TOWN OF TOLLAND FY 2012 - 2013 through 2016 - 2017 Town Manager’s Five Year Capital Plan February 23, 2012 CAPITAL BUDGET Everything the Town does, from providing services to its residents and citizens, to equipping employees to effectively perform their jobs, requires the existence of certain basic physical assets. Assets include: Streets School Facilities Parks Large Equipment Buildings Technology Assets must be purchased, maintained and replaced on a timely basis or their usefulness in providing public services will diminish. The Town’s Five Year Capital Improvement Program is developed to ensure adequate capital investment in the Town’s assets and to provide an orderly method for funding these assets. WHAT IS A CAPITAL ITEM? Definition of Capital Projects: Any project, to be included in the Town’s Capital Improvement Program, should fall into one of the following three program categories: 1. Any new or expanded physical facility, including preliminary design and related professional services. 2. Land or property acquisition. 3. Items of a non-recurring nature where the benefits are realized over a long period of time. A project should also exhibit the following characteristics to be included in the Capital Improvement Program: 1. Life Expectancy: The project’s outcome, non-recurring in nature, should have a useful life of greater than eight years. 2. Cost: Cost should be a relatively high, non-operative expenditure for the Town; generally in excess of $10,000 for equipment or plant facility improvements. CAPITAL BUDGET PLANNING PROCESS Activity Capital budget requests submitted to Town Manager. Dates October 27, 2011 Preliminary Capital Budget Committee Review and Month of November, 2011 Department Head meetings. Board of Education Superintendent and School Facilities Director were included in meetings. Manager submits Capital Program to Council. December 19, 2011 Manager submits revised Capital Program to Council with recommended General Fund Budget. March 13, 2012 Town Council approves recommended Capital Program as part of Council’s Proposed Budget. April 3, 2012 Capital Program as amended is part of Budget Referendum process. May 1, 2012 Revisions To Capital Budget After Submission by Town Manager to Town Council on December 21, 2011 • Reduced the General Fund portion of the Capital Budget by $86,014 with the result being the replacement of the skylight at the Intermediate School and the purchase of additional security cameras at various schools are being moved to the second year of the plan or possibly being done with other revenue sources and a used generator shall be purchased at the Senior Center rather than a new one. TYPES OF FUNDING METHODS General Fund Contributions Capital Non-Recurring Fund Non-Referendum Notes Local Capital Improvement Plan Grant (State) Town Aid to Road Grant (State) State School Construction Grants and other State Grants Ambulance Fees Cemetery Funds Referendum Borrowing Unallocated Capital Hicks Trust YEAR 1 CAPITAL BUDGET SUMMARY FISCAL YEAR 2012-2013 YEAR 1 CAPITAL BUDGET FUNDING SOURCES CAPITAL BUDGET Existing General CNRE Recreation Non Refer LOCIP TAR State & School Ambul Hicks Unall Other Funding FUNDING CATEGORIES Funds Fund Fund Special Refer Notes Grant Grant Federal Const Reserve Trust Capital Funding Totals Revenue Notes Grants Grant Reserve Sources Contrib PROJECTED AVAILABILITY OF CAPITAL FUNDS =======> 255,591 231,877 59,000 0 1,567,600 0 120,000 250,000 394,350 0 404,383 0 0 100,948 3,383,749 0 48,877 0 0 0 0 0 0 0 0 0 0 0 0 48,877 Parker School 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Tolland Intermediate School 0 0 0 0 544,000 0 0 0 0 0 0 0 0 0 544,000 Tolland Middle School 0 0 0 0 115,000 0 0 0 0 0 0 0 0 0 115,000 Tolland High School 0 0 0 0 300,000 0 0 0 0 0 0 0 0 0 300,000 District-Wide 0 0 0 0 0 0 0 0 0 0 0 0 0 10,000 10,000 0 158,000 44,000 0 0 0 0 0 0 0 0 0 0 38,500 240,500 0 0 0 0 0 0 0 0 0 0 301,049 0 0 13,951 315,000 55,384 0 0 0 0 0 0 0 394,350 0 0 0 0 0 449,734 140,000 0 15,000 0 30,000 0 0 0 0 0 0 0 0 38,497 223,497 60,207 25,000 0 0 148,600 0 50,000 0 0 0 0 0 0 0 283,807 0 0 0 0 430,000 0 70,000 250,000 0 0 0 0 0 0 750,000 255,591 231,877 59,000 0 1,567,600 0 120,000 250,000 394,350 0 301,049 0 0 100,948 3,280,415 0 0 0 0 0 0 0 0 0 0 103,334 0 0 0 103,334 TOWN ADMINISTRATION Town Administration BOARD OF EDUCATION CAPITAL EQUIPMENT Capital Equipment FIRE AND AMBULANCE Fire and Ambulance PARKS AND RECREATION Parks and Recreation PUBLIC FACILITIES Public Facilities STREETS AND ROADS Construction and Reconstruction Pavement Management SUMMARY PROJECT TOTALS FUNDING SOURCE VARIANCES FY12-13: SIGNIFICANT CAPITAL PROJECTS FUNDED BY THE GENERAL FUND Total Amount: $231,877 Town Administration: • Reserve for current year depreciation for municipal vehicle replacement - $27,877. Vehicles scheduled to be replaced are Building Inspector’s Jeep and the Highway pick-up truck. Board of Education: • Replacement of 1998 GMC ½ ton pick-up with 2012 ½ ton pick-up - $25,000. FY12-13: SIGNIFICANT CAPITAL PROJECTS FUNDED BY THE GENERAL FUND Total Amount: $231,877 Capital Equipment: • Dump Truck #28 Replacement – Replace 1997 Ford truck which is a front-line vehicle. Truck includes plow and sander - $145,000 Streets & Roads: • Drainage Design priority is the paved portion of Johnson Road (1,300 feet of road) including design of catch basins - $25,000 FY12-13: SIGNIFICANT CAPITAL PROJECTS FUNDED BY OTHER SOURCES Board of Education: Tolland Intermediate School: • Removal and Replacement of Asbestos Floor Tile - $414,000 • Driveway and Parking Lot Paving - $130,000 (Non-referendum notes) Tolland Middle School: • Track Resurfacing - $115,000 (Non-referendum notes) Tolland High School: • Lights for stadium field - $300,000 Town to be reimbursed through private donations (Non-referendum notes) FY12-13: SIGNIFICANT CAPITAL PROJECTS FUNDED BY OTHER SOURCES Capital Equipment: • Replacement of 1992 Dodge Ram Utility Body Dump Truck with Versa Lift - $57,000 (CNRE $44,000 and General Fund $13,000) Fire and Ambulance: • Service 140- $85,000 (Ambulance Fees) • Emergency Back-up Power Generators - $140,000 (Ambulance Fees) FY12-13: SIGNIFICANT CAPITAL PROJECTS FUNDED BY OTHER SOURCES Parks & Recreation: • Cross Farms Building with Bathrooms, Concession and Storage Area - $449,734 (State Grant and Existing Funds) Public Facilities: • Hicks Building Roof – Level 2 - $106,000 (Existing funds HVAC $100,000 and Senior Housing Project $6,000) • Study for Improvements for Library & Public Works- $30,000 (Non-referendum notes) FY12-13: SIGNIFICANT CAPITAL PROJECTS FUNDED BY OTHER SOURCES Streets & Roads: Construction and Reconstruction: • Miscellaneous drainage construction including culverts $148,600 (Non-referendum notes) and $50,000 (LOCIP) Pavement Management: • Road Maintenance - $230,000 (Non-referendum notes), $250,000 (TAR) and $70,000 (LOCIP) for a total of $550,000 • Parking Lot Paving - $100,000 (Non-referendum notes) • Neighborhood Roads - $100,000 (Non-referendum notes) Significant Projects in Years 2-5 By All Sources Year 2: Town Administration: Tolland Green Rte. 195 & 74 Corridor Improvements - $250,000 (Grant $225,000 and General Fund $25,000) Board of Education: Tolland Intermediate School: • Gym Door Removal - $54,000 (General Fund) • Skylight Replacement - $18,000 (General Fund) Tolland Middle School : • Gym Door Removal -$60,000 (General Fund) Significant Projects in Years 2-5 By All Sources Year 2, continued: District Wide: • Camera Upgrade and Base Equipment - $35,000 (General Fund $23,014 and other sources $11,986) Capital Equipment: Highway: • Replacement of Dump Truck #6 – 2000 Freightliner - $147,000 (Non-referendum notes) Fire and Ambulance: •Fire Gear - $25,000 (Ambulance Fees) Significant Projects in Years 2-5 By All Sources Year 2, continued: Parks & Recreation: • Renovations at Parker School - $40,000 (CNRE Fund) Public Facilities: • Station 140 Roof - $30,000 (General Fund) Streets & Road: • Drainage Infrastructure Johnson Road - $276,300 and Torry Road - $175,000 (Non-referendum notes) Significant Projects in Years 2-5 By All Sources Year 2, continued: Pavement Management: • $750,000 to address road maintenance, parking lot and neighborhood roads according to automated pavement management system recommendations ($480,000 – Non-referendum notes, $120,000 – LOCIP and $150,000 - TAR) Significant Projects in Years 2-5 By All Sources Year 3: Board of Education: Parker Memorial School: • • Roof Replacement - $575,300 (Non-referendum notes) Boiler - $625,000 (Non-referendum notes) Capital Equipment: Highway: • Replacement of Mower #2 (16’ cut) - $80,000 (General Fund) Significant Projects in Years 2-5 By All Sources Year 3, continued: Fire & Ambulance: • Ambulance 640 Replacement – $246,238 (Ambulance Fees) • Portable Diesel Generator – $40,000 (Ambulance Fees) Public Facilities: • Hicks Roof Levels 4 and 6 - $125,000 (General Fund) Significant Projects in Years 2-5 By All Sources Year 3, continued: Streets and Roads: • Johnson Road Reconstruction - $276,300 (Non-referendum notes) • Townwide Drainage Infrastructure - $75,000 (Non-referendum notes) Pavement Management: • $750,000 to address road maintenance, parking lot and neighborhood roads according to automated pavement management system recommendations. ($480,000 – Non-referendum notes, $120,000 – LOCIP and $150,000 - TAR) Significant Projects in Years 2-5 By All Sources Year 4: Town Administration: • Tolland Green Rte. 195 & 74 Corridor (Non-referendum Notes $250,000 and Grants $2,550,000) Board of Education: Birch Grove Primary School • Parking Lot Paving - $100,000 (Non-referendum Notes) Capital Equipment: • Replacement of 2002 CAT Backhoe - $120,000 (Non-referendum Notes) • Replacement of CAT Bucket Loader #16 - $169,000 (General Fund) Significant Projects in Years 2-5 By All Sources Year 4, continued: Fire: • Replacement of Rescue 240 - $625,000 (Ambulance Fees) Streets and Roads: • Drainage Construction - various - $50,000 (General Fund) Pavement Management: • $750,000 to address road maintenance, parking lot and neighborhood roads according to automated pavement management system recommendations. ($480,000 – Non-referendum notes, $120,000 – LOCIP and $150,000 – TAR) Significant Projects in Years 2-5 By All Sources: Year 5: Board of Education: Birch Grove Primary: • Parking lot paving phase 2 - $100,000 (Non-referendum Notes) Tolland High School: • Track resurfacing - $70,000 (General Fund) Capital Equipment: • Replacement of Dump Truck #32 - $155,000 (Non-referendum Notes) Significant Projects in Years 2-5 By All Sources: Year 5, continued: Capital Equipment Continued: • Replacement of 2003 11’ Toro 4000 Mower - $53,000 (General Fund) Fire and Ambulance: • Contribution to Emergency Service Equipment Reserve $150,000 (Ambulance Fees) Significant Projects in Years 2-5 By All Sources: Year 5, continued: Parks & Recreation: • Basketball Court at Heron Cove - $39,600 (General Fund) Streets & Roads: • $750,000 to address road maintenance, parking lot and neighborhood roads according to automated pavement management system recommendations. ($480,000 – Non-referendum Notes, $120,000 – LOCIP and $150,000 - TAR) DRAINAGE CONCERNS Drainage Infrastructure • Culvert Repair and Rehabilitation. • Culvert failure can result in sinkholes, flooding and roadway damage. Additional concerns related to culvert failures include costs associated with emergency repair work, damage to neighboring properties and motorists delays. • The Capital Budget is designed so that construction follows engineering design by 1 year. • Culverts have been prioritized based on their existing condition and history of flooding. DRAINAGE CONCERNS Continued • Stormwater Management Repair and Rehabilitation Several stormwater management structures require repair and/or reconstruction. These structures include detention basins, stormwater level spreaders and bio-retention areas. • Structures that have been poorly maintained, designed inadequately or have not been constructed appropriately are subject to erosion and sedimentation, resulting in deterioration and damage to adjacent properties and pollution of nearby streams and inland wetlands. • Additional drainage concerns focus on localized puddling in low areas of roadways. During excessive periods of rain or thaw/freeze cycles, these areas present a danger to pedestrians and motorists. PAST 5 YEAR GENERAL FUND CAPITAL CONTRIBUTIONS FY08 - $462,859 or 1.1% of Townwide Operating Budget FY09 - $506,037 or 1.1% of Townwide Operating Budget FY10 - $204,650 or .42% of Townwide Operating Budget FY11 - $266,700 or .54% of Townwide Operating Budget FY12 - $305,708 or .60% of Townwide Operating Budget FY13- $231,310 or .45% of Townwide Operating Budget Town Manager Proposed FY12 = $231,310 or 0.45% of Townwide Operating Budget Equipment Aging Schedule for Units Assigned to Parks & Facilities Garage Vehicle/Eqp # Description Year 2010 2011/2012 proposed 5 year CIP 2012 2013 2014 2015 2016 2011 updated as of 12/2010 2017 2018 2019 2020 2021 2022 2023 2024 Trucks: 64 TOL GMC 2500 40 TOL Ford F350 one ton 36 TOL Dodge W350 one ton 51 TOL Dodge W350 service 39 TOL Ford F800 Dump 63 TOL GMC 3500 70 TOL Ford F250 37 TOL GMC 3500 38 TOL Ford F550 61 TOL Ford F250 service 53 TOL Ford F450 68 TOL Ford F550 75 TOL 3/4 Ton Van (new) Scheduled Replacements: 36TOL Ford F450 39TOL 4 yd dump 63TOL Ford F450 1988 1989 1992 1993 1996 1999 2002 2003 2004 2006 2007 2007 2008 22 23 24 25 26 21 22 23 24 25 17 18 19 20 21 14 15 16 11 12 13 14 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 new 1 2 3 4 5 6 7 8 9 10 11 12 13 new 1 2 3 4 5 6 7 8 9 10 11 new 1 2 3 4 5 6 7 8 9 10 33 34 35 36 37 18 2011 2013 2014 Equipment: Line Painter Ford Tractor Skidsteer New Holland 553 Sweepstar Jacobsen mower/thrower Easy Rake Toro 72" Mower Lazer Lawnmower Gravely Snow Blower Gravely Snow Blower John Deere Tractor Easy Rake skidsteer New Holland180 4000 Lawnmower 580 Mower #2 Easy Rake Lazer Lawnmower Gravely Snow Blower Gravely Snow Blower Lazer Lawnmower Cat Loader Kubota tractor 4000 Lawnmower 580 Mower #1 Scheduled Replacements: skidsteer Easy Rake 580 Mower #2 Ford tractor 72" mower Jacobsen mower/thrower Generac generator 1978 1970 1986 1991 1996 1998 1992 1999 1999 1999 2001 2001 2002 2003 2005 2005 2005 2005 2007 2007 2007 2007 2007 2010 2012 2013 2014 2017 2017 2018 32 33 30 31 32 24 25 26 19 20 21 22 23 24 14 15 16 17 18 19 20 21 12 13 14 15 11 12 13 14 15 16 17 18 11 12 13 14 15 16 17 18 19 20 16 17 18 19 20 11 12 13 14 15 16 17 18 19 20 16 17 18 19 20 11 12 13 12 15 16 17 18 19 20 16 17 18 19 20 9 10 11 12 13 14 15 16 17 18 14 15 16 17 18 9 10 11 12 13 14 15 16 17 18 14 15 16 17 18 8 9 10 11 12 13 14 15 16 17 13 14 15 16 17 7 8 9 10 11 12 13 14 15 16 12 13 14 15 16 6 7 8 9 10 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 6 7 8 8 10 11 12 13 14 15 16 17 18 19 20 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 new 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 new 1 2 3 4 5 6 7 8 9 10 11 new 1 2 3 4 5 6 7 8 9 10 new 1 2 3 4 5 6 7 new 1 2 3 4 5 6 7 new 1 2 3 4 5 6 new recommended end of service 1 year past recommended end of service 2 years past recommended end of service 22 3 years past recommended end of service 4+ years recommended end of service scheduled for replacement Equipment Aging Schedule for Units Assigned to Highway Garage Vehicle/Eqp # Description Year 2010 2011/2012 proposed 5 year CIP 2012 2013 2014 2015 2016 2011 updated as of 12/2010 2017 2018 2019 2020 2021 2022 2023 2024 Trucks: 29 TOL Mack Dump 30 TOL Mack Dump 24 TOL Mack Dump 12 TOL GMC Dump 3500 11 TOL Ford F-150 P/U 28 TOL Ford Dump 6 TOL Freightliner Lo-Pro Dump 32 TOL Sterling Dump 35 TOL Western Star Dump 8 TOL Ford Utility 23 TOL Mack 10 Wheel Dump 33 TOL Mack Dump 2 TOL Ford F250 P/U 25 TOL Ford D-550 Dump 34 TOL Mack Dump 27 TOL International 7400 31 TOL International 7400 Scheduled Replacements: 30 TOL Mack Dump 24 TOL Mack Dump 28 TOL Mack Dump 6 TOL Lo-Pro Dump 8 TOL Ford Utility 1991 1993 1994 1995 1996 1997 2000 2001 2002 2003 2004 2005 2006 2007 2008 2008 2009 19 20 17 18 16 17 18 15 16 17 18 19 14 15 16 17 18 13 14 15 16 10 11 12 13 14 15 16 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 7 8 9 10 11 12 13 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 new 1 2 3 4 5 6 7 8 9 10 11 12 new 1 2 3 4 5 6 7 8 9 10 11 new 1 2 3 4 5 6 7 8 new 1 2 3 4 5 6 7 8 44 45 46 47 2011 2012 2013 2016 2016 new 21 22 Heavy Equipment: 17 TOL 16 TOL 18 TOL 20 TOL 7 TOL 22 TOL 26 TOL 19 TOL Cat Grader Cat Loader John Deere Backhoe Elgin Sweeper Vac-All Cat Backhoe Cat 938 Loader Elgin Sweeper Paver (used) 21 TOL Roadside Mower Scheduled Replacements: 16 TOL Cat Loader 18 TOL John Deere Backhoe 1972 1988 1989 1995 2000 2002 2002 2003 2007 2010 38 39 40 41 42 22 23 24 25 26 21 22 23 24 25 26 15 16 17 18 19 20 21 22 23 refurb 11 12 13 14 15 16 17 18 19 20 21 22 23 24 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 aquired 4 5 6 7 8 9 10 11 12 13 14 15 16 17 new 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 new 1 2 3 4 5 6 7 8 9 2014 2015 new recommended end of service 1 year past recommended end of service 2 years past recommended end of service 3 years past recommended end of service 4 years or more past recommended end of service 43 scheduled for replacement refurbished FY12-13 CAPITAL PLAN BY PROGRAM AREA Town Administration, $48,877 - 1.5% Board of Education, $996,000 - 29.6% Streets/Roads, $1,033,807 - 31.5% Public Facilities, $223,497 - 6.8% Fire/Ambulance, $315,000 - 9.6% Capital Equipment, $240,500 - 7.3% We Must Protect Our Investment in Our Infrastructure Miles of paved local roads: 123.25 Miles of unpaved local roads: 8.85 Total miles of road = 132.10 To construct 1 mile of road = $1 million dollars 132.10 miles x $1,000,000 = ● $132,100,000 The investment we must protect ● Town of Tolland, CT Pavement Management Study Update: February, 2012 Presented by Gordon Daring of VHB, Inc. Presentation Overview • Pavement Management Concepts • Pavement Management in Tolland Current Conditions & Backlog Budget Analysis Updated 5 Year CIP Pavement Management Concepts What is Pavement Management? • The practice of planning for pavement maintenance and rehabilitation with the goal of maximizing the value and life of a pavement network. Otherwise known as “Getting the Biggest Bang for Your Buck” Pavement Management Concepts The Process • Pavement Section Inventory • Pavement distress identification and quantification (Updated on a four year cycle) • Pavement Condition Index (PCI) calculation on a 0 - 100 scale • Define Repair Strategies and Costs • Test various Budget Scenarios • Develop list of candidate projects • Apply engineering and local judgment to define annual road program Pavement Management Concepts Pavement Deterioration Curve Will cost $10.00 to $13.00 Here Pavement Management Concepts PCI = 99 Do Nothing Condition (PCI 91-100) Pavement Management Concepts PCI = 86 Routine Maintenance Condition (PCI 83-90) Treatment options – Crack sealing, patching Pavement Management Concepts PCI = 73 Preventive Maintenance Condition (PCI 71-82) Treatment options – Crack sealing, chip seal, thin overlay Pavement Management Concepts PCI = 65 Structural Improvement Condition (PCI 56-70) Treatment options – Overlay, Mill & Overlay, Cold in Place Recycling Pavement Management Concepts PCI = 43 Base Rehabilitation Condition (PCI 0-55) Treatment options – Reclamation, Reconstruction Pavement Management in Tolland Pavement Condition Index (PCI) Average Pavement Condition Index = 71* 100 Do Nothing 90 Routine Maintenance 80 71 70 Preventive Maintenance Structural Improvement 60 50 Base Rehabilitation 40 Years * Estimated, February, 2012, based on computer projection Pavement Management in Tolland PCI Distribution Trend 40 2010 2011 35 30 Miles 25 20 15 10 5 0 0-55 56-70 71-82 PCI 83-90 91-100 Pavement Management in Tolland Current Backlog Summary* (Feb, 2012) Treatment Band Miles Cost Do Nothing 19.7 $0 Routine Maintenance 17.5 $138,633 Preventative Maintenance 22.1 $2,074,913 Structural Improvement 40.1 $6,011,533 Base Rehabilitation 23.5 $7,064,463 123.0 $15,289,542 Totals: * Paved Roadways only Pavement Management in Tolland Funding Scenario Comparison • The effects of funding scenarios at $500k and $1.2M over 5 years as well as the planned levels listed below were evaluated. • • • • • FY2013 - $650k FY2014 - $850k FY2015 - $750k FY2016 - $750k FY2017 - $750k • The analysis did not include parking lot, drainage, or gravel road needs Pavement Management in Tolland Future Pavement Condition Projections 77 76 Pavement Condition Index 75 74 73 72 71 70 Given the trend of poorer road conditions over the last 69 three years, the planned increase in funding is wise. 68 67 2010 2011 2012 2013 2014 Year $500k Plan $1.2M 2015 2016 2017 Development of Annual Road Program Process • • Determine effective funding levels System recommends roads of highest benefit to the Town based on: • High Traffic Volume • Lower Repair Cost • Longer Repair Life Expectancy • Poorer Road Conditions • Engineering judgment is used to adjust the program to reflect coordination with other projects, neighborhood programs, mobilization efficiencies, etc. Development of Annual Road Program Strategy • Focus primarily on most heavily travelled roads until those roads have reached acceptable condition • Reserve a portion of budget to address some local residential roads • Coordinate work on residential roads within neighborhoods • Use full range of pavement treatment options Town of Tolland, CT Pavement Management Study Questions and Answers February, 2012 TOLLAND DEBT SCHEDULE 2012-13 THROUGH 2016-17 % change FY 12/13 - $4,642,785 (1.62)% FY 13/14 - $4,664,018 .46% FY 14/15 - $4,672,829 1.0% FY 15/16 - $4,480,554 (4.12)% FY 16/17 - $4,561,092 1.80% DEBT SERVICE FOR BUDGET YEAR: $4,642,785 Debt Service Breakdown: 29% School Town 71% DEBT SERVICE FOR BUDGET YEAR: $4,642,785 SCHOOL – 71% 1998 bonds – 92.3% - Birch Grove School and miscellaneous school projects 2002 bonds – 46.2% - THS roof, THS track, Middle School renovations, Parker fascia & THS modulars 2003 bonds (Refunded in 2011) – 51.4% - Birch Grove School addition/Tolland High School 2004 bonds – 68% - Tolland High School 2005 bonds – 96% - Tolland High School 2006 bonds – 94% - Tolland High School 2007 bonds – 56% - Tolland High School 2010 bonds – 67% - Tolland High School 2011 bonds – 22% - TMS floor, TIS HVAC, driveway DEBT SERVICE FOR BUDGET YEAR: $4,642,785 MUNICIPAL – 29% 1998 bonds – 7.7% - Miscellaneous Municipal projects 2002 bonds – 53.8% - Open Space, Senior Center, capital equipment, Cross Farms 2003 bonds (Refunded in 2011) – 48.6% - Open Space, Cross Farms, capital equipment 2004 bonds – 32% - Old Post sewer line, Cross Farms, capital equipment 2005 bonds – 4% - Miscellaneous municipal projects 2006 bonds – 6% - Open Space 2007 bonds – 44% - Open Space DEBT SERVICE FOR BUDGET YEAR: $4,642,785 MUNICIPAL – 29% 2008 bonds – 100% - Open Space and municipal projects 2010 bonds – 33% - Open Space 2011 bonds – 78% - Municipal projects 2011 Geothermal project WHAT IS NOT INCLUDED IN THIS CAPITAL BUDGET ALL FACILITY IMPROVEMENTS Public Facility Construction of a New Library Highway & Parks Facilities Plan for Public Works Buildings Metal Storage Garages/Truck Wash Facility Parks/Facilities Garage Fire & Ambulance Fire Station Upgrades for Station 140 Additional Space and Roof to Station 340 & 440 Fire/Training Complex Budget Schedule: Important Upcoming Dates February 23, 2012 (Thursday) Capital Budget Public Hearing – Council Room – 7:30 p.m. March 6, 2012 (Tuesday) Manager convenes joint meeting between Council and Board of Education (by April 11 per Charter requirement) – Council Room – 7:00 p.m. March 13, 2012 (Tuesday) Manager submits Budget to Council (by March 27 per Charter requirement) March 15, 2012 (Thursday) Advertise Public Hearing March 15, 2012 (Thursday) March 20, 2012 (Tuesday) March 21, 2012 (Wednesday) Mgr. discusses Budget w/Council–Council Room – 7:30 p.m. Mgr. discusses Budget w/Council–Council Room – 7:30 p.m. Mgr. discusses Budget w/Council–Council Room – 7:30 p.m. March 28, 2012 (Wednesday) PUBLIC HEARING on Manager’s Recommended Budget: Board of Education, Town Government, Capital Improvement Plan – Tolland High School Auditorium – 7:30 p.m. April 3, 2012 (Tuesday) Council Discussion – Budget finalized – Council Room – 7:30 p.m. April 12, 2012 (Thursday) Advertise Budget April 24, 2012 (Tuesday) ANNUAL BUDGET PRESENTATION MEETING – Tolland High School Auditorium – 7:30 p.m. May 1, 2012 (Tuesday) Annual Budget Referendum By May 10, 2012 (Thursday) Council to establish mill rate upon referendum adoption