RESORT VILLAGE OF SOUTH LAKE EXCAVATION PERMIT APPLICATION Date of Last Revision – MARCH 18, 2015 1. APPLICANT’S NAME (Printed): LAST NAME FIRST NAME 2. APPLICANT’S PRIMARY ADDRESS (Printed): ADDRESS CITY/TOWN PROVINCE POSTAL CODE 3. APPLICANT’S PHONE NUMBERS: HOME # CELL # WORK # BLOCK PLAN 4. LEGAL LAND DESCRIPTION: LOT 5. RESORT VILLAGE OF SOUTH LAKE ADDRESS: 6. EXCAVATION PERMIT REQUEST TYPE: CHECK WHERE APPLICABLE DESCRIPTION Initial Permit Subsequent Change to Initial Permit 1 RESORT VILLAGE OF SOUTH LAKE EXCAVATION PERMIT APPLICATION Date of Last Revision – MARCH 18, 2015 7. ADDITIONAL PERMITS OBTAINED: CHECK WHERE APPLICABLE DESCRIPTION Building Septic Other - attach list of 8. CONTRACTOR CONTACT INFORMATION IF APPLICABLE (Printed): LAST NAME FIRST NAME COMPANY NAME ADDRESS HOME # CITY/TOWN CELL # 2 PROVINCE POSTAL CODE WORK # RESORT VILLAGE OF SOUTH LAKE EXCAVATION PERMIT APPLICATION Date of Last Revision – MARCH 18, 2015 9. PURPOSE FOR THE EXCAVATION PERMIT (attach additional sheets if required): (Note the type of machinery that will be used to perform the excavating) 10. IF A GEO TECHNICAL REPORT HAS BEEN ISSUED PREVIOUSLY ON THE PROPERTY TO BE EXCAVATED, PLEASE ATTACH THE COMPLETE REPORT TO THE PERMIT APPLICATION 11. TYPE OF MATERIALS TO BE EXCAVATED CHECK WHERE APPLICABLE DESCRIPTION Soil Trees and Shrubbery Grass and Vegetation 12. DESCRIBE WHERE, WHEN AND HOW THE EXCAVATED MATERIAL WILL BE DISPOSED OF (Printed): 3 RESORT VILLAGE OF SOUTH LAKE EXCAVATION PERMIT APPLICATION Date of Last Revision – MARCH 18, 2015 13. EXCAVATION DATES: DESCRIPTION DATE (MM/DD/YY) Expected Start Date Expected Completion Date 14. APPLICANT’S SIGNATURE DATE (MM/DD/YY) SIGNATURE 15. OTHER NOTES (Printed): 4 RESORT VILLAGE OF SOUTH LAKE EXCAVATION PERMIT APPLICATION Date of Last Revision – MARCH 18, 2015 OFFICE USE ONLY CHECK WHERE APPLICABLE DESCRIPTION Permit Fee Received - $100 Permit Fee Waved/Reduced - attach approvals Plot Plan Received - location of buildings, septic/cistern, power lines, natural gas, telephone lines, access roads and the area to be excavated clearly marked (in feet from property lines) Actual Photos Required/Provided Geotechnical Report Required Lot Survey Required APPROVALS: 1. RESORT VILLAGE OF SOUTH LAKE APPROVAL DATE (MM/DD/YY) SIGNATURE 5