INSTRUMENTATION & CONTROL : 22(+) Years in Process Control Instrumentation (Post Qualification) 11 Years in Detailing (Engineering & Design) + 4 Years in Project Execution (Erection & Commissioning) + 2 Years in Quality Assurance (Expedition & Inspection) + 5 Years in O & M (Integrated Pulp & Paper Industry) + 3 Years as Instrument Technician in integrated pulp & paper industry (Pre Qualification) NAME : RAMESH CHANDRA PAL FATHER’S NAME : LATE HARIMOHAN PAL DATE OF BIRTH : 11TH FEBRUARY 1962 NATIONALITY : INDIAN MARITAL STATUS : MARRIED LANGUAGE KNOWN : HINDI, BENGALI, ENGLISH PRESENT ADDRESS (Address for Communication) : FLAT NO.302, LABH TOWER, SHIVALIK-3, CHANAKYAPURI CANAL ROAD NEAR RANDAL MATA MANDIR, SAMA, P.O.-CHHANI ROAD, VADODARA GUJARAT-3900, PHONE :(0265) 297 6997 (R), PERMANENT ADDRESS : C/O- PAL BROTHERS, VILL. FULIA RAIL BAZAR, P. O. - BELEMAT, VIA- FULIA COLONY, DIST. NADIA, WEST BENGAL - 741402. PHONES: (03473) 234236 / 234715. E-MAIL ADDRESS : rameshchandrapalnicco@rediffmail.com, srabanipal @rediffmail.com PROFESSIONAL QUALIFICATION : B.E. (*) ELECTRONICS & COMMUNICATION ENGINEERING, CHARTERED ENGINEER. EXAMINATION PASSED : AMIE (Sec .A & B) (**) RECOGNITION BODY (*) : Ministry of Education & Social Welfare, Government of India ACADEMIC QUALIFICATION : TRAINING COURSE ATTENDED (Certificate of Successful Completion) : i) PROGRAMMING OF PLC & DRIVES FROM C-DAC, MOHALI, CHANDIGARH ii) HMI/SCADA SYSTEM DEVELOPMENT FROM DOEACC, CALICUT, KERALA iii) ULTRASONIC TESTING (ASNT LEVEL-II) iv) QUALITY MANAGEMENT SYSTEM LEAD AUDITOR ISO 9001:2008 FROM ESCI HYDERABAD CERTIFICATE FROM IRCA v) Training for SOLAR PHOTOVOLTAIC FIELD ENGINEER from ESCI, Hyderabad. : IN-Tools, CONVAL, AUTOCAD, MS OFFICE (WORDS, EXCEL, POWER POINT), LOTUS SOFTWARE APPLICATION LITERACY (By Working Experience) DRIVING LICENSE NO. FIELD OF WORKING EXPERIENCE References: (Mobile Phone : 09427787648) RELIGION : HINDU THE INSTITUTION OF ENGINEERS (INDIA) B.Sc., University of Calcutta (Kolkata) : GJ06 / 044017 / 03, PASSPORT NO : J0727970 : PROCESS CONTROL INSTRUMENTATION (21 + YEARS, POST QUALIFICATION) Reference-1: Asim Kumer Niyogi, AVP-Engineering, Inox India Limited, Baroda, L.L(O):02653056351, E-mail : asim.niyogi @ inoxcva.com Reference-2: Mr.Chandan Bhattacharyya-C.E.(Inst.), PDIL-Baroda, Mobile : 09427034986, E-mail : cbhattacharyya@wro.pdilin.com Reference-3: Mr.Sugata Banerjee-G.M. (Inst.),TCE-Kolkata, Mobile : 09830731498, E-mail : sbandyopadhyay@tce.co.in Reference-4: Mr. B.N. Mishra, Linde Engineering-Baroda, Mobile : 09427047113, E-mail : binodanand.mishra@linde-le.com 1. AT PRESENT I AM WORKING IN INOX INDIA LIMITED AN EPC ORGANISATION IN THE FIELD OF CRYOGENIC EQUIPMENT IN THE AREA OF NITROGEN, OXYGEN, ARGON STORAGE AND VAPORISATION SYSTEM (SUPPLIER OF PACKAGE UNIT). 2. I WAS WORKING IN PROJECTS AND DEVELOPMENT INDIA LIMITED (A GOVT. OF INDIA UNDERTAKING) AN ORGANISATION FOR PROCESS PLANT DESIGN, RESEARCH AND DEVELOPMENT. 3. I WAS WORKING IN ENGINEERING DEPARTMENT OF UPL ENVIRONMENTAL ENGINEERS LIMITED, BARODA GUJARAT AS INSTRUMENATION DESIGNER FOR THE PERIOD OF 01.05.2006 TO 11.09.2007 4. I WAS WORKING IN NICCO CORPORATION LIMITED (PROJECT DIVISION), AN ISO 9001 COMPANY, PERFORMING ENGINEERING & PROJECT EXECUTION (ENGG., ERECTION AND COMMISSIONING) OF DIFFERENT PROCESS PLANTS. DURATION : 25.02.1998 TO 30.04.2006 5. I WAS WORKING IN THE FIELD OF PROCESS CONTROL INSTRUMENTATION IN INTEGRATED PULP AND PAPER INDUSTRIES FROM APRIL 1993 TO FEBRUARY 1998 HAVING CONTINUOUS KAMYR DIGESTER,MULTISTAGE BLEACHING PLANT, PAPER MACHINES, COAL FIRED BOILER, LIQUOR FIRED RECOVERY BOILER, RECAUSTISIZING PLANT, STOCK PREPARATION PLANT AND TURBINE. >I GOT OPPURTUNITIES OF ACQUIRING FOLLOWING WORKING EXPERIENCES AND KNOWLEDGE OF PROCESS CONTROL INSTRUMENTATION DURING ABOVE SERVICE PERIODS. (ENGINEERING & DESIGN, OPERATION & MAINTENANCE, ERECTION, COMMISSIONING, INSPECTION OF INSTRUMENTS / INSTRUMENTATION ITEMS AT VENDOR PREMISES, FAT, SAT, PGTR) (**) After completion of B.Sc. from University of Calcutta I started work in integrated pulp & paper industry as “Instrument Technician”. During this working period I took admission in The Institution of Engineers (India) and passed both examinations (Sec. A&B) in Electronics & Communication Engineering in 1992 BRIEF OF WORKING EXPERIENCE WORKING EXPERIENCE IN EPC ORGANISATION OF CRYOGENIC EQUIPMENT MANUFACTURING WORKING PERIOD JOB PERFORMED NAME AND ADDRESS OF PRESENT EMPLOYER From June 2011 INOX INDIA LIMITED, Baroda, Gujarat Sr. Manager – (Instrumentation) WORKING EXPERIENCE OF PROJECT MANAGEMENT CONSULTANCY (DETAILED ENGINEERING) PROJECTS & DEVELOPMENT INDIA LIMITED Sept, 2007 to June Engineering Department in the position of (A Govt. of India Undertaking), Western Regional Office, 2011 Senior Engineer (Instrumentation) Rameshwar Estate, Subhanpura, Baroda-390023 1.Back up Consultancy for 3 x 830 M3 LPG Mounded Bullet, Oil India Limited, Duliajan, Assam, 8394 2.PMC for LPG and Propylene Mounded Storage Facilities, HPCL, Visakh Refinery, 8358 PROJECTS 3.PMC for 525 TPD Methanol Plant, GSFC, Vadodara, 8400 EXECUTED 4.PMC for Debottlenecking FCCU-1(Fractionator) and GHU, HPCL, Visakh Refinery, As Team Leader, 8441 5.PMC for Flue Gas Desulphurization & Purge Treatment Units, HPCL, Visakh Refinery, As Team Leader, 1701 6.PMC for PSA Unit, HPCL, Visakh Refinery, As Team Leader, 8485 WORKING EXPERIENCE OF ENGINEERING IN EPC ORGANISATION I WAS WORKING AS INSTRUMENTATION UPL ENVIRONMENTAL ENGINEERS LTD May, 2006 TO DESIGNER ENGR. IN ENGINEERING DEPTT. (United Phosphorus Ltd. Group of Company), 203, Concorde Sept, 2007 Position : Asstt. Mgr. (Instrumentation) Building, R.C. Dutt Road, Alkapuri, Baroda-390007 NAME OF THE EMPLOYER : NICCO CORPORATION LIMITED ( PROJECT DIVISION) NICCO HOUSE, 3RD FLOOR, 2-HARE STREET, KOLKATA-700001 HOUSE, 1 HOUSE, 2-HARE STREET, KOLKATA-700001, DURATION : 25.02.1998 TO 30.04.2006, Position: Asstt. Mgr. (Inst.) WORKING EXPERIENCE OF EXPEDITION AND INSPECTION (Asstt. Mgr. –Instrumentation) From 23rd March 2004 to 30th April 2006 I was working in inspection and expedition department at Mumbai regional Office of NPD for expedition and inspection of instruments / instrumentation items of NPCIL and other projects. WORKING EXPERIENCE OF ENGINEERING AND PROJECT EXECUTOIN (INSTRUMENTATION) PROJECT NAME CONTROL CLIENT CONSU- WORKING JOB PERFORMED SYSTEM LT ANT PERIOD PHOSPHORIC ACID PLANT(CAPACITY:335 TPD), DAHEJ, GUJRAT DCS-CENTUM CS (YOKOGAWA) BIRLA COPPER FEDO, FRANCE MAR-1998 TO JULY-1999 GAS LIFT FACILITIES, GGS04,PAKHAJAN, GUJRAT. PLC ROCKWELL (A.B.) ONGC EIL LPZE EXPANSION AND PERFORMANCE IMPROVEMENTPROJECT,DEBARI, UDAIPUR,RAJASTHAN. EFFLUENT TREATMENT PLANT,(CAP:4000M3/DAY), NORTH KADI, GUJRAT. ALUMINATE LIQUOR EVAPORATION PLANT, DAMANJODI, ORISSA. RAW WATER TREATMENT PLANT(CAPACITY:570M3/H)DA MANJODI, ORISSA. RAW WATER TREATMENT PLANT,DAMANJODI,ORISSA BARODA HEAVY WATER REVIVAL PROJECT, BARODA, GUJRAT. HEAVYWATER UPGRADING PLANT, TAPP4, TARAPUR, MAHARASTRA. LOCAL CONTROL PANEL HINDUSTHAN ZINC LTD. ONGC MECON AUGUST, 1999 TO MAY,2000 JUNE, 2000 TO JUNE, 2001 EIL JULY, 2001 TO AUG-2001 PLANT COMMISSIONING DCS-CENTUM CS (YOKOGAWA) NALCO EIL SEPT. 2001 TO OCT-2001 PLANT COMMISSIONING LOCAL CONTROL PANEL NALCO EIL NOVEMBER 2001 PLANT COMMISSIONING LOCAL CONTROL PANEL NALCO EIL PLANT COMMISSIONING AND P.G. RUN DCS ALTERSYS HEAVY WATER BOARD NPCIL DIRECT EXECUTION DIRECT EXECUTION MARCH 2002 APRIL, 2002 TO MAR. 04 JUNE-2005 OCT-2005 PLANT COMMISSIONING LOCAL CONTROL PANEL PLC ROCKWELL (A.B.) ENGINEERING,ERECTION AND COMMISSIONING OF PROCESS CONTROL INSTRUMENTATION ENGINEERING, ERECTION AND COMMISSIONING OF PROCESS CONTROL INSTRUMENTATION ENGINEERING ERECTION AND COMMISSIONING OF PROCESS CONTROL INSTRUMENTATION ENGINEERING, ERECTION AND COMMISSIONING WORKING EXPERIENCES OF OPERATION AND MAINTENANCE (INSTRUMENTATION) TITAGARH INDUSTRIES LIMITED (PAPER DIVN.) TITAGARH PAPER MILLS, UNIT NO.02, KAKINARA, 24-PGS (NORTH),WEST BENGAL. NOV-1996 TO FEB-1998 OPERATION AND MAINTENANCE Position : Asstt. Engineer (Instrumentation) THE BENGALPAPER MILL(1989)COMPANYLTD, APRIL, 1993 TO OPERATION AND MAINTENANCE BALLAVPUR, RANIGUNJ, BURDWAN, WEST BENGAL. OCT, 1996 Position : Asstt. Engineer (Instrumentation) Pre Qualification Working Experience THE BENGALPAPER MILL(1989)COMPANY LTD, APRIL, 1989 Worked as Instrument Technician BALLAVPUR,RANIGUNJ,BURDWAN,WEST BENGAL OCT, 1991 COMPETENCY WORKING EXPERIENCE IN EPC ORGANISATION OF CRYOGENIC EQUIPMENT MANUFACTURING Pre-bid & Detailed Engineering, Technical Evaluation, Erection & Commissioning of SVD System – Instrumentation & Control WORKING EXPERIENCE OF PROJECT MANAGEMENT CONSULTANCY (DETAILED ENGINEERING) 1. Site Visit and Preparation of Site Survey Report. 2. Preparation of NIT Document for Instrumentation. A. General Document : (Instrumentation Design Philosophy, Contractor’s Scope of Supply and Installation, Safety Norms / Regulation, Quality Plan, Deviation format) B. Instrumentation Detail Engineering : (Instrument Index, Preparation of loop diagrams, Instrument location layouts, Instrument cable tray layouts, Terminal Connection Diagram, Interconnection Diagram, Cable schedule, Junction Box Schedule, Control room arrangement, Instrument hook-up drawings, Standard Support Details, Instrument Air distribution Layouts.) C. Preparation of Data Sheet for Field Instrument : (Flow Instrument, Level Instrument, Pressure Instrument, Temperature Instrument, Gas Detector, Conductivity Analyser, pH Analyser, Control Valve, ROV, Electro-pneumatic positioner etc. D. Preparation of Data Sheet for Erection Material :(Instrumentation signal and control cable, Thermocouple Extension / Compensating Cable, Junction Box) E. Control System Instrumentation “DCS/PLC” : (Input / Output List, Input / Output Summary, Specification for Marshalling Cabinet), Preparation of Control System Specification. F. Sketches for Temperature Instrument: (Sketch for Thermowell, RTD, Thermocouple, Temperature Gauge) G. Quantity and Schedule of Rates : (i. Quantity and Schedule of Rate for Instrumentation-Supply ii. Quantity and Schedule of Rate for Instrumentation- Calibration , Erection, Testing, and Commissioning) 3. Technical Evaluation of offer of instruments and instrumentation items. 4. Adequacy Checking of Existing Instruments for Revamp Project and Sizing & Selection : (Orifice for Flow Measurement, Restriction Orifice, Control Valve, Safety Valve) WORKING EXPERIENCE OF QUALITY ASSURANCE-INSTRUMENTATION (EXPEDITION & INSPECTION) Expedition & Inspection: (i) Review of Instrument Index, specifications / data sheets for field and control room instruments. (ii) Conducting technical evaluation for quality requirements, of items to be purchased. (ii) Review, comments and approval of Inspection and Test Plans (ITP) and test procedures for all Instrument and Instrumentation item. (iii) Expedition of manufacturing of instrument items from office and through visit to vendor works. (iv) Witness inspection, at vendor works, instrument system such as: DCS/PLC/SCADA/F&G & ESD Hardware and marshalling / system cabinets, Level, Pressure, Temperature, Flow and other measurement instrument, Instrument cables, control valves, On/Off valves, safety relief valves, shut down panels, metering systems, Fire & Gas detectors, etc. & Issue of release certificate after satisfactory Quality Verification, Document review. (v) Monitor/witness site testing & pre-commissioning activities of instrumentation systems. (vi) Co-ordination with appointed TPIAs for inspection visits at vendor works. (vii) Co-ordination with engineering consultants, vendors and TPIA for various project related quality issues. WORKING EXPERIENCE OF ENGINEERING AND PROJECT EXECUTOIN (INSTRUMENTATION) Engineering, Erection & Commissioning (i) Identify the Scope of Work. (ii) Review of Project Specifications, Material Specifications, P&IDs, Area Classification Drawings, Instrumentation and Fire & Gas Detector Layouts. (iii) Preparation of Instrument Data Sheets for Process Field Instrument. (iv) Co-ordination in preparation of Purchase Orders, Requisitions, (v) Review and approval of vendor package system , Vendor / PreQualification, Technical evaluations etc. (vi) Review and clarification on Technical Queries raised by Contractor and vendor. (vii) Calibration, Loop Checking & Pre-Commissioning and commissioning of Field instruments.(viii) Site acceptance test of control system instrumentation (PLC+DCS), (ix) Review of R.A. Bill submitted by instrument contractor and certification of measurement and quantity of site work. WORKING EXPERIENCES OF OPERATION AND MAINTENANCE (INSTRUMENTATION) I worked in operation and maintenance in continuous process plants of integrated pulp and paper industry having 11 sections (i) Chipper, (ii) Continuous Kamyr Digester, (iii) Multi-stage Bleaching Plant, (iv) Stock Preparation plant, (v) Paper Machines, (vi) Cutting Section, (vii) Coal Fired Boiler, (viii) Recovery Boiler, (ix) Turbines, (x) Evaporation Plant (xi) Re-Causticizing Plant Pre Qualification Working Experience I worked in operation and maintenance in continuous process plants in integrated pulp and paper industry as instrument technician simultaneously during the study of AMIE (Sec. A & B)