Stormwater Management checklist for Pre-construction Site development proposal with Stormwater Management plan received Item a. Is this a permitted site? Is area of disturbance less than one acre? Is area of disturbance more than one and less than five acres? Area is more than five acres. b. Will this permit be obtained by the owner, or developer or GH Phipps? c. Will the owner transfer permit to GHP? d. Are any R factor waivers applicable to this project? Site must be less than 5 acres. e. Is this project on Federal land? f. Will a dewatering permit be required? g. Will a fugitive dust permit be required? h. Is this project part of a larger development? i. Do the parties involved have a signed agreement for the use and maintenance of shared BMP’s, and other structures used for Stormwater control? j. Outside consultant for storm water monthly audits. i.e. ( Bill Robinson w/ Stormwater Risk Management Inc) k. Outside consultant used for baseline assessment and initial analysis. Yes & Included in estimate No Not included in estimate Approx cost $300 n/a $400 $500 $500 Comments Site design review process Item a. Existing and proposed topography are depicted on drawings. b. Boundaries of the existing predominant vegetation and proposed limits of clearing are shown. c. Location and boundaries of resource protection areas such as wetlands, lakes, ponds and other setbacks are shown. d. Existing and proposed utilities and easements shown. e. Location of existing and proposed conveyance systems such as swales and storm drain systems. f. Location and relationship of site to upstream and downstream properties and drainages g. Preliminary location, size, and limits of site disturbance and proposed stormwater treatment practices. h. Location of existing roads, buildings, and other structures shown. i. Preliminary landscaping plans indicating proposed final landscaping. j. Preliminary erosion and sediment control plan developed. Hydrologic and hydraulic analysis a. Existing condition analysis for runoff rates, volumes, and velocities are presented showing supporting calculations. b. Proposed condition analysis for runoff rates, volumes, and velocities are presented showing supporting calculations. YES NO Comments Project schedule and Phasing of BMP’s Item a. Determine phasing plan for erosion control measures. b. Determine the number of access points into the site considering the phasing. c. Determine the types of BMP’s that will be required in the management plan. d. Determine length of time that will be required to maintain the BMP’s after de-mobilization of the site and prior to 70% establishment of the permanent ground cover. e. Determine who will install the initial BMP’s? f. Determine who will maintain the BMP’s? g. Determine who will install supplemental BMP’s? h. Has the Project Manager for this project been selected? Is there time to establish plan and apply for permit 10 days prior to excavation? Special requirements a. Does the local jurisdiction require separate permit for stormwater management. i.e. MS4 or City & County Permit closeout a. Will permit be transferred to owner @substantial completion b. Are 30 day inspections and maintenance required after substantial completion? Contractors Pase construction services, Inc 303-770-9171 Down to earth compliance LLC 303-306-1606 Venders Nilex – James Cramer 303-766-2000 Bowman Construction Supply 303-696-8960 Yes & Included in estimate No Not included in estimate Approx cost Comments