SECTION 722 MANHOLES, CATCH BASINS, AND INLETS 722.01 DESCRIPTION This work consists of constructing and adjusting manholes, catch basins, and inlets, including the furnishing or resetting of necessary metal frames, covers or gratings, valve boxes, or other accessories to new lines and grades. 722.02 EQUIPMENT Reserved 722.03 MATERIALS Item Concrete Class AE Precast Reinforced Concrete Pipe Manholes Frames, Tops, Covers, Fittings, and Gratings Reinforcing Steel Section 802 830.01 B or C 834.02 C or D 836.02 A Compose mortar of one part cement to two parts of sand by volume. A maximum of 10 percent of the cement content, by weight, may be replaced with lime. 722.04 CONSTRUCTION REQUIREMENTS A. Precast Reinforced Concrete Pipe Manholes, Inlets, and Catch Basins Use reinforced concrete sewer pipe for this purpose. If this type of construction is used, construct the joints by one of the following methods: 1. Mortar; 2. Rubber Gaskets; or 3. Cold applied preformed plastic gaskets. B. Concrete Construction (Cast-in-Place) Construct cast in place concrete as specified in Section 602 “Concrete Structures.” Finish the concrete surface to present a neat and smooth appearance. Fill honeycomb with cement mortar mixed in the same proportions used in the concrete for the work. C. Concrete Base (Pre-Cast or Cast-in-Place) Shape the invert channel to the true shape of the lower half of the pipe or sewer. Construct the bottom edge of the barrel for manholes, catch basins, and inlets to fit flush on the base. Grout the joint between the base and the barrel with cement mortar. D. Pipe Connections Extend pipe or tile through the walls a sufficient distance to allow for connections. Construct the concrete around the pipe or tile to prevent leakage along their outer surface. Ensure the inside ends are flush with or protrude through the inside walls, and the pipe is the same size and kind as those they connect with on the outside. E. Placing Castings Set castings in full mortar beds. Construct manholes, catch basins, and inlets so that a maximum of 6 inches of precast concrete adjustment rings are needed to set the casting to grade. F. Backfill Place backfill in lifts not exceeding 6 inches loose measurement. Compact the material as specified in Section 203.04 E.2.a “AASHTO T 180.” G. Cleaning Clean all manholes, catch basins, and inlets of accumulations of silt, and deleterious material. H. Adjustments to Existing Units Make adjustments to the structure walls by the use of brick, solid concrete blocks, precast ring, or Class AE concrete so that a seat of proper dimensions may be reconstructed to receive the casting, grating, or cover. If the top of the existing structure is weak and faulty, replace it as directed, and complete the extension. I. Maintenance of Drainage If the existing drainage facilities become inoperable before the new drainage system is functioning, provide sufficient temporary pumping and drainage facilities to keep the roadway drained to the satisfaction of the Engineer. Include the cost of providing sufficient temporary pumping and drainage in the price bid for other items. 722.05 METHOD OF MEASUREMENT The Engineer will measure, completed and in place, as specified in Section 109.01 “Measurement of Quantities” and as follows: A. Catch Basins and Inlet The Engineer will include the base, casting, cover, and gate as part of the catch basin and inlet bid item B. Manholes The Engineer will include the base, casting, cover, and gate as part of the manhole bid item. C. Manhole Risers The Engineer will measure manhole risers from the base to the bottom of the precast cover or the casting. 722.06 BASIS OF PAYMENT Pay Item Manhole___ IN Manhole Tee ___IN × IN Manhole Sanitary Manhole Riser __ IN Inlet – Type __ Adjust Manhole Adjust Inlet Adjust Utility Appurtenance Pay Unit Each Each Each Linear Foot Each Each Each Each Such payment is full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified. Changes noted in Section 722 – Manholes, Catch Basins, and Inlets 722.03 MATERIALS Removed: o “Materials shall meet the following: o “Brick” o Concrete Masonry Units” o “All materials used are subject to approval.” 722.04 CONSTRUCTION REQUIREMENTS 2008 Spec Section A. Excavation is REMOVED 2008 Spec Section B. Brick Masonry Construction is REMOVED Section C. Concrete Base (Pre-Cast or Cast-in-Place) o Removed: “The thickness and other dimensions of the base shall be as specified.” Section D. Pipe Connections o Removed: “The cost of the materials, equipment, and labor to make the connections shall be included in the other items.” 2008 Spec Section H. Reinforcement is REMOVED Section E. Placing Castings o Removed: “Castings shall be set accurately to the correct elevation so no subsequent adjustment is necessary.” Section H. Adjustments to Existing Units o Note that brick was removed from Materials list; should it not be removed here? Section I. Maintenance of Drainage o How do we include the cost of this drainage maintenance when we don’t know if it going to be required? 722.05 METHOD OF MEASUREMENT Removed: o “Excavation, embankment, and disposal of unsuitable or excess materials will not be measured but will be included in Pay Items.” Added: o “The Engineer will measure, completed and in place, as specified in Section 109.01 “Measurement of Quantities” and as follows:” 722.06 BASIS OF PAYMENT Removed: o “Payment will be made at Contract Unit Prices for the following:” o “Catch Basins” o Adjust Catch Basin” Added: o “Manhole Tee ___ IN x IN Each” o “Manhole Sanitary”