Tender for Horticulture works in the Embassy Bungalows

advertisement
Embassy of India
Kathmandu
NOTICE INVITING BIDS
Embassy of India invites sealed and separate tenders under two bid
system (Technical and Financial Bid) from established/reputed
companies/contractors for Horticulture
works in the Bungalows
(B2,B3,B4)(Total-19), area near & in between Residential flats (AP1,AP2, AP3)
in the Embassy of India Complex.
2.
The detailed scope of work, details of site visit, evaluation criteria
and other relevant information in this regard may be downloaded from
www.indianembassy.org.np and eprocure.gov.in or collected from Sh.
S.Sunderrajan, JE(Civil), Ph. 01-4410900 ext. 4280. The financial bid will be
opened only for such companies/contractors who will succeed on the basis of
Technical bid.
3.
Last date for receipt of sealed bids will be 17.00 hrs. on 10 September
2015.
4.
The Embassy of India reserves the right to reject/cancel any or all bids
without assigning any reason.
Sd/(Head of Chancery)
SCOPE OF WORK
1. The Contractor is required to follow the latest relevant standards and
codes for Horticulture works, and as issued by the Government of Nepal
and/or Kathmandu Municipality. All work shall be done as per sound
engineering practice and as directed by the JE(Civil), Embassy
Gardener and confirmed by the Employer.
2. Earthwork shall include:
a. Clearance and disposal of all debris on site
b. Ground preparation for grassing with dibbling of roots of specified
species of grass (Selection No. 1) including watering and
maintenance of the lawn till the grass forms a thick carpet free of
weeds and fit for mowing. All finished work shall meet approval of
the JE(Civil), Embassy Gardener .
c. Preparation of soil by excavating, refilling the excavated earth after
breaking clods and mixing with manure in the ratio 2:1 and mixing
of soil improvement, nutrients
d. Supplying stacking and mixing of screened farm-yard manure on
site
e. Supplying, stacking and mixing fertilizers at site
f. Supplying, stacking & treating the earth with insecticides, pesticides
& weedicides at site, including royalty & carriage as per specification
3. Mandatory Maintenance for a period of one year shall include:
a. The maintenance period shall be 12 months from the date of
completion of landscaping work. The work shall not be considered
as completed satisfactorily and maintained until the Embassy
certifies in writing that they have been completed satisfactory and
maintained properly every month.
b. The maintenance shall mean and include watering, weeding,
mowing lawns/ grass, sweeping, disposal of materials, supplying
and application of decomposed farm yard manure, and organic
insecticides, pesticides, etc. It also means and includes replacement
of damaged/ withered area of lawn with new first quality grass.
c. All necessary tools like, but not restricted to, hose-pipes, hydrants,
sprinklers, Horticulture maintenance tools (including safety shoes),
will be provided by the Contractor as per requirement, at his own
cost.
4. The Contractor shall make his own transportation arrangements for all
the required materials to site of works, as well as disposal of any waste
material, complete to the satisfaction of the Employer and Architect/
Engineer-in-charge.
5. The Contractor shall employ, in consultation with the Embassy, only
those persons who are physically, medically and mentally fit and whose
antecedents have been verified and cleared.
6. The workers engaged by the Contractor will be the employees of the
Contractor and the Embassy will not, in any way, be responsible for any
liability/compensation on account of accident, injury or death of
workers while performing their work inside the Embassy campus.
7.
The bids should be strictly in accordance with minimum wages fixed by
Government of Nepal. The financial bid will be opened only for such
companies which succeeds on the basis of pre-qualification/evaluation
criteria(attached)
8. PAYMENT SCHEDULE :
The stages of payment to the Contractor shall be as under:
Stage Item of work as per the abovePayment to be
mentioned scope of works
released to the
Contractor (% of total
contract value)
1
After delivery of all requisite
30%
materials at site
2
After completion of works in all
50%
respects
3
After successful completion of
20%
mandatory maintenance period of 12
months from the date of completion
of works
TOTAL
100%
9. GENERAL INSTRUCTIONS :
(i)
The work is to be completed in all respects within two months from
the date of award of work. The scope of work shall include all allied
works such as earthwork, supply of grass etc. and mandatory
maintenance for one year from the date of completion of work.
(ii)
The Bidders should, along with their quotation, submit all relevant
up-to-date details regarding their experience, list of works, turnover,
client certificates, registration with concerned Authorities, etc. All
documents relating to the Bid shall be in English language.
(iii)
The Bid for the work shall be for supply of grass along with all allied
earth works and mandatory maintenance for one year. The Bid shall
be inclusive of all transportation costs all admissible taxes, levies &
VAT, etc. and nothing extra shall be paid over and above his
accepted quoted amount. The terms of payment indicated by the
Bidder are subject to negotiation, if his bid is accepted.
(iv)
The date of submission shall be final and no requests for extension
in the date will be entertained. Bid can be submitted by hand or by
post. If the Bid is sent by post, the Embassy will not be responsible
for delay/ loss in postal transit. Bids received after due date & time
shall not be accepted.
(v)
Bid shall be opened in Embassy of India, Kathmandu, on 11
September, 2015 at 1530 hrs before the duly constituted committee.
The Bidder or his authorized representative may remain present
during the opening of Bids.
(vi)
The Embassy of India reserves the right to reject any/all Bids, wholly
or in part without assigning any reason whatsoever.
NOTE: The approximate area for grassing for B2, B3, B4 Bungalows
(Total-19) and area near and in between is enclosed as per annexure.
The measurement is in sq. ft. However the payment will be made
after measurement of actual work done by the contractor.
Pre-Qualification/Evaluation/Exclusion Criteria
Sl
1
Particulars
Experience
Details
Evaluation Marks
(a) The contractor should have experience 02
of minimum five years in such type of
work.
02
(b) Preference will be given to those
contractors which has experience in 01
working with Diplomatic Missions/Govt.
Departments/Hotels
(c ) working experience with the Indian
Embassy
2
PAN
The contractor should have a valid PAN 01
No./Registration
number
and Registration
Number.
No.
Documentary proof is to be attached.
3
Minimum Wages
The
contractor
will
provide 01
Certificate/undertaking that he will pay
not less than minimum wages fixed by
GON
4
Turnover
The contractor should have a minimum 02
turnover of NRs. 6 lakhs or more per year
(copies of last three years turnover
documentary proof is required)
5
VAT
Certificate that they pays VAT regularly
01
and their VAT dues are cleared
NOTE : Unprecedented situation : If after opening of financial bids it is found that there
are more than one lowest bidders, in that case preference will be given to those
contractors which scores more evaluation marks in the technical bids
Minimum 70% examination mark is required to shortlist the firms for opening of financial
bids.
Annexure
Embassy of India
Kathmandu
Civil Engineering Maintenance Section
Sub: Horticulture work-Detailed Measurements-reg:
AP-2-27
Road side grass-87’6”X 46’6”=4068.75 sq.feet
AP-2-27-back- 67’X31’6” = 2110.50 sq.feet
AP-2-33 back- 33’X 13’ =
429.00 sq.feet
Between AP-1 & AP-2
AP-1-34 Side gap 74’X7’6”=
555.00
Deduct floor
22’6”x3’3”= (-)73.13
Add grass area 20’9’’x9’3’’=191.94
Ap-1-34 to Ap-1-3182’6’’x23’=
1897.50
92’6’’x16’3’’ =
1503.13
Deduct 16’3’’x5’ =
(-)81.25
89’3’’x29’
=
2588.25
RG-Bungalow
Minister-back side building
1x2 x40’x22’6’’ =
1800.00
Deduct chamber=1x2x5’6’’x5’ (-)55.00
Front side 1x2x33’6’’x17’= 1139.00
Deduct 1x2x 3’9’’x3’9’’=
(-)28.13
Rg-Bungalow-I
Back side-1x8x36’x(15’9’’+13’3’’+10’6’’/3)=3792.00
Deduct chambers 1x8 x3’6’’x3’6’’ = (-) 98.00
Add steps 1x8x 4’x4’
=128.00
RG-II
Back side 1x9 x 36’9’’x19’ =
6284.25
Total in square feet =
26151.81 or
Total in square meter =
2429.56