Modular Classroom Relocation Prep Sheet
Instructions (Important): In preparation for the relocation of your modular classroom(s), and the funding
required to deliver, place and set up the classroom(s), please provide your regional representative with the
following information for each modular classroom(s) that is to be relocated:
Basic Information:
Name of School Board:
Name of School Board Contact:
School Board Contact Phone No:
School Board Contact email
address:
Name and address of Donor
School:
Name and address of Receiver
School:
Approximate Distance between
Schools (km)
# and Type of relocatable
classrooms to be moved:
(modular/portable)
Attaching to existing modulars on
site: (Y/N)
Is a connecting link required (Y/N)
Intended contracting method:
(Public tender or Own Forces)
Site Plan:
A site plan, fully dimensioned, of the entire site showing receiving school, the location and orientation of the
modular classrooms, connecting link (if required) and site access points. The site plan should identify the type
of modular classrooms (A-Unit Type/Orientation and/or B-Unit).
The site plan will need to indicate a description of the topography of the site and the elevation to which the
modular classrooms will be set, as well as any underground utilities that may be impacted by the placement of
the modular classrooms. This information will determine the method of placement of the modular classrooms
when they are delivered to the site.
Cost Estimate:
A) Delivery Costs (A site visit is required, prior to delivery, to determine “other” delivery costs):
Cost of transport from donor school site to
receiving school site(km x $/km):
$
Other costs (jack rollering, crane costs, etc., if applicable):
$
Total Delivery Costs:
$
b) Removal Costs (Donor School):
Utility disconnection:
Mechanical:
Electrical:
Other (fire alarm, etc.):
$
$
$
Site reclamation Costs:
Removal of foundations/piles:
Removal of Stairs:
Removal of Skirting:
Landscaping:
$
$
$
$
Total Removal Costs:
$
$
$
$
$
Total Site Preparation Costs:
$
$
$
$
Total Utility Hook up Costs:
$
c) Site Preparation Costs (Receiver School):
Foundation/Pile installation:
Landscaping:
Skirting:
Stairs:
d) Utility Hook up Costs (Receiver School):
Mechanical:
Electrical:
Other (fire alarm, etc.):
e) Consultant Costs:
Consultant fees (not to exceed 12.58% of the delivery, set-up and
link project costs):
$
Expenses (permits, alarm verification, etc.):
$
Total Consultant Costs:
f) Other Connecting Costs: (please identify)
$
$
Removal/Set-Up Sub-Total:
Non-Refundable GST:
Total Removal/Set-Up Costs:
$
$
$
g) Connecting Link (if applicable):
Area of Link
m2
Construction:
$
Project expenses:
$
Total Connecting Link Costs:
$
Non-Refundable GST:
Total Link Costs:
$
$
Total Project Cost:
$
Thank you for completing this checklist. Please email a copy along with the site plan to your Regional Director: