DO NOT REMOVE Liquid Chromatography-Mass Spectrometry (LC-MS) Standard Operating Procedure INSTRUMENT: Perkin Elmer Series 200 Liquid Chromatograph Perkin Elmer Series 200 Pump Perkin Elmer Series 200 Column Oven Perkin Elmer API 150EX Mass Spectrometer INSTRUMENT START-UP: A. Degassing Solvents 1. 2. 3. 4. 5. Ensure there are enough degassed solvents before running a sample Get a 500 mL or 1000 mL Erlenmeyer filter flask Place your solvent and a stir bar into the flask and sit it on a hot plate Hook up a vacuum line and stopper the top of the flask Turn on the vacuum and the stir plate a. DO NOT HEAT 6. The solvent is degassed when bubbles no longer appear 7. Place parafilm over the filtering arm and parafilm the top of the flask after you put the tubing in. A. The instrument should always be on, if not see alternative start up procedure: B. Open the nitrogen valve on the bench top C. Open the nitrogen valve in the gas storage room D. Open the nitrogen tank 1. Make sure the regulator pressure is set to 40 psi 1 DO NOT REMOVE E. Prime the pump 1. Open the panel on the LC-MS Pump 2. Open the black pump valve (turn counter-clockwise) Valve 3. On the LC-MS Pump screen press Purge 2 DO NOT REMOVE 4. 5. 6. 7. 8. 9. Press F3 and enter a flow rate of 1.00 Press Enter Allow the system to purge for 30 seconds Press Stop Close the black pump valve (turn clock-wise) Close the panel door A. Open Analyst Software 1.3.2 B. Click on Hardware Configuration C. Click LCMS then Activate Profile and close the dialogue box 3 DO NOT REMOVE D. On the lower right hand corner, double click on the first icon 1. This will bring up a dialogue box giving you a detailed status of the instrument 10. When the instrument is ready to use the icons will turn green. If the icons remain yellow, you may run the experiment. 11. The instrument will need to pump down to a vacuum. Approximately less than 5.0x10-5 Torr (This will take some time) 4 DO NOT REMOVE --------------------------------------------------------------------------------------------------------------------SAMPLE PREPARATION A. B. C. D. Place each sample into an LC-MS Sample vial located in cabinet # Include a sample vial filled with DI water Label the vials Load the samples into the autosampler --------------------------------------------------------------------------------------------------------------------BUILDING A BATCH: A. Select Build Acquisition Batch from the menu located on the left side of the screen B. Sample Tab 1. Type in a Set Name 2. Click Add Set 3. Choose a method from the acquisition list drop down menu a. For Instrumental Analytical Chemistry use the method caffeine DInj 5 DO NOT REMOVE 4. Click method editor to create or edit a method C. Adding Samples 1. Click add samples 2. Sample Name a. Type a prefix in the prefix box and it will be attached to all sample names b. If the sample number box is checked, the program will add numbers at the end of your sample name c. The number of digits will be the number of digits at the end of your sample name 3. Data File a. Type a prefix in the prefix box and it will be attached to all data file names b. Clicking Set Name will add the set name to the data file name c. Sub Folder can be added to store your data 4. New Samples a. Type the number of samples you want to add 5. Click OK 6 DO NOT REMOVE 6. Under vial position, enter the numerical positions of your samples D. Submit Tab 1. Make sure the information is correct 2. Click Submit --------------------------------------------------------------------------------------------------------------------RUNNING AN EXPERIMENT: A. From the View menu select Sample Queue B. From the Acquire menu select Ready C. From the Acquire menu select Start Sample --------------------------------------------------------------------------------------------------------------------DATA COLLECTION: A. From the File menu select Open Data File, select your Set Name and click OK 7 DO NOT REMOVE B. Right click on the screen and select List Data C. Select the Peak List Tab on lower window D. Right Click in the lower window and select TurboChrom Parameters E. Select Bunching Factor 1. Bunching Factor – The number of data points that are grouped to form one bunch point. 2. Ideally this value should be set so there are approximately 20 data points for each peak from start to end 8 DO NOT REMOVE --------------------------------------------------------------------------------------------------------------------INSTRUMENT SHUT-DOWN: A. B. C. D. E. F. G. H. I. J. Remove vials from autosampler and dispose of solutions Select Hardware Configuration → LCMS→ Deactivate Profile Close the Analyst Software Program Close the nitrogen valve on the bench top Close the nitrogen valve in the gas storage room Close the nitrogen cylinder in the gas storage room Check the waste; if full, change the waste container. As a lab assistant if you need help DO NOT TURN OFF THE ROUGHING PUMPS DO NOT TURN OFF THE INSTRUMENT DO NOT TURN OFF THE COMPUTER --------------------------------------------------------------------------------------------------------------------WASTE CONSIDERATIONS FOR INSTRUMENTAL CHEMISTRY COURSE: A. Samples and Standards may be disposed of in the sink --------------------------------------------------------------------------------------------------------------------ALTERNATE INSTRUMENT START-UP: A. B. C. D. E. Open the nitrogen cylinder in the gas storage room Open the nitrogen valve in the gas storage room Open the nitrogen valve on the bench top Turn on the Roughing Pumps Turn on the Mass Spectrometer 1. A large black switch on the back right hand side of the instrument F. The instrument will need to pump down to a vacuum 1. Approximately less than 5.0x10-5 Torr 2. This will take time G. Follow steps starting on page 2 9