OASIS Scotland: Seventeenth six monthly report: 28 April 2015 OASIS was formally adopted for implementation by ALGAO (Scotland) from 1st April 2007. The statistics presented below represent usage in Scotland up to 23 April 2015. Work days Waiting for contractor to complete Waiting for contractor to send report Contractor to complete archive section Waiting for HER to validate Waiting for RCAHMS to validate Signed off & complete 23/04/15 139 587 (+4) 160 (0) 8 (-1) 13/10/14 117 583 (+101) 482 (+10) 472 (+28) 160 (-29) 9 (-1) 190 (+92) 98 (+74) 209 (+31) 9 (0) 579 (+65) 514 (26) 540 (+81) 451 (+19) 2456 (+190) 2266 (+168) 2098 (+190) 1908 (+187) Date 189 (-20) 10 (+1) Misc. 2.56 10 (+3) 2.51 7 (+7) 1.9 0 Total 3993 (+356) 3637 (+294) 3343 (+288) 3055 (+175) 2/05/14 151 4/10/13 124 16/04/13 131 444 (-38) 178 (27) 9(+4) 432 (51) 80 (-204) 1721 (+533) 2.13 16 (+16) 2880 (+287) 15/10/12 129 482 (+32) 151 (+25) 5 (-2) 284 (+97) 0 (-3) 128 450 (+51) 126 (+29) 7 (-6) 1188 (+18) 1170 (-3) 1.98 18/04/12 2.39 3(+1) 24/10/11 130 399 (+57) 97(-10) 13(+4) 483 (+86) 397 (+87) 310(-9) 35(-81) 1173(+276) 1.81 2(-1) 26/04/11 129 342 (-18) 107 (-2) 9 (+1) 319 (+102) 116 (+88) 897 (+147) 2593 (+253) 2340 (+311) 2029 (+236) 1793 (+316) 28/10/10 138 360 (+115) 109 (-5) 8 (+3) 28 (-122) 750 (+249) 20/04/10 136 245 (+37) 114 (+8) 5 (0) 125 208 (+58) 106 (+13) 5 (-1) 150 (+150) 0 (-40) 501 (+25) 13/10/09 21/04/09 108 150 (+12) 93 (+3) 6 (+1) 40 (-6) 336 (+103) 3/12/08 160 138 (+51) 90 (+69) 47 (+46) 233 (+123) 13/04/08 136 87 (+30) 21 (+5) - 1 (-2) 110 (+59) 22/10/07 121 57 (+41) 16 (+15) - 217 (+18) 199 (+16) 183 (+34) 149 (+10) 139 (+75) 64 (+34) 30 (+26) 3 (-4) 51 (+46) 23/04/07 16 16 5 1 - 24 (+24) Number of new records in system per day 0 (-80) 4 187 (152) 1.43 6 (10) 476 (+140) 7 5 2.45 3 (2) (Adj. 1.65) 1.85 5 (-2) 1477 (+256) 1.74 7 1221 (+1) (+237) 1.65 6 984 (+6) (+210) 1.13 0 774 (+122) 2.24 0 (652 10) (+359) 1 10 293 (+10) (+136) 0.97 0 (-6) 157 (+118) 2.43 6 39 Table 1 Status of records within OASIS 1 23 April 2015 Waiting for contractor to complete Waiting for contractor to send report Contractor to complete archive section Waiting for HER to validate Miscellaneous (HER) Waiting for RCAHMS to validate Miscellaneous (HER) 587 (+4) 160 (no change) 8 (-1) 579 (+65) 10 (+3) 190 (+92) 10 (+3) Signed off & complete Percentage signed off 2459 (+193) 61.58% Number of additional records in system per day TOTAL 2.56 (+0.02) 3993 (+356) Over the winter a further 356 projects were added to OASIS. This continues the growth observed over the last reporting period: averaging 2.56 reports per day compared to the mean of 1.83 observed over the history of usage in Scotland. There are now 3993 records in OASIS. The proportion of records at different stages in the work flow remains constant with minor fluctuations for the number of records at each stage of the process. Continuing the slightly downward trend from previous reports, 18.91% of projects are live with contractors (compared with 20.7% for the previous reporting period), 14.75% with the relevant HER and 4.76 require validation by RCAHMS (figure 1) whilst 61.58% (as opposed to 62.4% for the preceding period) of projects have been completed. 70 60 50 40 30 20 10 0 Records with contractor Records with SMR/HER Records with NMRS Signed off Figure 1. Proportion of records at different stages of the workflow The proportion of live records remains constant with 49.22% of the records with the contractor, 38.4% with the HERs and 12.4% awaiting validation by RCAHMS compared to 54.82%, 38% 7.15% split from the preceding reporting period. 2 Historic Environment Record validation There has been a marginal increase in the proportion of records requiring HER validation to 14.75% from 14.3% (adjusted from last 14.1%). Generally there is good information flow from the contractors through the HERs although there are notable exceptions where a backlog in validating records has built (figure 2 and table 2). This is causing concern with those submitting their records as it delays the release of the reports through the ArchSearch grey literature library. Historic Environment Record Validation 0 Aberdeenshire, Angus and Moray Aberdeen City Dundee Edinburgh Dumfries and Galloway E Dunbarton E Lothian, Midlothian Falkirk Fife Highland North Lanarkshire Orkney Perth and Kinross Scottish Borders Shetland Stirling Western Isles WoSAS With Contractor 100 200 300 400 500 600 700 800 900 12 19 1 21 11 4 51 13 4 270 17 1 5 47 7 2 40 59 To be validated by HER With RCAHMS or signed off Figure 2. Validation progress by HER There is now no HER service for Inverclyde Council. 3 With Contractor Awaiting RCAHMS validation Signed off % signed off by HER 571 239 19 497 55 10 3 92 12 19 1 21 504 210 15 103 102 12 0 37 402 198 15 66 97.67 91.70 93.75 25.43 Dumfries and Galloway E Dunbarton 123 28 28 7 11 4 84 17 0 0 84 17 88.42 80.95 E Lothian, Midlothian Falkirk Fife Highland 312 35 96 442 36 7 15 107 51 13 4 270 223 14 77 84 4 0 2 0 219 14 75 84 80.80 50.00 95.06 25.07 North Lanarkshire Orkney 25 72 6 41 17 1 1 28 0 0 1 28 5.26 90.32 266 17 5 244 0 244 97.99 230 21 104 93 819 3992 33 14 24 39 167 701 47 7 2 40 59 458 150 0 80 14 541 2389 Perth and Kinross Scottish Borders Shetland Stirling Western Isles WoSAS Scotland Outside HER stage (with contractor, RCAHMS or signed off) To be validated By HER No of records Aberdeenshire, Angus and Moray Aberdeen City Dundee Edinburgh 3 147 76.14 0 0 0.00 1 79 100.00 0 14 25.93 29 512 82.98 190 2199 72.59 Table 2. number of projects at each stage of OASIS by HER 4 Table 2 presents the numbers of projects at each stage of the OASIS workflow by HER. The table highlights the percentages of record validated by each HER. The figures have been adjusted from previous reporting periods to exclude projects which have not been submitted by contractors. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% Aberdeenshire, Angus and Moray Aberdeen City Dundee Edinburgh Dumfries and Galloway E Dunbarton E Lothian, Midlothian Falkirk Fife Highland North Lanarkshire Orkney Perth and Kinross Scottish Borders Shetland Stirling Western Isles WoSAS Scotland With Contractor To be validated by HER Awaiting RCAHMS validation Signed off Figure 3:the proportion of records at each stage of the OASIS workflow Figure 3 shows the proportion of records at each stage of the OASIS workflow. There is a disproportionate emphasis on those HERs where there have been a small number of projects reported. Generally RCAHMS validation is keeping pace with the validation from the HERs although there is currently a spike in records awaiting validation (reflecting the large number of records validated by the HERs during April 2015 (Figur4 4). 5 100% 250 200 150 100 50 0 Awaiting RCAHMS validation Figure 4 OASIS records awaiting validation by RCAHMS by month Grey literature submissions File transfers by OASIS 23 April 2015 Reports not yet registered Reports sent by other means Reports attached to OASIS form Number of OASIS records signed-off 592 433 2968 2456 14th Oct 2014 572 414 2655 2266 2nd May 2014 574 390 2379 2098 Table 3: Number of Grey literature reports submitted via OASIS. The figures provided in table 3 include reports working their way through the system but have not necessarily been signed-off yet. Training and new users An information session was held at Guard Archaeology but otherwise there has been no training undertaken during the period. Including curators, there are now 96 registered users for OASIS in Scotland – an increase of 9 from the previous reporting period. At least two of the new users (from academia and the National Museums Scotland) have registered so that they could submit applications through the radiocarbon database. 6