Cheat Sheet for Excel Graph

advertisement
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
1
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
A. Information you need to set up a graph:
1. Time period for graph – school year, quarter, semester, 2-3 months, 1 month
2. How often will you collect data – 2-3 times per week, weekly
3. What is the possible range of scores – 0 to what number? : Look at student’s
present level of performance, goal for end of time period, and peers’ performance
level.
4. What subject area will be measured
5. What is the measurement unit that will be used (number of correct words read
correctly in one minute, number of correct vocabulary matches in five minutes,
etc.)
B. Steps to creating a new graph:
1. Open Microsoft Excel
If a new spreadsheet does not appear, go under File and select New.
2. In column A enter three dates into cells to show the pattern you want for this graph.
(The program will recognize that you are doing dates if you enter them in in this
format: Sep 1 – first three letters of the month, NO period after the abbreviation,
space, then the number for the date)
Click in the last box of the three dates you entered, then this “cell” should be
highlighted. Place the cursor over the small square in the bottom right corner of
that box (your cursor should now be in the shape of a square), click on it and hold.
Drag the cursor down to fill in additional dates. Stop holding the mouse button
when you reach the last date you want.
Move back up to the first date in this list. Click and hold cursor in that first cell.
Now press and hold the Control button. As you are holding down the control
button (and you still are holding down the click on the mouse), drag the cursor
down your list of dates until all of the dates are highlighted. Release mouse and
control button.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
2
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
Now with this list of dates highlighted, go under Edit to Fill and select Series. See
picture below.
A pop-up menu will appear that looks like this:
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
3
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
The only change you need to make on this pop-up menu is to change the Date
Unit (3rd box) from Day to Weekday. This will give you only Monday through
Friday. Click OK.
Troubleshooting: If this did not work there are two commons reasons, try it again
paying close attention to these: 1) be sure that you are holding down the control
button when you select the dates. 2) The dates must be highlighted when you go
to the Edit menu to select Fill and Series.
3. Highlight all of the dates and columns B and C for those dates. (To do this, click
and hold as you drag down your list of dates and move over to the right to get
columns B and C highlighted.
Go all the way down to the last
date
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
4
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
4. Click on chart wizard button located in the menu above the spreadsheet.
This is the menu bar to look for at the top of the page.
5. On the pop-up screen in the standard types section, click on line
6. Choose the style of line graph that shows the data points, like this:
Press Next button.
7. On the next pop-up screen look at the miniature graph and be sure that the dates are
running along the bottom of the graph (horizontal axis). If it isn’t change the
button that is selected (Rows or Columns button)
Press Next button.
8. The next pop-up screen has many things for you to add or change.
Notice the tabs that stick up and look like recipe cards – we will go to most of
those sections and fill in things.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
First, the Title section:
10. Click on the word Titles if it is not the top card.
Fill in Chart title – most of the time this will simply be the academic subject area
like Reading, Writing, Math.
11. Category or x- axis is where the dates will be so just type in the word Dates.
12. Value or y-axis is where you will write the measure you are recording, for example:
number of words read correctly in one minute, or number of digits correct in two
minutes, etc.
13. Click on Axes. This should come up automatically set for you. Check to see if
category (x) axis and value (y) axis are checked. Under Category (x) axis automatic
should be checked.
14. Click on Gridlines. Checks should be for major gridlines for x and y axes. I would
recommend also selecting minor gridlines for x axis.
15. Click on Legend. If you are graphing only one student, deselect the legend by
clicking on the check mark to turn it off. If you have more than one student on the
graph you will need the legend to identify which line goes with which student.
D:\687299637.doc
5
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
6
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
16. You don’t need to make any changes on the other two, so you can click Next. Data
Labels allows you to have the number printed on the graph next to the data point.
Data Table allows you to print out the data sheet along with the graph.
Press Next button.
17. The next screen asks you about placement of the chart. Click the button for as new
sheet and fill in a name for the graph, such as: “John’s graph”.
Press Finish button.
18. The graph is basically done at this point. One other change I would recommend
making is to place the cursor on the gray section of the graph (the background color)
and double clicking. A Format Plot Area screen will come up in the Area section
click on the white square to select a white background then click Ok.
19. To make further changes on the graph, go to Chart on the top menu. Select Chart type
to change from a line graph to some other kind, or Chart Options to change title, axes,
gridlines, legend, etc.
20. Changing the scale or the numbers along the side of the graph:
a. To change numbers along the y or vertical axis: place the cursor along the
numbers on the y axis and Value axis should appear in a box, double click.
The pop-up screen will allow you to change several things. Click on the card
that says Scale, then you can set the minimum and maximum numbers, most
common is probably 0 to 100. You can also set what the major and minor
units will be. Most common would probably be major units of 5 with minor
units of 1. To get a large enough graph so you can do this you need to go
under File and select Page Setup. Then select margins and change the margins
to .25 for top, bottom, and sides.
b. You can also change the way the dates appear across the bottom of the graph.
I think the best way is to have just the Mondays dates showing and then lines
for the rest of the days of the week. This is how most of our graphs look.
To Do this:
Double click along the x or horizontal axis. You will get a pop up screen that
looks like this:
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
You want the Major unit to say 7 – 7 days in a week
And the Minor unit should say 1 – each day showing. Click OK.
21. SAVE graph! I would suggest saving the graph as John-Reading.
22. Notice at the bottom of the screen for the data sheet and graph you have tabs that
look like this:
D:\687299637.doc
7
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
8
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
23. Double click on Sheet 1, the words “sheet 1” will become highlighted. Type in
“John’s data”. Then when you need to add data you can go straight to this sheet.
24. Double click on chart 1, this will become highlighted. Type in “John’s graph”.
25. Then SAVE again.
C. Adding data to an existing graph (without having to create a whole new graph by
repeating the steps above)
1. Open the file for that student, for example John-Reading as said above.
2. Look along the bottom of the screen for the data sheet for that student, for
example John’s data as said above. Click on that tab.
3. Add data to the spreadsheet for the corresponding dates.
4. Do a SAVE
5. Click on the tab for John’s graph. This will take you to John’s graph. Duh! You
should see the changes you added to the data sheet appear on this graph.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
9
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
D. Adding Goal lines and intervention lines
1. intervention and goal lines must be added using the drawing tools. That is why
it is very important to make your graph for the whole time period right from
the start. If you add dates, they will be added to your graph but the goal line
and intervention lines will stay the same and that will mess up your graph.
You can change the goal line but it means adjusting it every time you add a
day.
2. This is the drawing tool palette that you will use:
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
10
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
To get this palette go under View, Toolbars, select Drawing:
3. Select the line drawing tool
from this drawing tool palette.
4. draw the line from the median baseline score to the goal at the end of the time
period
5. While this line is still highlighted (or click once on it to highlight it again –
when the line is highlighted you will see a square at each end)
Select the color and thickness you want for the line:
line thickness
line color
6. Do the same thing for intervention lines, drawing vertical lines on the date that
the intervention began. I would recommend different colors of lines for
intervention and goal lines.
7. To add words to describe your interventions, go to the text writing tool also on
the drawing palette.
D:\687299637.doc
. Place the words next to your intervention line.
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
11
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
How to add trend line: Under Chart select add trend line. A pop up screen will appear.
Select a linear trend line. Select OK. The trend line will be done for all of the data on the
graph.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
12
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
Making a graph from a template.
You can get some templates of graphs from the SCRED website under special
education (www.scred.k12.mn.us)
1. Download the template to your computer.
2. Open the template.
3. Right away do a Save As and name it something else, this way you will still have
the original graph template on your computer.
4. To make changes to this graph, such as the Title, the labels for the axes, the style
of graph, the legend you will need to go under Chart which is in the top menu bar.
5. To change the type of graph – go to columns, pie chart or some other style: go to
Chart, then Chart Type.
6. These are the different charts you can choose from.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
13
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
7. To make other changes, go to Chart, then Chart Options
8. This pop-up screen has many things for you to add or change.
Notice the tabs that stick up and look like recipe cards – we will go to most of
those sections and fill in things.
First, the Title section:
10. Click on the word Titles if it is not the top card.
Fill in Chart title – most of the time this will simply be the academic subject area
like Reading, Writing, Math.
11. Category or x- axis is where the dates will be so just type in the word Dates.
12. Value or y-axis is where you will write the measure you are recording, for example:
number of words read correctly in one minute, or number of digits correct in two
minutes, etc.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
14
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
13. Click on Axes. This should come up automatically set for you. Check to see if
category (x) axis and value (y) axis are checked. Under Category (x) axis automatic
should be checked.
14. Click on Gridlines. Checks should be for major gridlines for x and y axes. I would
recommend also selecting minor gridlines for x axis.
15. Click on Legend. If you are graphing only one student, deselect the legend by
clicking on the check mark to turn it off. If you have more than one student on the
graph you will need the legend to identify which line goes with which student.
16. You don’t need to make any changes on the other two, so you can click Next. Data
Labels allows you to have the number printed on the graph next to the data point.
Data Table allows you to print out the data sheet along with the graph.
Press Next button.
17. The next screen asks you about placement of the chart. Click the button for as new
sheet and fill in a name for the graph, such as: “John’s graph”.
Press Finish button.
18. The graph is basically done at this point. One other change I would recommend
making is to place the cursor on the gray section of the graph (the background color)
and double clicking. A Format Plot Area screen will come up in the Area section
click on the white square to select a white background then click Ok.
19. To make further changes on the graph, go to Chart on the top menu. Select Chart type
to change from a line graph to some other kind, or Chart Options to change title, axes,
gridlines, legend, etc.
20. Changing the scale or the numbers along the side of the graph:
c. To change numbers along the y or vertical axis: place the cursor along the
numbers on the y axis and Value axis should appear in a box, double click.
The pop-up screen will allow you to change several things. Click on the card
that says Scale, then you can set the minimum and maximum numbers, most
common is probably 0 to 100. You can also set what the major and minor
units will be. Most common would probably be major units of 5 with minor
units of 1. To get a large enough graph so you can do this you need to go
under File and select Page Setup. Then select margins and change the margins
to .25 for top, bottom, and sides.
d. You can also change the way the dates appear across the bottom of the graph.
I think the best way is to have just the Mondays dates showing and then lines
for the rest of the days of the week. This is how most of our graphs look.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
15
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
To Do this:
Double click along the x or horizontal axis. You will get a pop up screen that
looks like this:
You want the Major unit to say 7 – 7 days in a week
And the Minor unit should say 1 – each day showing. Click OK.
21. SAVE graph! I would suggest saving the graph as John-Reading.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
16
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
Making a graph for steps for a procedure or speech.
1. Open 3consecutivetrials.xls
2. Immediately do a save as and change the name of the file.
3. Open the worksheet with the data (the spreadsheet).
4. You can click in the boxes to change the labels for the times you give the
measurements. In this example the student is measured 3 times a month.
When you click in the box the information that is already in this box will show up
in this area:
Formula bar
To change something that is already written there, put your cursor in the box
above (officially it’s called the formula bar)
5. You can then change the number of trials the student will get by clicking in those
boxes and writing over it in the formula bar.
6. When you go back over to the graph sheet, you should see the changes you made.
D:\687299637.doc
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
How to get the lines to show up between your data points.
If you are in OS 9:
Have a graph opened when you do these steps.
Under Edit select Preferences.
A box like the one below will appear.
Click on the card that says Chart to make that the top card.
D:\687299637.doc
17
Cheat Sheet for using Excel to Make Graphs
Updated 2/6/16
18
Barb Scierka SCRED 320 358-3616 or 651 674-2436 or bscierka@scred.k12.mn.us
Select the button that says ‘interpolated’. This will give you the lines connecting dots
that are spread out. If the buttons cannot be pressed, it is because you did not have a
graph open when you went to Edit and Preferences. Cancel out of this, open a graph,
then go under Edit.
If you are in OS 10:
Have a graph opened when you do these steps.
Under Excel select Preferences.
In the left hand list – select Chart. In the right hand list select ‘interpolated’. Click
Okay
D:\687299637.doc
Download