PRM020/1 DEPARTMENT OF PUBLIC WORKS INPUT OF ESTIMATE TYPE 3 TO 6 ON WCS 1. From main WCS menu select 5. Contract and Estimates and ENTER 2. Select 1. Contract and Estimates and ENTER 3. Select 4. Add/Modify Contract Estimates Types 3 to 6 (WD04PU) and ENTER: Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7: Step 8: Step 9: Step 10*: Step 11: 02= 03= 04= 05= 06= 07= 08= 09= 11= Step 12: Step 13: Step 14*: Step 15: 4. Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7: Step 8: Step 9: WCS No and ENTER Next-in-line Estimate type/no and ENTER Change Contract descriptions if required and TAB Revise Contract time if required and TAB (Contract time to include 35 days for submission and acceptance of sureties and handing over of site) Revise Contract type if required and TAB Estimate date (JJJJ/MM/DD) Project to (tender) date (JJJJ/MM/DD) Any short description, e.g. Erection/Repairs and Renovations.Etc. and TAB Value of building work and TAB * for automatic calculation of VAT and TAB Distribution code: The first field defaulted to 01. The other four fields will accept any of the following codes: Adjustment (In case of too high estimate, adjustment is the theoretical amount the estimate must be cut with to bring it inline with accepted limits CPAP (Contract Price Adjustment Provisions), If * is entered in amount column, CPAP is automatically calculated. Incidental expenditure (Default = R100 000) Building work (if field 01 was used for something else) Electrical work Mechanical work Civil work Sundry Training If description is that of values 02 - 09, the system will default to description, TAB Value of work for particular field, TAB * for automatic calculation of VAT ENTER ® RECORD(S) SUCCESSFULLY PROCESSED Enter F2 to return to Contract and Estimates Menu: Select 1 Add/Update: Estimates and ENTER As WCS No and Estimate type already on WCS, ENTER If estimate date correct, TAB Cost Limit Y/N, TAB Enter cost limit amount, TAB Enter Building estimate (PQS fee purposes) - 80% of Building work excl VAT, CPAP,TAB Space limit Y/N, TAB and Building estimate date (JJJJ/MM/DD) Estimate complete Y, ENTER Estimate now ready to be accepted by financial/budget section and must be submitted as such to them. PRM020/2 STEP 15 OPWWBS WD04PU PUBLIC WORKS: ELECTRICAL ENGINEERS 97-07-15 12:17 ADD/MODIFY CONTACTS & ESTIMATE TYPES 3 TO 6 WD04PUE1 STEP 1 ----------------------------------------------------------------------------------------------------------------------------------WCS-number : 010819 H KZN (CAT)4 DESIGN STAGE PIETERMA,,NAPIERVILLE PRI, 9 DWELLINGS, 82 FLATS AND SINGLE QUARTERS FOR 129 Contract number : 0002 Contract Afr desc : ELEKTRIESE INSTALLASIE Contract Eng desc : ELECTRICAL INSTALLATION STEP 3 Service type : HBWGH Division code : 110 - ELECTRICAL ENGINEERS STEP 5 Contract time STEP 4 : 30.00 months *Contract type : 3 - COMPREHENSIVE CO STEP 2: 35 DAYS Estimate type/no : 5 / 02 PRE-TENDER ESTIMATE File no : Estimate date : 1997/04/02 STEP 6 Project to date :1997/03/01 STEP 7 Captured: BEAURAIN C Updated: Update date: *DISTR. CODE AND DESCRIPTION AMOUNT STEP 9 VAT TOTAL 01 ELECT INSTALLATION STEP 8 2180543.00 305276.02 2485819.02 STEP 11 TOTAL :...................... 2180543.00 305276.02 2485819.02 03 CPAP _________ STEP 12 235157.93 STEP 13 30270.17 STEP 14 265428.10 ** GRAND TOTAL: 24157000.93 335546.19 2751247.12 ** PROJECTED: 2421455.13 336345.46 2757800.59 __ ______________________ ____________ _________ __________ __ ______________________ ____________ _________ __________ __ ______________________ ____________ _________ __________ __ ______________________ ____________ _________ __________ PRM020/3 1.1 2.2 3.3 4.4 5. 6. 7. 8. 9. 10. 11. 12. 13. CONTRACT TYPES CONTRACT NOMINATED SUB-CONT COMPREHENSIVE CONT DIRECT CONTRACT SUPPLY-SERVICE (OR 5 12:17 04PUE1 FOR 129 SIVE CO CHOICE START : 0-: 1------- AL 5819.02 5819.02 5428.10 ** GRAND TOTAL : 2415700.93 335546.19 2751247.12 ** PROJECTED : 2421455.13 336345.46 2757800.59 __ ____________________ _________ _________ __________ Enter-PF1---PF2---PF3---PF4---PF5---PF6---PF7---PF8---PF9---PF10---PF11---PF12---EXIT PRM020/4 OPWWBS PUBLIC WORKS: ELECTRICAL ENGINEERS 97-07-15 12:16 WD01PU STEP 1 ADD/UPDATE: ESTIMATES (MAIN SCREEN AND SUMMARY) WD01PUE1 STEP 2 ----------------------------------------------------------------------------------------------------------------------------------WCS-Number : 010819 H KZN (CAT)4 DESIGN STAGE PIETERMA,,NAPIERVILLE PRI, 9 DWELLINGS, 82 FLATS AND SINGLE QUARTERS FOR 129 Service type : HBWGH ERECTION : HOUSING (BILLS OF Q Contr. Time: __30.00 mt Division code : 110 ELECTRICAL ENGI File number : 6221/0313/4P Estimate Type/No : 5 / 02 PRE-TENDER ESTIMATE Estimate date : 1997/04/02 STEP 3 Projected to : 199703 YYYY/MM Estimate amount : 30432247.14 Projected amount : 30504736.75 Nett Div. Amount : 2751247.12 Div. Estimate project : 2757800.59 TSM approved : SCU approved : GSM approved : SATISFY STEP 4 AMOUNT FORCost limit Y / N :N STEP 5 Building est. VAT ecxl : STEP 6 Space limit Y / N :N STEP 7 Building est. Date : STEP 8 Estimate complete :N STEP 9 Complete date : Estimate accepted :N Accepted date : Comments : Captured: BURGER M Updated: BEAURAIN C Date: 97/04/07 -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------