GOVERNMENT OF INDIA MINISTRY OF WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION RAJYA SABHA QUESTION NO 2505 ANSWERED ON 15.12.2014 Management plan for Ganga River Basin 2505 Shri Anand Sharma Will the Minister of WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION be pleased to satate :(a) the features of the plan/scheme taken up to clean the iconic river Ganga so far; (b) whether a consortium of IITs has since submitted a management plan for Ganga River Basin; (c) if so, the features of those recommendations; (d) the action taken thereon; (e) the proportion of pollution generated by industrial effluents and domestic effluents respectively in Ganga; and (f) the number of new sewerage networks, treatment plants, river front development schemes and solid waste management systems that have been proposed in the Ganga River Basin, citywise? ANSWER THE MINISTER OF STATE FOR WATER RESOURCES, RIVER DEVELOPMENT AND GANGA REJUVENATION (PROF. SANWAR LAL JAT) (a) The Specific action points have been identified in the Ganga Rejuvenation plan for key thrust areas for restoring wholesomeness of Ganga by ensuring Aviralta, Nirmalta and protection & beautification of river front, conservation of aquatic life and afforestation to restore the liveliness and grandeur of river Ganga. (b) The Ganga River Basin management Plan is yet to be submitted by the consortium of 7 IITs. (c) & (d) Does not arise. (e) As per the information provided by Central Pollution Control Board (CPCB), 501 million litre per day (MLD) of industrial effluents from the grossly polluting industries, and about 3535 MLD of domestic wastewater from 56 Class – I Cities & 31 Class - II towns is being generated. (f) City-wise sewerage networks, treatment plants and river front development schemes taken up under National Ganga River Basin Authority (NGRBA) programme is at Annexure –I. No Solid Waste Management scheme has so far been taken up under NGRBA programme. ****** ANNEXURE Annexure - I Annexure referred to in reply to part (f) of Unstarred Question No. 2505 to be answered in Rajya Sabha on 15.12.2014 City -wise sewerage networks, treatment plants and river front development schemes taken up under National Ganga River Basin Authority Programme Number of Sub-Projects related to Sl. No. State/ Town Sewerage Network Sewerage Treatment Plant 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 River Front Development Uttarakhand 1 2 3 4 5 6 7 8 9 Badrinath Karanprayag Deoprayag Rudraprayag Joshimath Gopeshwar Rishikesh Haridwar Uttarkashi - 10 Muni ki Reti Dhalwala 1 1 - Sub Total 10 8 0 Uttar Pradesh 1 Allahabad 4 4 - 2 Garmukteshwar 1 2 - 3 Moradabad (Ramganga) 1 1 - 4 5 Kannuaj (Kali) Varanasi 1 4 1 1 1 6 Bithoor, Kanpurnagar 1 1 - 7 Narora, Bulandsahar 1 1 - 8 Anup Shahar Sub Total 1 14 2 13 1 1 2 Begusarai Buxar 1 1 1 1 - 3 Hajipur (Gandak) 1 1 - 4 5 Munger Patna Sub Total 1 2 6 1 3 7 1 1 1 1 1 1 0 - - 2 1 1 1 1 1 1 1 1 1 Bihar Jharkhand 1 Sahibganj Sub Total West Bengal 1 2 3 4 5 6 7 8 9 10 Kolkata Bansberia Howrah Serampore Khardah Naihati Chandannagar Baidyabati Rishra Panihati 11 12 13 14 Kamarhati Bally Titagarh Maheshtala - - 1 1 1 1 15 North Barrackpore - - 1 16 Konnagar - - 1 17 Hoogly-Chinsurah - - 1 18 Halisahar 1 1 1 19 Budge-Budge 1 1 1 20 Gayeshpur 1 1 - 21 Uttarpara-Kotrung - - 1 22 23 Kalyani Bhatpara Sub Total Total 1 1 5 36 1 1 5 34 21 23 *****