International Federation of Consulting Engineers Speaker: Richard Kell AM FTSE BE(Hons) HonFIEAust CPEng, Director, Cardno International Pty Ltd Other Forms of Contract FIDIC MDB Harmonised Construction Contract Conference Other Forms of Contract • World Bank SBD for Small Works. • Labour Based (LBES) Contracts FIDIC short form • In country Contracts (eg, Philippines) – can lead to problems. * FIDIC Design Build or MDB Construction,Design by Employer with Design Build Inclusion. MAKIRA RIVER CROSSINGS SOLOMON ISLANDS FIDIC MDB Construction Contract with Design, Build Inclusions Case Study : Makira River Crossings, Solomon Islands MAKIRA CROSSINGS PROJECT: DETAILS • 26 River Crossings in Coastal Highway on Makira Island, Solomon Islands • High level and low level bridges, causeways and fords • 2010 – 2012 • Contract Value $17 million MAKIRA BRIDGES – MANAGEMENT AND FINANCING • Finance: AusAID, NZAID, ADB (grant funds) • Management by ADB • EA: SI Ministry of Infrastructure • Project Management: • Cardno Australia • Contractor: McConnell Dowell NZ. • Crossings create connectivity, alleviate poverty and improve way of life for locals. Makira Bridges • Challenges: – Rivers are braided, some carry large debris loads; – High peak rainfall; – Seismic effects; – Remote sites. – Limited budget. Low traffic volumes favour low level, submergible structures, and do not justify high level bridges throughout. MAKIRA BRIDGES: CONTRACT • FIDIC 2006 MDB Harmonised Version of Construction Contract. *Design by Employer, BUT • High level Bridges: Design by Contractor, FIDIC MDB provisions for design by contractor not sufficient. MAKIRA HIGH LEVEL BRIDGES: DESIGN BUILD PROVISIONS * Separate SECTION of Specification dedicated to Design and Construction of High Level Bridges. Design criteria in Bid Documents: Bidder submits Concept Bridge Proposal in reasonable detail; Design Engineer, Geotechnical Engineer, Independent Design Reviewer: To be nominated with Bid, and on completion of tasks, to issue certificates; Contractor to submit full details, but Engineer does not approve Contractor’s Design Engineer to make inspections. MAKIRA CROSSINGS • Advantages of Design Build – Contractor can provide a standard or existing design to his and Employer’s cost and time advantage; – Design and geotechnical risks transferred to contractor. • Design Form Proposed: Tied Steel Arch, 75m span. As specified : above 100 year flood, T44 loading, single lane with concrete deck. • Outcome: Very successful. Coastal wharves Low Level Bridges Low Level Bridges - Precast Concrete Maharoa Bridge, 75 m Tied Arch