SITE, SERVICES and INSTALLATION SIGN-OFF with CHECK LIST ARC LIEF 16 Project Details: Project / Equipment name Project Manager School / Centre / Faculty Purchase of Proposed location Site preparation + Installation costs (or estimate) – checklist available Lab Manager contact details *FM contact person consulted (if applicable) *Other contact(s) if applicable State here what equipment is being proposed Building / lab / room no. $ *Refer to end of document for sources of advice and assistance You may not be able to finalise the installation details and budget before the NOI deadline. However you should identify the installation site or site options and prepare a preliminary cost estimate. The NOI review process will include follow-up and assistance where needed in resolving space/installation issues. Full sign-off will be required before the LIEF application can be submitted. Project Manager I confirm that the proposed site is suitable for the equipment and that required services have been identified and budgeted. Name Signature Date Head of School / Centre / Dean of Faculty (as appropriate) I confirm that the space proposed is available for this project and that the costs of installation have been budgeted. Name Signature Date Project Name: Site installation checklist# Proposed location: Building / floor / room no Specialist laboratory / site info A site installation guide been obtained from suppliers? Services review carried out by Specialist services required (add others where needed; provide specifications where applicable) e.g. PC2 lab, clean room, laser lab, magnet lab Yes / No Names of FM contacts, Lab / Operations Manager / other Service Category Service Power 3 phase power 15 amp power Additional power capacity / circuits Other special power (specify) UPS or power conditioning Cooling water Chiller / heat exchanger Close control of airconditioning (temp / humidity / pressure) Aircon to deal with increased heat load Cryogen supply Helium recovery Gas reticulation / specialist gases Gas dryers or other conditioning Ventilation extraction / other Heating/Cooling Speciality gases Environmental Service needed for project Y/N Service available at site Y/N Comments control Floor infrastructure IT General Other Site compatibility issues check Specialist delivery costs not included in purchase contract Delivery access has been confirmed specialist exhaust O2 depletion alarm Other gas alarms HEPA filtered air / other cleanroom PC2 / biosafety cabinet or related Fume cupboard Safety interlocks (eg laser lab) Heavy equipment – floor loading issues Anti-vibration table / other large infrastructure IT cabling / new ports Other IT infrastructure Other water supply (specify) Sink and/or handwash Safety shower and/or eyewash Compressed air Cardax reader, back to base alarm, other security or access control Specify Eg: other WHS measures? Other special services? Equipment causes vibration, electrical or magnetic interference? Equipment is vibration sensitive, sensitive to electromagnetic interference? Other - specify? Crane, specialist removals contractor, scaffolding, other ? Yes / No (Door widths, corridor route, goods lift, forklift access, loading dock access is compatible with equipment dimensions) Services works /additions costed by Attach costings or estimates Any other comments Any other relevant comments Installation budget $ (do not leave blank) # If your project involves a straightforward upgrade (e.g. a new detector on existing equipment) you may feel that the checklist is not necessary. However even in cases of apparently simple purchases or upgrades, it may be that for example, power, IT, or health and safety requirements have changed since the last time similar equipment was purchased. We therefore ask you to check the latest requirements. *Contacts for advice and assistance Division of Research Grainne Moran, MW Analytical Centre, 9385 4642, g.moran@unsw.edu.au Facilities Management Your building CFM Greg Kaplan, Associate Director, Asset Management, FM, 9385 3831, greg.kaplan@unsw.edu.au Strategic Procurement Refer to the Research and Major Equipment section of: http://www.fin.unsw.edu.au/OurServices/FinancialOperations_Procurement_WCH.html School / Faculty advice** Where significant re-allocation of space, re-configuration of existing space, or Faculty-level financial and/or strategic support for refurbishment is required for a major project, please consult your Head of School/Centre and the relevant contact for your Faculty (see list below) Faculty contacts: o Art & Design – Lynn Greenwood o Business School - Research Office at asb.research@unsw.edu.au o Canberra - Suzanna Holmes o Engineering - Emma Bowen o FASS – Parinder Cardosa o FBE – Rob Young o Law – Gemma Nevin o Medicine - David Coomber; Jo-Anne Tee o Science – Gaby Caus