ESEA BAT BEP FORUM

advertisement
ESEA BAT BEP FORUM
Annual Report 2009
Activity Item
Expected Output
Actions achieved
(as of 09-12-08)
Actions Achieved
(as of October 2009)
1- To complete translation of the Advanced Version
of BAT/BEP Guidelines and Guidance of selected
industrial sectors to respective national languages.
Translated versions from the
all member countries made
available.
Thailand
recruited
a
national expert to translate
the Power Generation and
Metallurgical
sector
chapters to local language.
Lao PDR has published the
translated version of the
power generation section
of the guidelines.
The Chinese version of the
BAT/BEP Guidelines and
Guidance
has
been
completed.
Mongolia
completed
translation
of
Power
Generation, Open Burning,
Waste
Incineration,
Residential
Combustion
Sources,
Textile
and
Leather Production, Waste
Oil Refineries Guidelines
into the local language and
sent for printing to be
available for dissemination
in January 2010.
Thailand has revised the
translated version of the
power
generation,
metallurgical
and
crematoria sectors of the
BAT/BEP Guidelines and
Guidance. The publications
will be disseminated in
early 2010.
Indonesia has started to
translate
Waste
Incineration, Cement Kilns
Firing Hazardous Waste,
Production of Pulp using
elemental
chlorine
pr
chemical
generating
elemental chlorine
and
thermal processes in the
metallurgy sector into local
language
Cambodia has started to
translate Fossil fuel-Fired
utilities
and
Industrial
Boilers into local language.
The translation will be
completed in 2010.
2. National Cleaner Production Centers and other
relevant national or regional institutions are invited to
contribute to the regional guidelines and guidance
documents by the Coordinators or the Chair of the
Regional Forum or UNIDO. Training programs on CP
related to POPs BAT/BEP are designed and started as
appropriate.
Continued collaboration with
CP centers in the region
undertaken.
Workshop
on
Cleaner
Production and Regulatory
Framework
organized
in
collaboration
with
the
Swedish EPA.
1. Achieved for the Power
generation
group
with
participation of NCPCs from
Laos.
2.
NCPCs
Cambodia
provided input and national
institutions
have
been
invited and participated.
NCPC Laos responded by
completing
the
questionnaires.
3. NCPC Lao has agreed to
train/build
capacity
of
concerned institutions on
the concept of Cleaner
Production.
4. MIME,Cambodia, First
year of Priority Project
Working Group leaded by
Dr. Tung Ciny, conducted
the workshop about the
improvement of the quality
and safety of products and
demonstration BAT/BEP in
Fossil Fuel-Fired Utilities
and Industrial Boilers for
SMEs and factories.
3. In-plant training activities for assessment of
selected industrial sectors are designed and started
as appropriate or practical
Relevant training for a good
number of personnel in
selected
industrial
Training provided by NCPC
Cambodia on CP for
Boilers.
A private sector workshop
was held in April 2009 in
cooperation
with
the
Ministry of Environment of
Indonesia. CP measures as
applied to boilers were
discussed.
A CP/BATBEP Workshop of
Fossil fuel-fired utilities and
industrial boilers was held
for local participants in the
Philippines in cooperation
with the National Power
Corporation.
MIME,
Cambodia,
the
second year of Priority
Project Working Group
leaded by Dr. Tung Ciny,
has been conducting the
workshop
on
the
improvement of the quality
and safety of products and
demonstration BAT/BEP in
Fossil Fuel-Fired Utilities
and Industrial Boilers for
SMEs and factories.
A training on the published
BAT/BEP guidelines for EIA
experts of Mongolia is
planned to be organized in
January 2010 by the
Ministry
of
Nature,
Environment and Tourism
of Mongolia.
sectors/government
institutions achieved.
4. Monitoring programs in selected industrial sources
are designed and started as appropriate or practical
Monitoring programs designed
and applied to selected
industrial sources.
1. Thailand has developed
the Terms of Reference for
analysis/sampling
programs for the power
generation
and
metallurgical sectors as
part of a 1-year project on
the inventory of emissions
from the said sectors.
2. Lao PDR has initiated
discussions on sampling
programs with concerned
institutions.
3. China has done the
sampling
of
the
dioxin/furan releases in
several
medical
waste
incinerators, metallurgical
plants and open-burning
for verification of the
emission factors.
Mongolia has conducted
“Market study of Heat-Only
Boilers
and
Coal-Fired
Water Heaters” in April,
2009.
Thailand
has
doen
sampling/analysis
of
dioxin/furan releases from
the
power
generation
(classified by fuel types)
and metallurgical processes
(classified
by
thermal
processes)
and
has
developed
additional
sampling/analysis
programs for the power
generation
and
metallurgical sectors to
fulfil
information/data
gaps.
Ministry of Environment,
Republic of Indonesia has
initialled for developing
guideline
environmental
friendly industrial boilers
In
Indonesia,
several
cement kilns monitor their
dioxin/furan emission for
getting a permit to use
hazardous
waste
as
substitute material and or
substitute fuel (in general
term recognized as coprocessing)
5. Training program on sampling, sample preparation
and analysis is designed and started as appropriate.
Appropriate training program
in sampling designed and
implemented.
Collaboration between UNIDO
and regional training centres
initiated and training program
conducted.
1. The Thai government
has
approved
the
dioxin/furan laboratory at
the Environmental research
and training center and
could
provide
for
dioxin/furan
analysis.
Request has been made to
UNIDO
to
train
the
laboratory staff.
1. UNIDO has initiated
discussions with Japan
Environmental
management
Association
for Industry for technical
training
and
with
a
laboratory facility in South
Korea for sampling and
analysis of dioxins and
furans
2. Chinese government is
establishing
another
7
regional dioxin Lab. China
is going to organize the
training
programs
of
QA/QC of these labs. It
would be appreciated if the
Forum can provide timely
training programs.
2. UNIDO has sent 2
participants from Lao PDr
and 2 from Cambodia for
training on Dioxin Sampling
and Analysis at the VIMTA
Laboratories in Hyderabad,
India
3. Discussion started and
would continue between
UNIDO and UNU-Japan to
initiate
the
training
program.
4. UNU has recommended
that
existing/upcoming
analytical infrastructures be
used relative to this
activity. The fifth phase of
the UNU POPs Monitoring
project (2008-2011) could
provide training resources
to meet the needs of the
Forum if incremental costs
to arrange such training
are made available.
3. In framework of the
UNIDO/GEF
“PCBs
Management
Project”
Mongolia has involved 3
participants
from
the
Institute of Chemistry and
Chemical Technology in a
training
on
laboratory
analyses
of
PCBs
in
Severtsov
Institute
of
Moscow, Russia.
6. Project document for the fossil-fuel fired utilities
and industrial sector is finalized and submitted to
GEF. Implementation of the plan of action of the
power generation working group which would
contribute to the implementation of the Forum action
plan related to the expected output reflected in the
PIF.
The 1st year of the project
work plan implemented.
Project document finalized
and submitted August 2009
7. Project Identification Form (PIF) and Project
Preparation Grant (PPG) activities for the Thermal
Processes in the Metallurgical sector is drafted and
finalized.
PIF and PPG finalized.
Fully achieved
8. Coordinators of the waste incinerator sector are
nominated and their coordinates (full address)
communicated to the members of the working group,
to the Chair of the Regional Forum and to UNIDO.
Coordinators of the countries
involved
in
the
waste
incineration sector identified
and work program started.
First meeting held on 9-10
November. PIF drafted.
9. Coordinators of the open burning sector are
nominated and their coordinates (full address)
communicated to the members of the working group,
to the Chair of the Regional Forum and to UNIDO.
Coordinators of the countries
involved in the open burning
sector
identified
and
workshop conducted.
10.
Coordinators of the cement sector are
nominated and their coordinates (full address)
communicated to the members of the working group,
to the Chair of the Regional Forum and to UNIDO.
Coordinators of the countries
involved in the cement sector
identified and work program
started.
11. Endorsement Letters for the medium-sized
project entitled “Regional plan for the Introduction
of BAT/BEP strategies to industrial clusters of Annex
C of Article 5 sectors in the ESEA Region” are
submitted.
Endorsement
letters
submitted on or before the
end of March 2009.
PIF submitted to GEF for
consideration
Fully achieved.
GEF has approved the PIF
of the MSP project and will
provide the PPG funds.
Project Document is under
preparation.