Upper Kotamle hydropower Project Project Description The UKHP is a run of river hydropower project with an installed capacity of 150MW (consisting of two 75MW units) and It will produce 528GWh per year. It has the following components: • A dam located close to the town of Talawakelle with a height of 35.5m and a crest length of 180m. It will have a gross storage of 2.5 MCM with an effective capacity of 0.8 MCM with a surface area of 0.25km2 (60 acres). Full supply level for the reservoir will be 1,194 metres above mean sea level (msl), the minimum operating level will be 1190m msl and the normal tail water level 703m msl. • A headrace tunnel 4.5m/5+.2m in diameter lined and unlined and 12.89km in length, running north from the dam towards the Pundal Oya Falls before turning to the northwest towards the existing Kotmale dam and reservoir. (The maximum gross head between the reservoir and the powerhouse will be 491m). • The flow from the Kotmale Oya will be supplemented with water diverted from other streams. A number of diversion intakes will be built to direct the additional flows to the headrace tunnel. These include two intakes from Devon Oya and Kuda Oya to supply additional flow into the Talawakelle intake dam, and four intakes from Puna Oya, Ramboda Oya and Pundal Oya feeding into the headrace tunnel to the east of the penstock. • An upstream surge tank 12m in diameter and 98m high with a restricted opening, located on the crest of the power house. • The penstock formed by an underground incline shaft starting with a diameter of 4.5m and reducing to 1.45m. It will be 793m in length, consisting of one lane of 745m and two lanes of 48m. • An underground powerhouse located at Niyamgamdora, (2km upstream of the confluence of Puna Oya and Kotmale Oya) with dimensions of 66.3m L x 18.8m W x 36.5m H to house two units of 77,000kW turbines, two vertical axis three phase 88,000kVA generators, two 3phase, transformers and a 220kV Gas Insulator Switchgear (GIS) substation. • An outdoor switchyard, 36.5m wide and 130m long, located at Niyamgamdora, to connect the Power House to a 220kV double circuit transmission line. • 220kV double circuit transmission line of 18km length to transmit power generated to existing Kotmale Substation and the associated switch yard extensions. Project Location The UKHP is located in the Southern Highlands of Sri Lanka and is part of the Nuwara Eliya administrative district. The project area covers some 540km2 of the upstream catchment of the Kotmale Oya, a tributary of the Mahaweli Ganga. The infrastructure for the project is confined to a much smaller area and is contained in a triangle with the A5 Kandy - Nuwara Eliya Road forming the eastern side, the A7 Hatton-Nuwara Eliya road the southern side and a line running north-south from the existing Kotmale power station to the Devon Oya completing the western side. The topography of the project area is mountainous with a striking landscape of deep river valleys running beneath high cliffs and escarpments. The establishment of tea plantations began in the 1850s and today the plantations still cover almost the entire district. The higher slopes and the tops of the hills remain forested with most of the forested areas designated as reserves. The project area is predominantly rural in character with the majority of the population living in small rural communities or on tea plantations. The dam site is located on the edge of the town of Talawakelle which has a population of around 3750. The only other town of any size is Pundal Oya which has a population of 2000. Details of Upper Kotmale Hydropower Project. Progress of Upper Kotmale Hydropower Project as of end of September 2012 Item Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 1 Item 1 2 3 4 Lot 2 Item 0 1 2 3 4 5 Description Preparatory works Main Civil Works Hydro Mechanical Works Electro Mechanical Works Transmission Line Overall Progress of the Project: % Completed 94 98 100 99 100 98 Preparatory works Description B � 412 Road & Access roads Permanent Facilities for Resettles Talawakelle Devsiripura & Kumaragama Rathnilakelle Nanu Oya Middleton Division CGR Quarters UC Resettlement Common Buildings Permanent Facilities for Employers & Engineer Arussella Camp Walkers Camp 33kV Transmission Line Overall Progress of Lot 1: % Completed 100 88 76 100 100 100 100 81 59 100 45 100 94 Main Civil Works Description Site installation and services Intake dam Head pond area Headrace tunnel Upstream surge tank Penstock % Completed 85 99 96 100 98 100 6 7 8 9 Powerhouse complex Tailrace Outdoor switchyard Architectural works Overall Progress of Lot 2: Lot 3 Item 1 2 3 4 5 6 7 8 9 10 11 12 13 Hydro Mechanical Works Description Spillway Gates Spillway Stop log Sand Flush Gate Stop log Sand Flush Main Dam Outlet Main Dam Intake Trash rack & Raking m/c Guide Frame for Intake Access door & Drain Steel Penstock & Lining Draft Tube Gate Tail race Gate Controls & Power supply Overall Progress of Lot 3: Lot 4 Item 1 2 3 4 5 6 7 8 Electro Mechanical Works Description Turbine Generator Overhead Travelling Crane Power Transformer Switchyard Equipment Power Plant Equipment 220kV Cable Telecommunication equipment and flood forecasting system Miscellaneous Equipment Intake Dam equipment Expansion of Kotmale Switchyard Nuwaraeliya grid station Overall Progress of Lot 4: 9 10 11 12 100 100 92 95 98 % Completed 100 100 100 100 100 100 100 100 100 100 100 100 100 100 % Completed 100 100 100 100 100 98 99 97 80 96 100 97 99 Lot 5 Item 1 2 3 Transmission Line Description Design Procurement Construction Overall Progress of Lot 5: % Completed 100 100 100 100