ATTACHMENT A REVISED Unit Cost Fee Rate Schedule DESCRIPTION OF SERVICE UNIT MOBILIZATION AND DEMOBILIZATION L.S. DESCRIPTION OF SERVICE UNIT UNIT COST UNIT COST MISCELLANEOUS EQUIPMENT & SERVICES Hay bales Each Staked Silt Fence LF Fill Dirt CY Tree Protection, as required LF Bagged Ice, 50/100 lbs per Bottled Water, Palletized Truck Load Pound Bulk Water, Tanker Gal Water Tanker for Bulk Water, Tanker Gal Light Tower w/Generator Day Office Trailer, 40 ft Day Portable Toilet, Single Day Portable Toilet, Single Week DESCRIPTION OF SERVICE UNIT SPECIALTY REMOVAL Debris Removal from Event Site and Hauling to DMS. Assumes haul distance less than 30 miles. Debris Removal from Event Site and Hauling to Landfill or Final Disposal Site (*Note). Assumes haul distance less than 30 miles. Debris Removal from DMS and Hauling to Landfill or Final Disposal Site (*Note). Assumes haul distance less than 30 miles. Additional Haul Cost When the Event Site is greater than 30 miles from the DMS, Landfill or Final Disposal Site Additional Haul Cost When the DMS is greater than 30 miles from the Landfill or Final Disposal Site Furniture, Mattresses, etc. collection, storage disposal (Disposal will be a pass through) CY CY CY Mile Mile CY UNIT COST HAZWASTE removal, segregation and packaging at DMS for disposal by others Processing (Grinding) of Debris at DMS Pound CY Processing (Burning) of Debris at DMS CY White Goods removal, segregation and disposal at approved location (*Note) Freon Management and Recycling (*Note) Unit Carcass Removal, Transportation and Disposal (* Note) Per unit & Disposal Costs Pound Removal of debris that will decompose (animals and organic fleshy matter) Waterway Debris Removal Debris removal from canals, rivers, creeks, streams & ditches CY Sand Collection and Screening Pick up, screen and return debris laden sand/mud/dirt/rock CY Vessel Removal (Land) Removal of eligible vessel LF Vessel Removal (Marine) Removal of eligible vessel from waterway LF Demolition of Private Structure CY Vehicle Removal Unit Removal of eligible vehicle Electronic Waste Removal of electronic debris that contain hazardous materials, such Unit as cathode ray tubes. Includes computer monitors and televisions Biowaste Pound Removal of waste capable of causing infection to humans (Animal waste, human blood, pathological waste) *NOTE: Contractor will pay tipping fee or other disposal fee at final disposal site(s) and charge Larimer at cost. All final disposal sites must be approved by Larimer County. ATTACHMENT A, pg 6/7 DESCRIPTION OF SERVICE UNIT UNIT COST TREE OPERATIONS, INCLUDING HAULING Hazardous Trees 6” diameter to 12” diameter Tree Hazardous tree removal for 6-12 inch trunk diameter Hazardous Trees 13” diameter to 24” diameter Tree Hazardous tree removal for 13-24 inch trunk diameter Hazardous Trees 25” diameter to 36” diameter Tree Hazardous tree removal for 25-36 inch trunk diameter Hazardous Trees 37” to 48” Tree Hazardous tree removal for 37-48 inch trunk diameter Hazardous Trees 49”+ Tree Hazardous tree removal for 49 inch and larger trunk diameter Trees with Hazardous Limbs >2” Tree Hazardous hanging limb removal Hazardous Stumps >24” – 36” Stump Hazardous stump removal for a 24-36 inch stump diameter Hazardous Stumps >37” – 48” Stump Hazardous stump removal 37-48 inch stump diameter Hazardous Stumps >49”+ Stump Hazardous stump removal 49+ inch stump diameter Stump Fill Dirt Fill dirt for stump holes after removal CY DESCRIPTION OF SERVICE UNIT VEGETATIVE COLLECT & HAUL 0-15 Miles Veg from Right of Way (ROW) to Debris Management Site (DMS) CY Vegetative collect and removal for a haul distance up to 15 miles 16-30 Miles Veg from ROW to DMS Vegetative collect and removal for a haul distance between 16 and 30 miles CY 31 – 60 Miles Veg from ROW to DMS Vegetative collect and removal for a distance between 31 and 60 miles CY 60+ Miles Veg from ROW to DMS Vegetative collect and removal for a haul distance greater than 60 miles CY Single Price Veg from ROW to DMS A single price vegetative collect and removal for any haul distance CY UNIT COST DESCRIPTION OF SERVICE UNIT UNIT COST MANAGEMENT AND REDUCTION Grinding Grinding/chipping vegetative debris CY Air Curtain Burning Air Curtain Burning vegetative debris CY Open Burning Opening burning vegetative debris CY CY Compacting Compacting vegetative debris Debris Management Site Management Preparation, management, and segregating at debis management site DESCRIPTION OF SERVICE CY UNIT UNIT COST C & D COLLECT & HAUL 0-15 Miles C&D from ROW to DMS CY C&D collect & removal for a haul distance up to 15 miles 16-30 Miles C&D from ROW to DMS C&D collect & removal for a haul distance between 16 and 30 miles CY 31-60 Miles C&D from ROW to DMS C&D collect and removal for a haul distance between 31 and 60 miles CY 60+ Miles C&D from ROW to DMS C&D collect & removal for a haul distance greater than 60 miles Single Price C&D from ROW to DMS CY A single price C&D collect and removal for any haul distance CY DESCRIPTION OF SERVICE UNIT FINAL DISPOSAL 0-15 Miles from DMS to Final Disposal Transport processed debris from DMS to final disposal up to 15 miles CY 16-30 Miles from DMS to Final Disposal Transport processed debris from DMS to final disposal, between 16 CY and 30 miles 31-60 Miles from DMS to Final Disposal Transport processed debris from DMS to final disposal, between 31 CY and 60 miles 60+ Miles from DMS to Final Disposal Transport processed debris from DMS to final disposal, 60 miles or more CY UNIT COST Single Price from DMS to Final Disposal A single price transport of processed debris from DMS to final CY disposal Tipping Fees (Vegetative) Fee includes negotiated contract price or pass through amount for CY vegetative Tipping Fees (Mix) Fee includes negotiated contract price or pass through amount for CY mix Tipping Fees (C&D) Fee includes negotiated contract price or pass through amount for C&D CY