TOWNSHIP OF BERNARDS SEWERAGE AUTHORITY
OPERATOR’S REPORT
January 2008 Meeting
December 2007 Report
FLOWS
Total Flow
Average Flow
Maximum Flow
Minimum Flow
71,855,000
2,318,000
4,392,000
1,407,000
Gallons
Gallons
Gallons
Gallons
OPERATION
Suspended Solids
Dry Weight
NJDEP Limit
Influent
1321 Kg
Effluent
25 Kg
Net
1296 Kg
Suspended Solids In Effluent 3.2 Mg/l
280 Kg/Day
85%
30 Mg/l
CBOD
Influent
Effluent
Net
CBOD in Effluent
98.1
% Removed
Dry Weight
828
23
805
2.9
Kg
Kg
Kg
Mg/l
Phosphorus
Dry Weight
Influent
Effluent
Net
Phosphorus in Effluent
22.5
15.4
7.1
2.0
Kg
Kg
Kg
Mg/l
NJDEP Limit
97.2 % Removed
75.7 Kg/Day
85%
8 Mg/l
NJDEP Limit
31.6 % Removed
5.2 Mg/l
Remarks
Hypochlorite Used: 762 Gal. Sulfur Dioxide Used: 721 Lb.
Influent pH: 7.6 S.U.
Effluent pH: 7.5 S.U.
Total Precipitation 9.25 Inches
Comments
This month we TV’d 23 Roads (Annin Road, Battle Hill Road, Beechwood Road, Belle
Grove Court, Berkeley Circle, Cameron Court, Cedar Creek Drive, Conkling Street,
Courtier Street, Cross Road, Evergreen Place, Flintlock Court, Kinnan Way, Lexington
1
Road, Morrison Street, North Alward Avenue, North Brook Avenue, Ridge Street,
Schindler Drive, Stone Hedge Drive North & South, Washington Avenue, & William
Street). Located manholes for Hatch Mott MacDonald on Acken Road, Allen Road,
Culberson Road. Verizon repaired Madisonville Road alarm lines. Cleaned Annin Road
& Valley Road wet well. Checked syphons. Installed riser ring in manhole HBW-22-02
on North Brook Avenue. Repaired manhole SM-00-02 with Rapid Seal wrap system.
Demeter Electric replaced the cross arms on the main electric pole at the plant. Exercised
plant and station generators. Painted boiler room floor. Started painting blower room..
We continue to meet permit parameters without any problems.
SAFETY
Safety inspection performed by PMK / EJIF
Monthly fire extinguisher checks completed.
Attended NJUA Safety meeting.
PROJECTS
Plant Electrical System Analysis Contract – CDI: Generator and transfer switch
information supplied to service companies for service quotations.
Juniper Way Pump Station – Under construction- CFM; T&M Associates: No report
SCADA System – Morehouse Engineering: Sub-committee meeting 1-17-08
I&I - Preconstruction meeting with Jo-Med on 1-15-08
Signature
2