KLIMOS Toolkit Screening Note Screening Note - KLIMOS Toolkit - The Screening Sheet consists of a set of guiding questions: - to assess the environmental impacts of development co-operation interventions (e.g. projects) on the environment; and - to assess the environmental risks faced by the development co-operation interventions (e.g. projects) Summary (to complete after filling out the questions) Please draw one of the following conclusions: 0 Accept (score 2) 0 Minor changes are required (score 1) 0 Major changes are required (score 0) Summarize your evaluation: 1 KLIMOS Toolkit Screening Note Questions 1. Climate Change & Air Quality Climate Change 1.1 What is the expected impact of the intervention on climate change? 1.2 Which (mitigation) measures are taken to deal with the intervention’s impact in climate change? 1.3 What is the expected risk generated by climate change on the intervention’s success? 1.4 Which (adaptation) measures are taken to deal with the risk posed by climate change? Air Quality 1.5 What is the expected impact of the intervention on respectively outdoor & indoor air quality? 1.6 Which measures are taken to deal with the intervention’s impact on respectively outdoor and indoor air quality? 1.7 What is the expected risk generated by air quality problems on the intervention’s success? 2 KLIMOS Toolkit Screening Note 1.8 Which measures are taken to deal with the risk posed by air quality? 2. Forest & Land Use Forest 2.1 What is the expected impact of the intervention on forests? 2.2 Which measures are taken to deal with this impact on forests? 2.3 What is the expected risk generated by forests on the intervention’s success? 2.4 Which measures are taken to deal with the risk posed by forests? Land degradation 2.5 What is the expected impact of the intervention on land degradation (desertification, pollution, soil erosion, nutrient depletion, salinity etc.)? 2.6 Which measures are taken to deal with the impact on land degradation? 2.7 What is the expected risk generated by land degradation (pollution, soil erosion, nutrient depletion, salinity) on the intervention’s success? 2.8 Which measures are taken to deal with the risks posed by land degradation? 3 KLIMOS Toolkit Screening Note 3. Water 3.1 What is the expected impact of the intervention on water availability and on water quality? 3.2 Which measures are taken to deal with the intervention’s impact on water availability and quality? 3.3 What are the expected risks posed by water availability and water quality on the intervention? 3.4 Which measures are taken to deal with the risks posed by water availability and water quality? 4. Biodiversity 4.1 What is the expected impact of the intervention on biodiversity? 4.2 Which measures are taken to deal with the intervention’s impact on biodiversity? 4.3 What is the expected risk posed by biodiversity on the intervention? 4 KLIMOS Toolkit Screening Note 4.4 Which measures are taken to deal with the risks posed by biodiversity on the intervention? 5. Management 5.1. Do the local communities involved with the intervention have the capacity to adapt to a changing natural environment? 5.2 Which measures are taken to enhance the local communities’ adaptive capacity? 5.3 Are environmental sustainability issues addressed in each phase of the intervention cycle? (e.g. identification, formulation, implementation, monitoring, follow-up and evaluation of a project) 5.4 Is there any local environmental regulation and/or legislation that should be fulfilled (e.g. Environmental Impact Assessment (EIA))? 5.5 How will these environmental regulation/legislation requirements be fulfilled with regard to this intervention? 5.6 Are local stakeholders involved in the design of the intervention, especially with regard to the mainstreaming of environmental impacts and risks? 5.7 Are local stakeholders, particularly vulnerable groups (women, children) specifically vulnerable to environmental risk? 5