5600-PM-BMP0321-7 3/2012 Module 7: Erosion and Sedimentation Controls 7.1 Erosion and Sediment Control Plan a. Describe the measures (channels, berms, ponds, etc.) that will be used to control erosion and sedimentation at each surface site. (Show all facilities on the Operations Map, Module 14) b. Describe the path of runoff leaving the site. (Indicate whether it will flow to a stream, active pit or abandoned pit, and the distance between the site and the discharge point. c. Describe the schedule for constructing new facilities or improving existing facilities. 7.2 Channels and Diversions Complete this section only if channels or diversions will be used. a. Show and label each feature on Operations Map, Module 14. b. Include design criteria, capacity calculations, profile of proposed channel slopes, typical cross sections, required erosion resistant channel linings and applicable details on Module 7.1 Diversion/Collection Ditch Data Sheet for all collection ditches and all dikes (if applicable). 7.3 Haul Roads/Access Roads Provide the following information for each road to be constructed, reconstructed or used in the operation, if common use roads (as defined in 88.1) or public roads are used for access to the site, this section need not be completed: (Note: Activities proposed to be conducted under General Permit for Temporary Road Crossings (BMR-GP-101) and General Permit for Access Road Crossings (BMR-GP-102) must include a completed Notification Form, with attachments, for the respective General Permit (i.e., Form 5600-FM-MR0054 for BMR-GP-101 and Form 5600-FM-MR0059 for BMR-GP-102). BMR-GP-102 may not be used for haul roads.) a. A narrative description of the location; b. The location shown on Operations Map, Module 14 (and Module 13 if road will remain as part of postmining land use); c. A description and typical cross sections which show the construction of the road including existing ground, road widths, surfacing materials, grades, slopes, culverts, bridges, outlet protection and other drainage controls; d. If surface drainage will be discharged to the drainage system of a public road provide a demonstration that the drainages stem of the public road is adequate to handle the additional runoff; e. Measures to control and prevent erosion and sedimentation,; include the proposed spacing of sediment traps, turnouts culverts check dams etc.; f. Plan for reclamation after mining is completed; g. If the road involves the crossing of an intermittent or perennial stream include Module 8; h. Will a PennDOT highway occupancy permit be needed? If yes, provide the permit number prior to permit activation. 7-1 Yes No 5600-PM-BMP0321-7 3/2012 MODULE 7.1 DIVERSION / COLLECTION DITCH DATA SHEET Type Ditch: Mine Operation Name: Company: Surface Mine Permit Number: Prepared by: Telephone Number: Date: Sheet of Channel Cross-Section Type: Station Start End Elevation Drainage Area Design Storm Average Watershed Slope acres (yrs.) (%) Curve Number Channel Lining Peak Discharge Q Channel Bed Slope Freeboard cfs (%) (ft) (specify average rock size) Manning’s Coefficient Channel Bottom Width Channel Side Slopes Flow Area Flow Depth (n) (ft.) L/R (sq.ft.) (ft.) Top Flow Width (ft) Flow Velocity Q Available (ft/sec.) cfs With Freeboard Top Channel Channel Q Depth Width Available (ft.) (ft.) Elevation Stations PROFILE 7-2 Vertical Scale 1” = ____ Horizontal Scale 1” = ____ Cfs