ANTICIPATED ROAD BUILDERS QUANTITIES DRAFT PS&E - Final Management Consultant is to forward completed form to Sandra Villiesse, before plan review meeting. Draft PS&E Review Meeting on: {Date} Project Manager Lynn Saeger, PE – WisDOT NC Region Construction I.D.: {I.D.} Team Leader: Greg Wolfe, PE – NC Region LPMC Highway/Street: {Hwy./St} Program: Section: Const. Type: Resurfacing to Expansion County: {county} Pavement Replacement Bridge Rehabilitation Est. (cont. only): $ Reconditioning Bridge Replacement Schedule Letting Date: Reconstruction Asphalt Concrete C.Y. Base Course Bridge TON Includes all gravel or crushed aggregate base course including all opengraded base courses, breaker run stone and all truck-hauled pavement material recycled as base course. Includes square yards of milling items for: removing pavement (concrete), butt joints; removing asphaltic surface, milling; removing asphaltic surface, butt joints; salvaged asphaltic pavement, milling; mill and relay asphaltic pavement, and pulverize and relay existing asphaltic pavement S.Y. Traffic Striping Includes all excavation including common, rock, marsh, borrow, etc. Includes all concrete deck area for bridge deck replacement, superstructure replacement, and bridge deck overlays. Does not include box culverts, multiple pipe installations numbered as a bridge, or bridge painting projects. S.F. Diamond Grinding Rubblizing Includes street/road pavements including full-depth concrete patching, gaps, and concrete base course. Does not include sidewalks, driveways, curb and gutter, diamond grinding, etc. S.Y. Excavation Milling Includes all plant and road mixes including recycled and experimental mixes. Does not include asphaltic materials (oil) or other additives. TON S.Y. L.F. S.Y. Includes square yards of continuous diamond grinding. Includes lineal feet of permanent and temporary pavement marking for lane lines, edge lines, and centerlines. Does not include pavement marking for incidental items such as crosswalks, stop lines, curbs, arrows, etc. Includes square yards of rubblizing existing concrete pavement.