ANTICIPATED ROAD BUILDERS QUANTITIES
DRAFT PS&E - Final
Management Consultant is to forward completed form to Sandra Villiesse, before plan review meeting.
Draft PS&E Review Meeting on: {Date}
Project Manager Lynn Saeger, PE – WisDOT NC Region
Construction I.D.: {I.D.}
Team Leader: Greg Wolfe, PE – NC Region LPMC
Highway/Street: {Hwy./St}
Program:
Section:
Const. Type:
Resurfacing
to
Expansion
County: {county}
Pavement Replacement
Bridge Rehabilitation
Est. (cont. only): $
Reconditioning
Bridge Replacement
Schedule Letting Date:
Reconstruction
Asphalt
Concrete
C.Y.
Base Course
Bridge
TON
Includes all gravel or crushed aggregate base course including all opengraded base courses, breaker run stone and all truck-hauled pavement
material recycled as base course.
Includes square yards of milling items for: removing pavement (concrete), butt
joints; removing asphaltic surface, milling; removing asphaltic surface, butt
joints; salvaged asphaltic pavement, milling; mill and relay asphaltic pavement,
and pulverize and relay existing asphaltic pavement
S.Y.
Traffic Striping
Includes all excavation including common, rock, marsh, borrow, etc.
Includes all concrete deck area for bridge deck replacement, superstructure
replacement, and bridge deck overlays. Does not include box culverts,
multiple pipe installations numbered as a bridge, or bridge painting projects.
S.F.
Diamond Grinding
Rubblizing
Includes street/road pavements including full-depth concrete patching, gaps,
and concrete base course. Does not include sidewalks, driveways, curb and
gutter, diamond grinding, etc.
S.Y.
Excavation
Milling
Includes all plant and road mixes including recycled and experimental mixes.
Does not include asphaltic materials (oil) or other additives.
TON
S.Y.
L.F.
S.Y.
Includes square yards of continuous diamond grinding.
Includes lineal feet of permanent and temporary pavement marking for lane
lines, edge lines, and centerlines. Does not include pavement marking for
incidental items such as crosswalks, stop lines, curbs, arrows, etc.
Includes square yards of rubblizing existing concrete pavement.