name of the employer : nicco corporation limited ( project

advertisement
INSTRUMENTATION & CONTROL : 22(+) Years in Process Control Instrumentation (Post Qualification)
11 Years in Detailing (Engineering & Design) + 4 Years in Project Execution (Erection & Commissioning)
+ 2 Years in Quality Assurance (Expedition & Inspection) + 5 Years in O & M (Integrated Pulp & Paper Industry)
+ 3 Years as Instrument Technician in integrated pulp & paper industry (Pre Qualification)
NAME
:
RAMESH CHANDRA PAL
FATHER’S NAME
:
LATE HARIMOHAN PAL
DATE OF BIRTH
: 11TH FEBRUARY 1962
NATIONALITY
:
INDIAN
MARITAL STATUS
:
MARRIED
LANGUAGE KNOWN
:
HINDI, BENGALI, ENGLISH
PRESENT ADDRESS
(Address for Communication)
:
FLAT NO.302, LABH TOWER, SHIVALIK-3, CHANAKYAPURI CANAL ROAD
NEAR RANDAL MATA MANDIR, SAMA, P.O.-CHHANI ROAD, VADODARA
GUJARAT-3900, PHONE :(0265) 297 6997 (R),
PERMANENT ADDRESS
:
C/O- PAL BROTHERS, VILL. FULIA RAIL BAZAR,
P. O. - BELEMAT, VIA- FULIA COLONY, DIST. NADIA,
WEST BENGAL - 741402. PHONES: (03473) 234236 / 234715.
E-MAIL ADDRESS
:
rameshchandrapalnicco@rediffmail.com, srabanipal @rediffmail.com
PROFESSIONAL QUALIFICATION
:
B.E. (*) ELECTRONICS & COMMUNICATION ENGINEERING, CHARTERED ENGINEER.
EXAMINATION PASSED
:
AMIE (Sec .A & B) (**)
RECOGNITION BODY (*)
: Ministry of Education & Social Welfare, Government of India
ACADEMIC QUALIFICATION
:
TRAINING COURSE ATTENDED
(Certificate of Successful Completion)
: i) PROGRAMMING OF PLC & DRIVES FROM C-DAC, MOHALI, CHANDIGARH
ii) HMI/SCADA SYSTEM DEVELOPMENT FROM DOEACC, CALICUT, KERALA
iii) ULTRASONIC TESTING (ASNT LEVEL-II)
iv) QUALITY MANAGEMENT SYSTEM
LEAD AUDITOR ISO 9001:2008 FROM ESCI HYDERABAD CERTIFICATE FROM IRCA
v) Training for SOLAR PHOTOVOLTAIC FIELD ENGINEER from ESCI, Hyderabad.
: IN-Tools, CONVAL, AUTOCAD, MS OFFICE (WORDS, EXCEL, POWER POINT), LOTUS
SOFTWARE APPLICATION LITERACY
(By Working Experience)
DRIVING LICENSE NO.
FIELD OF WORKING EXPERIENCE
References:
(Mobile Phone : 09427787648)
RELIGION
: HINDU
THE INSTITUTION OF ENGINEERS (INDIA)
B.Sc., University of Calcutta (Kolkata)
: GJ06 / 044017 / 03,
PASSPORT NO : J0727970
: PROCESS CONTROL INSTRUMENTATION (21 + YEARS, POST QUALIFICATION)
Reference-1: Asim Kumer Niyogi, AVP-Engineering, Inox India Limited, Baroda, L.L(O):02653056351, E-mail : asim.niyogi @ inoxcva.com
Reference-2: Mr.Chandan Bhattacharyya-C.E.(Inst.), PDIL-Baroda, Mobile : 09427034986, E-mail : cbhattacharyya@wro.pdilin.com
Reference-3: Mr.Sugata Banerjee-G.M. (Inst.),TCE-Kolkata, Mobile : 09830731498, E-mail : sbandyopadhyay@tce.co.in
Reference-4: Mr. B.N. Mishra, Linde Engineering-Baroda, Mobile : 09427047113, E-mail : binodanand.mishra@linde-le.com
1. AT PRESENT I AM WORKING IN INOX INDIA LIMITED AN EPC ORGANISATION IN THE FIELD OF CRYOGENIC EQUIPMENT IN THE AREA OF
NITROGEN, OXYGEN, ARGON STORAGE AND VAPORISATION SYSTEM (SUPPLIER OF PACKAGE UNIT).
2. I WAS WORKING IN PROJECTS AND DEVELOPMENT INDIA LIMITED (A GOVT. OF INDIA UNDERTAKING) AN ORGANISATION FOR PROCESS
PLANT DESIGN, RESEARCH AND DEVELOPMENT.
3.
I WAS WORKING IN ENGINEERING DEPARTMENT OF UPL ENVIRONMENTAL ENGINEERS LIMITED, BARODA GUJARAT
AS
INSTRUMENATION DESIGNER FOR THE PERIOD OF 01.05.2006 TO 11.09.2007
4. I WAS WORKING IN NICCO CORPORATION LIMITED (PROJECT DIVISION), AN ISO 9001 COMPANY, PERFORMING ENGINEERING & PROJECT
EXECUTION (ENGG., ERECTION AND COMMISSIONING) OF DIFFERENT PROCESS PLANTS. DURATION : 25.02.1998 TO 30.04.2006
5. I WAS WORKING IN THE FIELD OF PROCESS CONTROL INSTRUMENTATION IN INTEGRATED PULP AND PAPER INDUSTRIES FROM APRIL
1993 TO FEBRUARY 1998 HAVING CONTINUOUS KAMYR DIGESTER,MULTISTAGE BLEACHING PLANT, PAPER MACHINES, COAL FIRED BOILER,
LIQUOR FIRED RECOVERY BOILER, RECAUSTISIZING PLANT, STOCK PREPARATION PLANT AND TURBINE.
>I GOT OPPURTUNITIES OF ACQUIRING FOLLOWING WORKING EXPERIENCES AND KNOWLEDGE OF PROCESS CONTROL INSTRUMENTATION
DURING ABOVE SERVICE PERIODS.
(ENGINEERING & DESIGN, OPERATION & MAINTENANCE, ERECTION, COMMISSIONING, INSPECTION OF
INSTRUMENTS / INSTRUMENTATION ITEMS AT VENDOR PREMISES, FAT, SAT, PGTR)
(**) After completion of B.Sc. from University of Calcutta I started work in integrated pulp & paper industry as
“Instrument Technician”. During this working period I took admission in The Institution of Engineers (India) and
passed both examinations (Sec. A&B) in Electronics & Communication Engineering in 1992
BRIEF OF WORKING EXPERIENCE
WORKING EXPERIENCE IN EPC ORGANISATION OF CRYOGENIC EQUIPMENT MANUFACTURING
WORKING PERIOD
JOB PERFORMED
NAME AND ADDRESS OF PRESENT EMPLOYER
From June 2011
INOX INDIA LIMITED, Baroda, Gujarat
Sr. Manager – (Instrumentation)
WORKING EXPERIENCE OF PROJECT MANAGEMENT CONSULTANCY (DETAILED ENGINEERING)
PROJECTS & DEVELOPMENT INDIA LIMITED
Sept, 2007 to June
Engineering Department in the position of
(A Govt. of India Undertaking), Western Regional Office,
2011
Senior Engineer (Instrumentation)
Rameshwar Estate, Subhanpura, Baroda-390023
1.Back up Consultancy for 3 x 830 M3 LPG Mounded Bullet, Oil India Limited, Duliajan, Assam, 8394
2.PMC for LPG and Propylene Mounded Storage Facilities, HPCL, Visakh Refinery, 8358
PROJECTS
3.PMC for 525 TPD Methanol Plant, GSFC, Vadodara, 8400
EXECUTED
4.PMC for Debottlenecking FCCU-1(Fractionator) and GHU, HPCL, Visakh Refinery, As Team Leader, 8441
5.PMC for Flue Gas Desulphurization & Purge Treatment Units, HPCL, Visakh Refinery, As Team Leader, 1701
6.PMC for PSA Unit, HPCL, Visakh Refinery, As Team Leader, 8485
WORKING EXPERIENCE OF ENGINEERING IN EPC ORGANISATION
I WAS WORKING AS INSTRUMENTATION
UPL ENVIRONMENTAL ENGINEERS LTD
May, 2006 TO
DESIGNER ENGR. IN ENGINEERING DEPTT.
(United Phosphorus Ltd. Group of Company), 203, Concorde
Sept, 2007
Position : Asstt. Mgr. (Instrumentation)
Building, R.C. Dutt Road, Alkapuri, Baroda-390007
NAME OF THE EMPLOYER : NICCO CORPORATION LIMITED ( PROJECT DIVISION)
NICCO HOUSE, 3RD FLOOR, 2-HARE STREET, KOLKATA-700001
HOUSE, 1
HOUSE,
2-HARE STREET, KOLKATA-700001, DURATION : 25.02.1998 TO 30.04.2006, Position:
Asstt. Mgr. (Inst.)
WORKING EXPERIENCE OF EXPEDITION AND INSPECTION (Asstt. Mgr. –Instrumentation)
From 23rd March 2004 to 30th April 2006 I was working in inspection and expedition department at Mumbai regional
Office of NPD for expedition and inspection of instruments / instrumentation items of NPCIL and other projects.
WORKING EXPERIENCE OF ENGINEERING AND PROJECT EXECUTOIN (INSTRUMENTATION)
PROJECT NAME
CONTROL
CLIENT CONSU- WORKING
JOB PERFORMED
SYSTEM
LT ANT PERIOD
PHOSPHORIC ACID
PLANT(CAPACITY:335 TPD),
DAHEJ, GUJRAT
DCS-CENTUM CS
(YOKOGAWA)
BIRLA
COPPER
FEDO,
FRANCE
MAR-1998
TO JULY-1999
GAS LIFT FACILITIES, GGS04,PAKHAJAN, GUJRAT.
PLC
ROCKWELL
(A.B.)
ONGC
EIL
LPZE EXPANSION AND
PERFORMANCE IMPROVEMENTPROJECT,DEBARI,
UDAIPUR,RAJASTHAN.
EFFLUENT TREATMENT
PLANT,(CAP:4000M3/DAY),
NORTH KADI, GUJRAT.
ALUMINATE LIQUOR
EVAPORATION PLANT,
DAMANJODI, ORISSA.
RAW WATER TREATMENT
PLANT(CAPACITY:570M3/H)DA
MANJODI, ORISSA.
RAW WATER TREATMENT
PLANT,DAMANJODI,ORISSA
BARODA HEAVY WATER
REVIVAL PROJECT, BARODA,
GUJRAT.
HEAVYWATER UPGRADING PLANT, TAPP4, TARAPUR,
MAHARASTRA.
LOCAL
CONTROL
PANEL
HINDUSTHAN
ZINC
LTD.
ONGC
MECON
AUGUST,
1999 TO
MAY,2000
JUNE, 2000
TO
JUNE, 2001
EIL
JULY, 2001
TO AUG-2001
PLANT COMMISSIONING
DCS-CENTUM CS
(YOKOGAWA)
NALCO
EIL
SEPT. 2001 TO
OCT-2001
PLANT COMMISSIONING
LOCAL
CONTROL
PANEL
NALCO
EIL
NOVEMBER
2001
PLANT COMMISSIONING
LOCAL CONTROL
PANEL
NALCO
EIL
PLANT COMMISSIONING
AND P.G. RUN
DCS
ALTERSYS
HEAVY
WATER
BOARD
NPCIL
DIRECT
EXECUTION
DIRECT
EXECUTION
MARCH
2002
APRIL, 2002
TO MAR. 04
JUNE-2005
OCT-2005
PLANT COMMISSIONING
LOCAL
CONTROL
PANEL
PLC
ROCKWELL
(A.B.)
ENGINEERING,ERECTION AND
COMMISSIONING
OF PROCESS CONTROL
INSTRUMENTATION
ENGINEERING, ERECTION AND
COMMISSIONING OF PROCESS
CONTROL INSTRUMENTATION
ENGINEERING ERECTION AND
COMMISSIONING OF PROCESS
CONTROL INSTRUMENTATION
ENGINEERING, ERECTION AND
COMMISSIONING
WORKING EXPERIENCES OF OPERATION AND MAINTENANCE (INSTRUMENTATION)
TITAGARH INDUSTRIES LIMITED (PAPER DIVN.)
TITAGARH PAPER MILLS, UNIT NO.02, KAKINARA, 24-PGS
(NORTH),WEST BENGAL.
NOV-1996
TO FEB-1998
OPERATION AND MAINTENANCE
Position : Asstt. Engineer (Instrumentation)
THE BENGALPAPER MILL(1989)COMPANYLTD,
APRIL, 1993 TO
OPERATION AND MAINTENANCE
BALLAVPUR, RANIGUNJ, BURDWAN, WEST BENGAL.
OCT, 1996
Position : Asstt. Engineer (Instrumentation)
Pre Qualification Working Experience
THE BENGALPAPER MILL(1989)COMPANY LTD,
APRIL, 1989
Worked as Instrument Technician
BALLAVPUR,RANIGUNJ,BURDWAN,WEST BENGAL
OCT, 1991
COMPETENCY
WORKING EXPERIENCE IN EPC ORGANISATION OF CRYOGENIC EQUIPMENT MANUFACTURING
Pre-bid & Detailed Engineering, Technical Evaluation, Erection & Commissioning of SVD System – Instrumentation & Control
WORKING EXPERIENCE OF PROJECT MANAGEMENT CONSULTANCY (DETAILED ENGINEERING)
1. Site Visit and Preparation of Site Survey Report.
2. Preparation of NIT Document for Instrumentation.
A. General Document : (Instrumentation Design Philosophy, Contractor’s Scope of Supply and Installation, Safety
Norms / Regulation, Quality Plan, Deviation format)
B. Instrumentation Detail Engineering : (Instrument Index, Preparation of loop diagrams, Instrument location layouts,
Instrument cable tray layouts, Terminal Connection Diagram, Interconnection Diagram, Cable schedule, Junction
Box Schedule, Control room arrangement, Instrument hook-up drawings, Standard Support Details, Instrument Air
distribution Layouts.)
C. Preparation of Data Sheet for Field Instrument : (Flow Instrument, Level Instrument, Pressure Instrument,
Temperature Instrument, Gas Detector, Conductivity Analyser, pH Analyser, Control Valve, ROV, Electro-pneumatic
positioner etc.
D. Preparation of Data Sheet for Erection Material :(Instrumentation signal and control cable, Thermocouple Extension
/ Compensating Cable, Junction Box)
E. Control System Instrumentation “DCS/PLC” : (Input / Output List, Input / Output Summary, Specification for
Marshalling Cabinet), Preparation of Control System Specification.
F. Sketches for Temperature Instrument: (Sketch for Thermowell, RTD, Thermocouple, Temperature Gauge)
G. Quantity and Schedule of Rates : (i. Quantity and Schedule of Rate for Instrumentation-Supply ii. Quantity and
Schedule of Rate for Instrumentation- Calibration , Erection, Testing, and Commissioning)
3. Technical Evaluation of offer of instruments and instrumentation items.
4. Adequacy Checking of Existing Instruments for Revamp Project and Sizing & Selection :
(Orifice for Flow Measurement, Restriction Orifice, Control Valve, Safety Valve)
WORKING EXPERIENCE OF QUALITY ASSURANCE-INSTRUMENTATION (EXPEDITION & INSPECTION)
Expedition & Inspection: (i) Review of Instrument Index, specifications / data sheets for field and control
room instruments. (ii) Conducting technical evaluation for quality requirements, of items to be purchased. (ii)
Review, comments and approval of Inspection and Test Plans (ITP) and test procedures for all Instrument and
Instrumentation item. (iii) Expedition of manufacturing of instrument items from office and through visit to
vendor works. (iv) Witness inspection, at vendor works, instrument system such as: DCS/PLC/SCADA/F&G &
ESD Hardware and marshalling / system cabinets, Level, Pressure, Temperature, Flow and other measurement
instrument, Instrument cables, control valves, On/Off valves, safety relief valves, shut down panels, metering
systems, Fire & Gas detectors, etc. & Issue of release certificate after satisfactory Quality Verification,
Document review. (v) Monitor/witness site testing & pre-commissioning activities of instrumentation systems.
(vi) Co-ordination with appointed TPIAs for inspection visits at vendor works. (vii) Co-ordination with
engineering consultants, vendors and TPIA for various project related quality issues.
WORKING EXPERIENCE OF ENGINEERING AND PROJECT EXECUTOIN (INSTRUMENTATION)
Engineering, Erection & Commissioning (i) Identify the Scope of Work. (ii) Review of Project Specifications,
Material Specifications, P&IDs, Area Classification Drawings, Instrumentation and Fire & Gas Detector Layouts.
(iii) Preparation of Instrument Data Sheets for Process Field Instrument. (iv) Co-ordination in preparation of
Purchase Orders, Requisitions, (v) Review and approval of vendor package system , Vendor / PreQualification, Technical evaluations etc. (vi) Review and clarification on Technical Queries raised by Contractor
and vendor. (vii) Calibration, Loop Checking & Pre-Commissioning and commissioning of Field instruments.(viii)
Site acceptance test of control system instrumentation (PLC+DCS), (ix) Review of R.A. Bill submitted by
instrument contractor and certification of measurement and quantity of site work.
WORKING EXPERIENCES OF OPERATION AND MAINTENANCE (INSTRUMENTATION)
I worked in operation and maintenance in continuous process plants of integrated pulp and paper industry
having 11 sections (i) Chipper, (ii) Continuous Kamyr Digester, (iii) Multi-stage Bleaching Plant, (iv) Stock
Preparation plant, (v) Paper Machines, (vi) Cutting Section, (vii) Coal Fired Boiler, (viii) Recovery Boiler, (ix)
Turbines, (x) Evaporation Plant (xi) Re-Causticizing Plant
Pre Qualification Working Experience
I worked in operation and maintenance in continuous process plants in integrated pulp and paper industry as instrument
technician simultaneously during the study of AMIE (Sec. A & B)
Download