2014 Annual Report Office of General Services Capital Improvements: Upper Vliet Street storm water separation project completed - installed six new structures retro fitted three others, curb replacement, milling and pavement of street Storm sewers install upper section of Western Ave. Sewer repair and road realignment - Chestnut Street Restoration work throughout areas where storm water separation project was installed Road reconstruction and pavement replacement - Johnston Ave. Restoration work to repair damage from deep freeze - Music Hall, Library and Senior Center Sanitary and storm water improvements upper Manor Ave area Building Projects Library – Boiler installation New fencing installed along river bank - VSI VSI Pond – Continuing landscaping improvements Lansing’s Park – spray ground equipment repairs Completed work on safety inspection in all City Playgrounds Placement of safety matting in various city parks Major repairs to water intake North Mohawk Street and Water filtration plant Other Accomplishments: Milling and paving of various City streets (over a dozen) City-wide spring and electronic waste cleanup/Hazardous waste collection Water Valves and Fire Hydrants replaced City wide Dangerous trees and stump removed throughout the City Catch basin cleaning and replacement/repairs City-wide (over 200 total) Leak detection Street striping/crosswalks and signage installations Continued operating and upgrades Lansings Pool Community involvement Easter egg Hunt Christmas at Silliman Park City Wide Beautification Program Memorial Day Parade Community Service Day Concerts at Canal Square Cohoes Boxing Club Farmers Market National Night Out / Neighborhood Watch Activities Mastodon 5k/10k run Turkey trot