D001 01 003 03 Installing Delta4 General For successful installation of Delta4 some preparatory work must be done. Make sure that the preparations are completed in a timely manner before starting the Delta4 installation to avoid any unwanted delay and downtime during the Delta4 installation. Please complete this form when ready with the preparations and send it back to ScandiDos AB. Prior to an installation Prepare the installation as described in the “Preparatory Work” chapter. Detailed information is found in the Delta4 online help. Please insert the Delta4 installation CD ROM and select “Read Manual”. What What to do Accelerator Treatment Planning System The trig signal is available and correct. An IMRT treatment plan and a four-field plan has been created. The plans have been saved in DICOM RT Plan format. Dose plans have been calculated for the Delta4 phantom using the above treatment plans. The plans have been saved in DICOM RT Dose format (Pinnacle users may use RTOG format alternatively). Treatment plans and dose plans have been copied to a folder accessible by all intended Delta4 computers and users. The Delta4 PC is according to the requirements. An absolute dosimetry system is available (calibrated Farmer chamber with cone shaped tip + field class or reference class electrometer). Computer Absolute Dosimetry Done? Yes No Treatment Planning System(s): Accelerator Elekta Siemens Varian Others ScandiDos AB Uppsala Science Park SE-751 83 Uppsala Sweden Model Tel: +46-18-472 30 30 Fax: +46-18-10 74 02 info@scandidos.se www.scandidos.se D001 01 003 03 During Installation The installation consists out of the following parts: Phase 1: Installation and configuration of Delta4 on one PC Phase 2: Calibration of Delta4 for one accelerator Phase 3: Measurement of a patient specific treatment plan. Resources needed The following resources and equipment are needed during the installation: Resource/Equipment Computer where Delta4 will be installed Accelerator Absolute dosimetry system Local PC administrator Physicist In-house expert: treatment planning system Required during the following phases (see above) 1 2 3 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes - Available? Yes No Yes Yes Yes Yes The complete installation will take about one working day (typically between 12 noon and 10PM) provided that the above equipment and recourses are available and the preparatory work had been carried out successfully. R&V System If the Delta4 system is to be connected with a Treatment control system (Record&Verify System) the following is needed in addition to the above: In-house-expert: R&V + Linac Control System Local Network Administrator 4 hours extra time with full access to the treatment control system Moreover the treatment control system must have been prepared. Please contact us for more information. ScandiDos AB Uppsala Science Park SE-751 83 Uppsala Sweden Tel: +46-18-472 30 30 Fax: +46-18-10 74 02 info@scandidos.se www.scandidos.se D001 01 003 03 Customer information Favoured date for the Delta4 installation/education (please list several alternatives): Customer: Hospital: Address 1: Address 2: Address 3: e-mail, name and phone number of contact person: Space for additional notes: Please contact us if you have any further questions. ScandiDos AB Uppsala Science Park SE-751 83 Uppsala Sweden Tel: +46-18-472 30 30 Fax: +46-18-10 74 02 info@scandidos.se www.scandidos.se