Pay attention! Most of the objects require replacing of the existing windows. In this regard, please make sure to install the windows with metal-plastic profiles of 4 chambers at least and the furniture from well-known European manufacturers. All products shall have quality certificates. Technical specifications for carrying out construction and renovation works at the following facility: Communal dormitory located at 1 Privokzalnaya str., Artemivsk. These technical specifications include technical descriptions of services that need to be provided in order to replace the existing wooden windows in the dormitory facilities. The current structural characteristics of the • Foundations are made of reinforced concrete building: blocks; • Brick walls; • Structural slabs are prefabricated slabs made of reinforced concrete; • Hipped roofing; • Wooden windows; • Wooden doors; • Flooring is made of linoleum and ceramic tiles. • Walls are finished with plaster coated with latex paint, wallpaper; walls in bathrooms are finished with oil paint and tiles. List of engineering systems installed in the building: Brief description of the facility: currently • A central hot-water heating system is installed; • Ventilation is natural; • Water supply system is connected to the existing water grid; • Plumbing system is connected to the existing grid; • Energy supply system is connected to the existing electricity grid; • Communications system is connected to the existing grid; The building requires replacing the existing wooden window frames with more energyefficient window units in order to improve heatsaving efficiency. List of existing facilities and construction services works that need to be provided in accordance with these technical specifications General construction works: • To replace existing wooden frame windows with fiberglass reinforced plastic window panels, VEKA type or of similar quality and heat conductance characteristics. Also, to replace windowsills and drip caps; to renovate window slopes and those window sashes that still open and to install 1 mosquito nets. • Windows - 128 items / 303,54 m2, , including: 1.35 x 1.10 m – 47 items / 69.79 m2; 1.37 x 2.13 m – 71 items / 207.18 m2; 2.02 x 1.45 m – 8 items / 23.78 m2; 0.9 х 1.55 m – 2 items / 2.79 m2 (transoms). • Explanation to windows: window slopes up to 0.35 m; windowsills up 0.4 m; drip caps up to 0.2 m; install a 4-chamber window profiles and 2chamber window glass panels with energy-saving coating. • To replace the existing doors in exterior walls with insulated metal doors, with reinforced plastic door frames: 2,1х1,55 m - 1 item / 3,25 m2; 2,1х1,0 m - 1 item /2,1 m2. • To take out and dispose of building waste. Technical specifications for carrying out construction and renovation works at the following facility: Communal dormitory located at 25 Sibirtzeva str., Artemivsk These technical specifications include technical descriptions of services that need to be provided in order to replace the existing wooden windows in the dormitory facilities. The current structural characteristics of the • Foundations are made of reinforced concrete building: blocks; • Brick walls; • Structural slabs are prefabricated slabs made of reinforced concrete; • Hipped roofing; • Wooden windows; • Wooden doors; • Flooring is made of linoleum and ceramic tiles. • Walls are finished with plaster coated with latex paint, wallpaper; walls in bathrooms are finished with oil paint and tiles. List of engineering systems installed in the building: currently • A central hot-water heating system is installed; • Ventilation is natural; • Water supply system is connected to the existing water grid; • Plumbing system is connected to the existing grid; • Energy supply system is connected to the existing electricity grid; • Communications system is connected to the existing grid. 2 Brief description of the facility: The building requires replacing the existing wooden window frames with more energyefficient window units in order to improve heatsaving efficiency. List of existing facilities and construction services works that need to be provided in accordance with these technical specifications General construction works: • To replace existing wooden frame windows with fiberglass reinforced plastic window panels, VEKA type or of similar quality and heat conductance characteristics. Also, to replace windowsills and drip caps; to renovate window slopes and those window sashes that still open and to install mosquito nets. • Windows - 41 items / 91,9 m2, including: 1.77 x 1.33 m – 28 items / 65.90 m2; 1.77 x 1.13 m – 13 items / 26.00 m2; • Explanation to windows: window slopes up to 0.3 m; windowsills up 0.35 m; drip caps up to 0.2 m; install a 4-chamber window profiles and 2chamber window glass panels with energy-saving coating. • To replace the existing doors in exterior walls with insulated metal doors, with reinforced plastic door frames – 8 items / 25.6 m2, including: 2,6х1,35 m – 5 items / 17,55 m2 (transoms); 2,0х1,35 m – 1 item / 2,7 m2; 2,05х1,1 m – 1 item / 2,25 m2; 2,35х1,35 m – 1item / 3,1 m2. • To take out and dispose of building waste. Technical specifications for carrying out construction and renovation works at the following facility: Secondary School #26 located at 128 Ulianivska str., Kramatorsk These technical specifications include technical descriptions of services that need to be provided in order to replace the existing wooden windows in the Kindergarten facilities. The current structural characteristics of the • Foundations are made of reinforced concrete building: blocks; • Brick walls; • Structural slabs are prefabricated slabs made of reinforced concrete; • Hipped roofing; • Wooden windows; • Wooden doors; • Flooring is made of linoleum and ceramic tiles. 3 • Walls are finished with plaster coated with latex paint, wallpaper; walls in bathrooms are finished with oil paint and tiles. List of engineering systems installed in the building: Brief description of the facility: currently • A central hot-water heating system is installed; • Ventilation is natural; • Water supply system is connected to the existing water grid; • Plumbing system is connected to the existing grid; • Energy supply system is connected to the existing electricity grid; • Communications system is connected to the existing grid; The building requires replacing the existing wooden window frames with more energyefficient window units in order to improve heatsaving efficiency. List of existing facilities and construction services works that need to be provided in accordance with these technical specifications General construction works: • To replace existing wooden frame windows with fiberglass reinforced plastic window panels, VEKA type or of similar quality and heat conductance characteristics. Also, to replace windowsills and drip caps; to renovate window slopes and those window sashes that still open and to install mosquito nets. • Windows - 128 items / 303,54 m2, , including: 1.87 x 1.92 m – 26 items / 93.35 m2; 1.95 x 2.25 m – 6 items / 29.38 m2; 1.87 x 1.52 m – 3 items / 8.53m2. • Explanation to windows: window slopes up to 0.3 m; windowsills up 0.4 m; drip caps up to 0.2 m; install a 4-chamber window profiles and 2chamber window glass panels with energy-saving coating. • To take out and dispose of building waste. 4