Campus Infrastructure & Services CIS STANDARD – PERMIT TO DIG FORM (CIS-ENG-F003) Project Name Permit Number Description and Location of Works (drawings, building, dimensions, depths, etc) University Project Manager (Authorised Person): Tel: Mob: Email: Mob: Email: Head Contractor’s Supervisor: Tel: PART A: Must be completed for ALL excavation operations Has Dial-Before-You-Dig been contacted to identify subsurface utility infrastructure? Yes/No Has University infrastructure information been obtained from the University Project Manager and reviewed? Yes/No Are there known/surveyed underground services in the location? Yes/No Electricity Low Voltage Yes/No Electricity High Voltage Yes/No Gas Yes/No Water Yes/No Stormwater Yes/No Sewerage Yes/No Telecom Yes/No Fibre Optic Yes/No Traffic Signal Yes/No Street Lighting Yes/No Unknown (detected on Ground Penetrating Radar, GPR) Yes/No No services Yes/No Proceed with mechanical excavation if no services are indicated within 500mm of the dig area on drawings, GPR survey or CAT & Genny scans, and the area has been proven clear by Cable Avoidance Tools (CAT) scan. GO TO PART B. Have all known services been marked out on the ground Yes/No WARNING! 1) 2) 3) If electricity, gas or unknown services are present then carefully expose the subsurface utility or service by pothole excavation using hand digging or sensitive vacuum/water blasting. Mark verified services on drawings to show exact depth, location and direction. Concrete encased electricity or gas services MUST be diverted or isolated before excavating. If not, then confirmation to proceed with mechanical excavation MUST be obtained from the University Project Manager. The project’s Head Contractor’s Supervisor MUST oversee all potholing or vacuum/water blasting operations until the service is safely located. Have potholes been dug prior to this permit? Yes/No Show all known/surveyed services on attached sketches or relevant survey drawings and show all proposed pothole locations for confirmation of electricity, gas or unknown services. Provide Safe Work Method Statement specifying equipment to be used to safely expose and identify any underground service: PART A: Signed Authority to safely expose and identify underground services University Project Manager (Authorised Person): Date: Head Contractor Supervisor: Date: CIS STANDARD – PERMIT TO DIG FORM (CIS-ENG-003) 1 of 3 Copy of this permit must be kept by Head Contractor’s Supervisor at the project site PART B: Must be completed with reference to PART A by the University Project Manager (Authorised Person) for ALL excavations. Have all known/surveyed services, been safely located? Yes/No Have electricity or gas services been identified within 500mm of the dig area? Yes/No If Yes, they MUST be fully exposed before mechanical excavation Yes/No Notes/Comments: Mechanical excavation may only proceed if: 1) 2) no services are indicated within 500mm of the dig area on drawings, GPR survey or CAT & Genny scans, and the area has been proven clear by Cable Avoidance Tools (CAT) scan, OR known services in the proposed dig area have been fully exposed by safe techniques under direct supervision by the Head Contractor’s Supervisor. PART B: Signed Approval to Dig University Project Manager (Authorised Person) Date: CIS Grounds Unit Manager Date: Valid from: Valid until: PART B: Acceptance by Head Contractor Supervisor Head Contractor Supervisor: Date: Confirming contents of this permit are understood and relevant contractor operatives briefed on control measures. Copy of this permit must be retained by Head Contractor’s Supervisor at the project site The excavation has been completed and left in a safe condition/superseded by another permit Head Contractor Supervisor: Date: WARNING! Excavation work must be suspended immediately and site made safe if services are damaged and the incident immediately reported to the University Project Manager. Copy of this permit must be kept by Head Contractor’s machine operator performing the excavation. CIS STANDARD – PERMIT TO DIG FORM (CIS-ENG-003) 2 of 3 PLAN/SECTIONS Show excavation plan details setting out trench details and include known services. Attach additional sheets as required. CIS STANDARD – PERMIT TO DIG FORM (CIS-ENG-003) 3 of 3