Permit to Work – Excavation Does this permit relate to another permit Yes (Provide details) No Location of Work Description of work Work / excavation Method Depth of excavation Person / Company carrying out work Emergency Contact Mobile Estates Responsible Person Details barriers / notices required Detection methods / equipment (inc ID no.’s) Services Duration of permit Other Checked Comments X High Voltage electricity Medium & low voltage electricity Gas Water IT cables Telecommunications ducts / cables Radio Warwick Drains Storm water Land drains Street lighting Building Management Cables HPHW / Stem services Other (Detail) I confirm that the services highlighted above have been checked and identified as necessary Name Date Permit Cancellation (estates Dept.,) Name Date . In an Emergency, contact 22222 or 024765 22222 Time