3 20XX/XX Statement of Requirement (SOR) Project Complexity Risk Assessment (PCRA) Preliminary Project Plan (PPP) Functional Program (if required) Consultant Feasibilities Studies PWGSC Feasibility Report (FR) Investment Analysis Report (IAR) Project Charter Contingency TOTAL Total Client Funded Total PWGSC Funded 6. Appendices 1. 2. 3. 4. Appendix A: Client Accommodation Requirements Questionnaire (if available) Appendix B: Tenant Requirements Package (if available) Appendix C: Security Requirement Checklist (SRCL) Appendix D: WP 2.0 Space Allocation Standard Calculator(if applicable) 6 TOTAL SOR Template for Space Based Projects Section II - Client Approval Note: This section only applies if client approvals are required 1. Client Approvals Sought 1. 2. 3. Approval of the Statement of Requirements Assignment of client representative(s) to the project team Client Funding All fit-up components that exceed the standards must be funded by the client department. In addition, the department is responsible for any client costs associated with this project such as, but not limited to the following: horizontal voice and data, approved non-compliant requests, additional security requirements related to the move and fit-up and all associated consultant fees and PWGSC fees related to the client funded portion fit-up, as well as furniture, fixtures and equipment (FFE). Lastly, client departments are financially responsible for both the rent and fit-up of any additional space that is deemed to be ECF reimbursing or fully reimbursing. 4. Summarize the dollar amount per fiscal year to be funded by the client in the chart below to undertake the scope of work outlined in Section I, Statement of Requirements. Full client cost will be established at the analysis phase. FY1 20XX/XX Item FY2 20XX/XX FY3 20XX/XX TOTAL Total Client Funded 2. Client Signature(s) The client representative endorses PWGSC to proceed with the Project Identification Stage of this problem/opportunity. In doing so, the client representative agrees to pay for client costs identified in Section I, subsection 5, Project Identification Stage Funding Requirement, of this SOR, and agrees to seek funding for their portion of the Project Delivery Phase following Project Approval (approved IAR). ACTION DATE SIGNATURE Recommended by Client Representative Approved by (Authorized Client Representative(s) – with Financial Signing Authority) 7 SOR Template for Space Based Projects Section III - PWGSC Approval 1. PWGSC Approvals Sought 1. 2. 3. Approval of the Statement of Requirements. Approval to initiate the documentation relevant to the development of this project to Project Approval (PA) consists of – specify the goal of the project. Approval of Expenditure Authority in the amount of $XX (total costs, substantive estimates, current dollars, including HST of $XX) to undertake the scope of work outlined in the table below in order to develop this project to the PA. Item FY1 20XX/XX FY2 20XX/XX FY3 20XX/XX TOTAL Total PWGSC Funded 4. Assignment of a PWGSC project team to consist of: Project Director Leasing Officer Senior Project Leader Client Accommodation Services Advisor (CASA) / Accommodation Manager Senior Project Manager Project Manager Professional and Technical Resources Senior Financial Advisor Property Manager Project OI Analyst Other (specify) 2. Source of Funds Identify the source of funds for the Expenditure Authority: - PWGSC Vote 1, Operating Expenditures and Contributions or Special Purpose Allotment, Real Property PWGSC Vote 5, Capital Expenditures , Real Property 8 SOR Template for Space Based Projects 3. PWGSC Signatures Note: Refer to NPMS directive to identify position and obtain the appropriate approvals in signature block below. Action Date Signature Prepared by Project Leader Recommended by Approved by 9