AbdulKadir Shaikh 91 9833795090 Email- akshaikh74@yahoo.com Address – Mumbai (Thane)-401107 India Summary: To give in and contribute the skills and education that I have acquired in Quality Inspection in Painting, Coating, HSS, and Piping Post Applied – Painting and coating inspector Educational Qualifications: Diploma in Mechanical Engineering Certification & Technical Skill: BGAS-cswip Level / Grade 2 and 3 http://www.cswip.com/verification ASNT LEVEL II – NDT: Magnetic particle Inspection (MPI) Liquid Penetrant Testing (LPT) Ultrasound Testing (UT) Radiographic Test (RT) Computer Programming Skills: DIPLOMA IN COMPUTER MANAGEMENT (INSTITUTE “DATAPRO INFORMATION TECHNOLOGY”) Office Package: Microsoft Word, Microsoft Excel, Microsoft Access, Microsoft PowerPoint and Microsoft Outlook Express Operating Systems: Windows9X, Windows2000, Windows ME, Windows XP, Windows Vista, Linux, UNIX, MS DOS Adobe In Design / Adobe Reader / Adobe Editor Professional Background Since 1996 working as in quality control Department in KSA and UAE and is responsible for handling and performing various tasks and duties in various projects like: Name of the company/Country: ROTARY ARABIA LTD (KSA) Position Held: QC Inspector – Painting /coating Period : July – 2012 to May-2013 Project : SATROP (Saudi Aramco& Total Refinery project) Project : SHOAIBAII CCPP (Saudi Electricity Company) (STORAGE TANKS) Name of the company/Country: SUNGCHANG Engg. Const. Ltd (U.A.E) Position Held: QC Inspector – Painting / Coating & Piping Period : Sept-2011 to Dec - 2011 Project : Ruwais Refinery Expansion project – Package # 3, (Offsite & Utilities) (RRE) Job Responsibilities: HSS / WRAPPING • After blasting check the required testing • • • Monitoring Temperature • • • Check HSS sleeve around the weld joint, overlapping Quality check after sleeve installation o Visual, Non-Destructive & Destructive Test HSS peel of test or window test Holiday Test Documentation on daily basis, RFI, HSS, Epoxy etc. Painting Inspection • • • • • • • • • • • Inspection for holiday test Verifies all equipment’s where Blasting/Painting were necessary to be masked Monitor degreasing and high pressure fresh water wash to be carried out. Verifies weld spatter and all surfaces irregularities to be removed. Chloride Test to be carried out as per Standard (When required). Compressed air used for abrasive blasting to be checked as per Standard. Monitor size, shape, dryness and cleanliness of the abrasive. Abrasive conductivity test to be carried out as per Standard (When required). Monitor air pressure and nozzle size of blasting equipment. Ambient condition and substrate temperature to be observed in every two hrs intervals. Surface cleanliness to be verified using Standard. The surface to be blasted should be free from grease, oil and other contaminants. • • • • • • • • • • • • • • • • • • • • • • • • • Anchor profile to be checked as per client’s requirement and SPCS. Monitor blow down of spent abrasives and materials. Dust contamination test has been carried out as per Standard (If required). Monitor mixing and thinning of the paint. Monitor the coating application and wet film thickness. Monitor and ensure over coating intervals between each coat of paint. Check the paint drum (manufacture, paint name, batch number, batch certificate, expiry date etc…). Monitor and ensure the paint materials are storage in good condition. Verify after coating the required dry film thickness. Check coating curing test as per standard (When required). Monitor performance of Blaster and Painter at site. Raises NCR’s for non-conforming products. Raising punch lists for incomplete works. Check Holiday/Pinhole and Adhesion test (When applicable). Check calibration of the equipment. Ensure that necessary inspections are carried out as per the applicable specification. Check that adequate and proper repair of all defects has been undertaken. Check paint/coating colour, appearances, and shade uniformity. Preparation of Inspection reports and Test reports. Inspector responsible is monitoring and checking the Blasting and Painting activities (prior/after) to ensure that the quality of workmanship is in accordance with the client’s specification, painting and blasting procedure and the SPCS. Ensuring all measuring and testing equipment are duly calibrated Monitoring environmental condition as per specification (DEW, Related Humidity) Inspection on blasted and painted surfaces (cleanliness, surface profile, salt contamination, DFT, Painted surface finish ) Ensuring the spool identification are transferred correctly Ensuring only approved and accepted painting & blasting materials are used Name of Company / Country: AL-SUWAIDI Co. Ltd ,Jubail, K.S.A Position Held: QC Inspector – Painting-coating / Piping Joining Period: May-2007 To Nov 2009 Project : SAUDI KAYAN (Polycarbonate) (DAELIM) Name of the company/Country: LAHOUD ENGINEERING (U.A.E) Position Held: QC Inspector - Piping Period : March – 2006 To February 2007 Project : Jebel-Ali power plant (Extension) Name of the company/Country: SARCO (Archirodon) LTD. ( K.S.A ) Position Held: QC Inspector - Piping Period: June – 2003 To November 2006 Project: Shoaiba Power Plant (K.S.A) Project: Yansab (construction of petrochemical plant) K.S.A Job Responsibilities: • • • • • • • • • • • • To review the structural & piping drawings and preparing of As-Built isometrics , weld map , supports Carry out Fit-up, during welding and final Inspection Coordinating with clients , regarding changes that occurs on the design on construction drawings and reflects the changes on As-built Documents preparation and compile acceptance reports. To follow the renewal and repair work carried out To review the structural & piping drawings Prepare and update the inspection and testing plans (ITP’s) of various activities. Various locations apply the inspection and maintain the documents. Carry out Fit-up, pneumatic testing (leak test) As per testing procedure pneumatic/leak test inspection. Follow up the Applicable standards. Preparing formats of reports’ pipe supports, weld map, as build-isometrics as per requirement Documentation on daily basis, RFI, HSS, Epoxy etc. Scheduling for testing of various NDT, Qualification of welders & Procedures (WQT, PQR) Name of Company / Country: Saudi Techint Ltd. (K.S.A) Saipem/ Techint Ltd. Joint venture ( K.S.A ) Position Held: QA/QC coordinator / Inspector / contract Administrator Period: August-1996 TO February-2003 Project - 1 : Yanbu Medina Water Transmission System. (YMWTS ) Phase –II Project - 2 : Shaybah to Abqaiq Pipeline (SHABAB-1) Project - 3 : Hawiyah Gas Development Pipeline (HGDP) Project - 4 : Hawiyah Gas Plant (Hawiyah Inlet and Auxiliary Facilities) (HIAF) Job Responsibilities: Familiar with API-1104, ASME and General QC procedures. Coordination with sub-contractors’ whom we hire for the Civil, Mechanical & Electrical activity and to corresponds them with fax or telephone Scheduling for testing of various NDT, Qualification of welders & Procedures (WQT, PQR) Coordinating with QC Inspectors checking visual report on daily basis. Preparing formats of reports’, pipe supports, weld map, as build-isometrics as per requirement Coordinating with NDT Crew GOV & MOV valves calibration and installation on various sites Arranging gate pass & work permit, vehicles for QC inspection and Hydro-test Maintaining safety guideline to QC Inspector, coordinating with safety officer to ensure safety on site Taking corrective measures & try to eliminate recurring problems Preparing progress report on daily basis. Handling invoices of subcontractors, updating them individually in excel file, coordinating with Site Supervisor, Accounts Dept, Cost Control Dept for clearing invoices with their approved contract documents (for NDT). Preparing memorandum/letters, correspondence (client’s & subcontractors) Arranging project meetings Scheduling them and preparing minutes of meeting, sending them to Aramco Clients and various department In regards, completion of work, arranging meeting with the subcontractors, attending meeting with sub-con and discussing related to the work/contract with the Manager. Preparing hydro-test packages with the coordination of management & engineering dept. preparing the monthly general status of Subcontracts etc. Preparing of As-built isometric drawing Monitoring and controlling of QC activities of sub- contractors Training requirement of QC inspectors as requirement Assisting in Mobilization and demobilization Coordinating with construction in resolving NCR and monitoring corrective action Assisting for in coordination with construction group representative, third party agency to perform inspection in line with the requirement of approve inspection test plan & checklist Coordination with Sub-contracts on various testing Passport Number: G 5010782 Issued Place : Date of Issue: 22-08-2007 Date of Expiry : Driving License: Indian (valid) Mumbai – India 21-08-2017