Regression Analysis Assignment

advertisement
Analyzing Cost Behavior
Part 1: Data Set and High-low method
Enter the following data on a new Excel Spreadsheet and then save the file. Do not enter
commas or dollar signs. Just type in the plain numbers. Once you have typed in the plain
numbers, you can format them anyway you want by using the “Number” options shown in the
middle of the top toolbar. Simply highlight your cost data (using your cursor) and then choose
“currency” from the drop down list of formatting options (the default is “general”). To get rid
of the extra decimal places, simply click on the “decrease decimal” icon that is directly below the
drop down list. Use the comma icon to format the machine hour data with commas.
Month
January
February
March
April
May
June
July
August
Sept
October
November
December
Number
of
Batches
309
128
249
159
216
174
264
162
147
219
303
107
Manufacturing
Overhead
(MOH)
$84,000
$41,000
$63,000
$44,000
$44,000
$48,000
$66,000
$46,000
$33,000
$66,000
$81,000
$41,000
Machine
Hours
3,800
2,400
2,850
2,100
2,700
2,250
3,800
3,600
1,850
3,300
3,750
2,000
Verify that you have input the data correctly by checking the totals in each column against the
totals shown below. Don’t check with a calculator. Here’s the easy way: simply highlight a
column of data with your cursor. Now look at the very bottom right of your screen. Excel tells
you the average, count, and sum of the numbers you have highlighted. The sum should agree to
the totals shown below:
Totals
2,437
$657,000
34,400
Alternatively, you can use the “auto sum” (Σ) feature. Simply click your cursor on the cell
directly below your column of data and then click on the auto sum button shown on the right
hand side of the top tool bar. It shows the range of numbers to be added. Click again, and it
inserts the sum. Once you know the sum is correct, be sure to delete it.

On the data page, use the High-low method to determine the cost equation relating the monthly
MOH costs to the number of batches produced. First, highlight the 2 months you will using (the
highlight icon looks like a spilling paint bucket). When you calculate the variable and fixed
components, be sure to round off the answers to the nearest cent. Write the cost equation and
define the variables (x = ?; y = ?). Remember, this is in dollars and cents, so use proper
formatting. Circle or box in your answer. Then use your cost equation to predict total MOH costs if
130 batches are produced during one month. Again, circle or box in your answer.
Part 2: Scatter plot and regression line using “Number of Batches” as the cost driver

Follow the directions in the textbook (p. 314 of Braun, 2e) for creating a scatter plot using
Excel 2007, as shown below:
1) In an Excel spreadsheet, list the volume data in one column and the associated cost data in the
next column.
2) Highlight all of the volume and cost data with the cursor.
3) Click on the “insert” tab on the menu bar and then choose “Scatter” as the chart type. Next,
click the plain scatter plot (without any lines).
4) You’ll now see the scatter plot on the page. You can choose “Move chart location” on the
menu bar to move the chart to a new sheet (so that it’s nice and big).
5) From the “Chart Layout” menu tab, choose “layout 1.” Add a descriptive title for the scatter
plot and appropriate labels for each axis by clicking on the Chart Title and Axis Titles and
typing in your own titles.
6) You can delete the “Series 1” legend beside the graph by RIGHT clicking on it and then deleting.

Do you see any potential outliers? If so, point them out (circle or point to them). If not,
say so on the graph (e.g., no outliers appear to be present). You can use the “insert”
“textbox” on the top menu to write in any comments. Even if you see potential outliers,
continue to use the full data set in the following analysis.

To add the actual regression line to the scatterplot, place your pointer on any data point on the
graph and RIGHT click your mouse. Choose Add Trendline, choose Linear, Close.

Note that the regression line doesn’t go back to the y-axis. To make it stretch back to the yaxis, put your pointer on the line and RIGHT click the mouse. Choose format trendline, then
look at the forecast backward box. This feature allows you to extend the line back towards the
y-axis as far as you want to go. Therefore, you need to see what your lowest x value is on your
data set and input that number. In other words, you want to go back from your lowest x value to
x=0. So, go ahead and input your lowest x value (lowest number of batches). Then Close. Now
look at your graph: the regression line should stretch all the way back to the y-axis. If it doesn’t
(or if it goes past the y-axis), you didn’t input the correct number.

Once again, put your pointer on the line and RIGHT click. Choose format trendline and check
mark the two boxes: Display the equation on the chart and Display the R-squared value on
the chart. Close. The regression equation and R-square should now appear on the graph. Drag
the information box to a place on the graph where it doesn’t interfere with the line or data points.
Visual Check: Does the regression line intersect the y-axis at the level of fixed costs specified
by the regression equation? It should.

Label the regression line by using “insert” tab; “textbox”. Start the textbox next to the
regression line and drag it into a box shape. Then type in the label.
NOTE TO PROFESSORS: You may choose to have students skip Part 3 of this assignment.
Part 3 requires students to generate a full regression output and interpret the results. This step
fits in with our textbook presentation of regression analysis and interpretation of the Rsquared statistic (Braun, 2e, pgs 317-318). However, students already have the regression
equation and R-squared from the steps they performed above. If you delete this part of the
assignment, I would still suggest that you have students interpret the R-square figure and make
a cost projection based on the equation.
Part 3: Generate the regression output
 Go back to your data set by clicking on the “Sheet 1” tab at the bottom of the screen.

Follow the directions in the textbook (p. 318 of Braun, 2e) for running a regression analysis
using Excel 2007 (shown below):
1) Go to the Excel spreadsheet listing your volume and cost data.
2) Click on the “Data” tab on the menu bar. Next, click on “Data Analysis”. If you don’t see it on
your menu bar follow the DIRECTIONS FOR ADD-INS given next before continuing.
3) From the list of data analysis tools, select “regression,” then “OK”
4) Follow the two instructions on the screen: i) highlight the y-axis data range (this is your cost data)
and ii) highlight the x-axis data range (this is your volume data). Click “OK”
DIRECTIONS FOR ADD-INS: (to add the free Data Analysis Toolpak that comes with Excel)
5) Click on the Microsoft Office button (colorful button in upper-left corner of screen) and then
click on “Excel Options” at the bottom of the box.
6) From the list of options, click “add-ins”
7) At the bottom of the screen, select “Excel Add-ins” and click “GO”.
8) From the add-ins available, select “Analysis Toolpak” check box and then click “OK”
9) If asked, click “yes” to install.

Type in the following directly below the regression output:
1) The regression cost equation. Remember, these are in dollars and cents, so format
correctly and round off to the nearest cent (If you leave extra decimal places, I’ll take
points off.) Be sure to define the variables (x = ?, y = ?) in your equation
2) A projection of what the MOH cost would be at an activity level of 130 batches.
3) Interpret the R square figure given in the output.
i. In general, what does the R-square statistic tell you?
ii. What is the R-square value from this regression and what does it tell you
about this particular set of data?
iii. What does this R-square tell you about the accuracy of any predictions made
using this equation?
NOTE: You may have to wrap the text to make sure it all fits on the page.
Part 4- High-low line

You are now going to add the correct high-low line to the scatter plot, so go back to the Scatter
plot by clicking on “Chart 1” tab at the bottom of the screen. Remember, the high-low method
is based on two data points: the highest volume and lowest volume data points. You have two
choices here:
1. Print the page and HAND-DRAW the high-low line. If you take this route, you’ll lose 1
point on the assignment.
2. To avoid losing 1 point, learn how to draw a line on the scatter plot using Excel. First, click
anywhere on your scatter plot to make sure you have the “chart tools” as your top tool bar.
Then, on the insert tab, click on shapes. The drop-down menu on insert shapes gives you a
lot of shape options. Click on the straight line in the top box. Now, put your cursor on the
graph and “drag” in a line through the high and low-volume points, and all the way back to
the y-axis.
3. You’ll know you’ve got the correct line if it intersects the y-axis at the fixed cost value
specified by your high-low cost equation.
4. Label the line as the High-low line, using the “insert” tab; “textbox”.
You can either handwrite these explanations, or use the “insert; textbox” to type them in.
 On the graph, explain why the regression and high-low lines differ.
 Comment on which line is more representative of the data set.
NOTE TO PROFESSORS: Part 5 requires students to create a scatter plot, high-low line, and
regression line using MACHINE HOURS as the cost driver (rather than number of batches). I
intentionally added one wrinkle to the data set: Both January and July have an identical
number of machine hours (3,800). Students need to engage in critical thinking to determine
which of the two months to use for the “high” month for the high-low method. If students
erroneously choose January, they will end up with negative fixed costs due to the steep slope of
the line. However, if they correctly choose July, they will end up with positive fixed costs. You
can easily remove this issue from the data set by changing January’s machine hours to a
slightly lower number (e.g., 3,750). If you do so, the regression equation will be slightly
different than the solution file indicates.
Part 5- Create Scatter plot, regression line, and high-low line using Number of Machine
Hours as the cost driver.
 Go back to your data page by clicking on the “Sheet 1” tab at the bottom of the screen.
 Create a new scatter plot, using “number of machine hours” as the cost driver. Put it on a
new sheet, just like before. (Hint: you’ll probably need to copy the MOH costs into the
column to the right of “machine hours” before you can create the new scatter plot.)
 Give the scatter plot a title, label both axes, put in the regression line and label, and put in the
regression equation and R-square, using the same steps described above.
 Add the correct high-low line (yes, I know 2 months have the same HIGH number of
machine hours. But when you draw the line, one will make sense while the other won’t.
Use the one that makes sense!)
 Somewhere on the graph, answer the following question using insert; textbox: If you were
management, would you use 1) number of batches, or 2) number of machine hours as the
cost driver in the equation. WHY?? Is there anything in particular that helped you make
this decision?
PRINT AND TURN IN THE FOLLOWING PAGES:
Page 1: Data set; high-low cost equation; prediction using the high-low cost equation
Page 2: Chart 1 (graphs using number of batches as cost driver)
Page 3: Regression output page
Page 4: Chart 2 (graphs using number of machine hours as cost driver)
Page 5: This page (grading rubric)- 2 points will be deducted if you don’t include this page.
Regression Assignment grading rubric- 40 pts possible
Points possible (x)
Deductions
Part 1: Data set and high-low method
1. Data properly formatted with $ signs and commas; correct 2 months
highlighted? (3)
2. Properly formatted high-low equation with x and y variables defined (4)
3. Prediction for 130 batches (2)
Part 2: Scatter plot and regression line using batches
4. Descriptive title (1)
5. Both axes labeled (2)
6. Comment on possible outliers (1)
7. Regression line (1) and label (1)
8. Equation and R-squared shown (1)
9. H/L line computer generated (1) and labeled (1)
10. Explanation of why lines differ and which is more representative (2)
Part 3: Regression output
11 Correct output (1)
12. Cost Equation with x and y variables defined (4)
13. Prediction for 130 batches (1)
14. R-square interpretation:
-in general (2 pt)
- R-square from this regression & what it tells you about the data set (2)
-confidence in the equation for making predictions (1)
Part 4: Scatter plot and regression line using machine hours
15. Scatter plot with title and axes labeled (3)
16. Regression line and label (1); equation and R-square (1)
17. Correct high-low line and label (2)
18. Management choice of cost driver and explanation (2)
General presentation and following instructions: Points will be deducted
for incomplete sentences, spelling errors, sloppy presentation, answers not
rounded to the nearest cent, pages not stapled in the correct order, etc.
Be sure to put your name at the top of the first page!