2ed972b0dc09b0e0319e5c90bb66c304

advertisement
CURRICULUM VITAE
NAME
CONTACT:
: PARWEZ ALAM
E-mail
: parwez715@gmail.com
Mobile
: +966-0546147206 (K.S.A)
:
538827961 (K.S.A)
PROFESSIONAL OBJECTIVE:
Seeking a growth oriented challenging career in Quality control and Quality
Assurance with reputed organization by utilizing my technical expertise and
experiences.
EDUCATIONAL PROFILE:
Graduation
: Bachelor of mechanical Engineering
University
: Maharishi dayanand university rohtak(INDIA)
Academic Years
: 2005 to 2009
TECHANICAL QUALIFICATION:
CSWIP 3.1
: CERTIFICATE NO-650648:
: Date of validity: 26 April 2017
ASNT LEVEL-II (American Society of non destructive testing) 2009
VISUAL TESTING
: CERTIFICATE NO-Alpha/vt/0828
ULTRASONIC TESTING
: CERTIFICATE NO-Alpha/Ut/ 0828
PENETRANT TESTING
: CERTIFICATE NO-Alpha/Pt/0828
MAGNETIC PARTICLE TESTING : CERTIFICATE NO-Alpha/Mt/0828
RADIOGRAPHI TESTING
: CERTIFICATE NO-Alpha/Rt/0828
CODES AND STANDARDS FAMILIAR WITH :














API 1104 Cross Country pipelines
ASME Section IX Welding procedure and welders qualification
AWS D1.1 Structural welding.
ASME Section II Part C Specification of Electrodes and Filler Wires.
ASME Section II Part A Specification Of base Metals (Ferrous
Matetials)
ASME Section II Part B Specification Of base Metals(NON Ferrous
Materials)
ASME Section v Non destructive examination
ASME Section VIII Div-1 Manufacturing of Pressure vessel.
ASME Section VIII Div-2 Alternative rules for manufacturing of
pressure vassel.
ASME B31.3 Process Piping
ASME B3 1.4 Liquid petroleum Ttransportation Piping Systems
ASME B31.8 Gas Transmission and distribution Piping Systems
ASME B16.5 Pipe Flanges and Flanged Fittings.
API 6D Specification for Pipe line Valve
WORK EXPERIENCE : 4.6 year (Frome 2009 To 10 Fab 2013)
EXPERIENCE IN INDIA
1. Worked at ESSAR,HAJIRA SURAT
Details Of Project:-
Company/Organisation:-
PAPL PRIVET LTD.
Client company :-
ESSAR
Duration
JAN 2009 to JUNE 2009
Designation:
QA/QC
Worked on the Project:
OXYGEN PLANT HAJIRA SURAT GUJRAT
2. Currently Working at FOCUS ENERGY LTD,JAISALMER(RAJASTHAN)
Details Of Project:-
Company/Organisation:-
FOCUS ENERGY LIMITED
Duration :
JUNE 2009 to till date
Designation:
WELDING INSPECTER
Working on the Project:
Gas processing plant,GAS TURBAIN 6 MW
JAISALMER (rajasthan) INDIA
SUMMARY OF EXPERIENCE:
 Review and approve contectar Quality plane and inspection and test
plane[ITPs].
 Develop and coordinate subproject audit schedule,conduct site
audits within sub –projects and assist quality manager in conduct of
project audits,an needed.
 To implement and help develop activities relating to quality control,
to ensure the capability of organization to meet company
requirements (ISO 9001:2000).
 Review and approve contactor Method of statement.co-ordinate
checking material in accordance with drawing/W.P.S.
DUTIES AND RESPONSIBLITIES AS PLANT PIPING INSPECTOR



















Review of GA and isometric drawing.
Review of piping PQR/WPS Procedures etc.
Visual and Dimensional inspection of material receiving.
Review of MTC as per standard and drawing requirements.
Witness of Positive material identification for alloy steel and
stainless steel.
Witness of joint Fit-up as per Isometric drawing and WPS.
Review of welder qualification for applicable welding process.
Witnes of welding consumable requiement and their backing &
holding requirement.
Wwitness of pre-heating,before,During and After welding as pre
PQR/WPS Requiment.
Review of PWHT Chart and reports.
Witness Hardness test after PWHT.
Review hydro static test package as per line class and specification.
Preparing punch list fore the line.
Witnessing flushing of the line.
Witnessing hydrostatic testing as per the line class and specification.
Witnessing Draining and Drying of line.
Witness Drying of line to achieve dew point temperature of the line
as per specific requirement.
Witness pre- commissioning and nitrogen purging of line.
Review final quality dossier for the project.
DUTIES AND RESPONSIBLITIES IN PIPELINE WELDING :
 Review of GA Drawings.
 Reviewing/Preparation of MRIR as per site requirements after material
receiving inspection.
 Reviewing MTC For material grade, dimensions,mechanical properties
& chemical composition for pipes,fittings and filler material,electrodes
etc.
 Review of pipeline PQR/WPS,Procedures etc.
 Visual and Dimensional inspection of material receiving.
 Review of MTC as per standard and Drawing requirements.
 Joint Fit-up & welding inspection of pipelines.
 Review calibration certificates of instruments and equipments used
during Welding activity and during inspection like pyrometer,welding
machines,baking ovens,holding ovens.
 Witness weld preparations accordance with WPS and drawing.
 Verification of welder qualification as per WPS.
 Welding consumable storage/control and backing requirement as
specified in QC Procedure.
 Witness Joint fit-ups in accordance with WPS/drawing tack weld are to
good workmanship standard and to code standard.
 Witness welding pre heat requirement as per WPS.
 Witness and monitored welding parameters as per WPS like
current,volt,and travel speed.
 Witness of visual inspection after completion of welding and prepare
report for the acceptance/rejection of weld.
 Verification of welder identification on the joint.
 Review of NDT (UT,RT,MPI,LPT,VI) as per specification.
 After weld checking for delay cracking.
COATING OF PIPELINE:
 Inspection of internal cement line coating and external
P.E Coating.
 Inspection of field joint coating afterweld joint both inside and
outside of trench after/before pipe laying.







Inspects all paint material & blasting materials and ensure compliance
with the requirements of international standards & company painting
specification.
Witness & review/inspection/tests documentation/reports related to
painting inspection are carried out according to company painting
specification & international standards.
Knowledge of work permits & regular checking of safety procedures
of the work.
Using comparators for blasted surface.
Using comb gauge and eccentric wheel for wet film thikness.
Holiday pin hole detection test of coating of pipes.
Using peel-of-test for checking the strength of coating.
NDT ACTIVITIES


Interpreting the radiographic films according to ASME ANSI B 31.3
and ASME section V for process piping of refinery construction.
Review and approval of the MPI reports.


Witnessing Magnetic test according to specifications.
Witnessing Ultrasonic test of wall thickness for hot tap tie-in pipe
surface area.
OTHER WORK EXPERIENCE
 Reviewing the spool,releasing check sheet and mobilizing to site
after approval,
 Review final packages for hydrostatic test.
 Checking the punch list items as per P &ID and isometric such as pipe
supports Valves guides,shoe supports and NDT completion.
 Bulk material take-off from P & ID & GA ,Monitoring construction
progress and reporting P & ID ,Isometrics, piping GA , Plans & layouts
drawings interpretation,construction & Maintenance procedures,
field view (locate piping) MS office,
PERSONAL & PASSPORT DETAILS:
Nationality
: Indian
Date of birth
: 1st September 1987
Marital status
: single
Passport no
: H6559840
DRIVING LICENCE NO
: DL-032010012397
PLACE
: JUBAIL (K.S.A)
DATE
:28/05/2013
Download