Session 7 Kell BRUSSELS FIDIC_2012 Other Forms

advertisement
International Federation of Consulting Engineers
Speaker: Richard Kell AM FTSE BE(Hons) HonFIEAust CPEng,
Director, Cardno International Pty Ltd
Other Forms of Contract
FIDIC MDB Harmonised Construction Contract Conference
Other Forms of Contract
• World Bank SBD for Small Works.
• Labour Based (LBES) Contracts FIDIC short form
• In country Contracts (eg, Philippines) – can lead to
problems.
* FIDIC Design Build or MDB Construction,Design by
Employer with Design Build Inclusion.
MAKIRA RIVER CROSSINGS
SOLOMON ISLANDS
FIDIC MDB Construction Contract with Design,
Build Inclusions
Case Study : Makira River Crossings, Solomon
Islands
MAKIRA CROSSINGS PROJECT: DETAILS
• 26 River Crossings in Coastal Highway on
Makira Island, Solomon Islands
• High level and low level bridges, causeways
and fords
• 2010 – 2012
• Contract Value $17 million
MAKIRA BRIDGES – MANAGEMENT AND FINANCING
• Finance: AusAID, NZAID, ADB (grant funds)
• Management by ADB
• EA: SI Ministry of Infrastructure
• Project Management:
• Cardno Australia
• Contractor: McConnell Dowell NZ.
• Crossings create connectivity, alleviate poverty
and improve way of life for locals.
Makira Bridges
• Challenges:
– Rivers are braided, some carry large debris loads;
– High peak rainfall;
– Seismic effects;
– Remote sites.
– Limited budget. Low traffic volumes favour low
level, submergible structures, and do not justify
high level bridges throughout.
MAKIRA BRIDGES: CONTRACT
• FIDIC 2006 MDB Harmonised Version of
Construction Contract.
*Design by Employer, BUT
• High level Bridges:
 Design by Contractor,
 FIDIC MDB provisions for design by
contractor not sufficient.
MAKIRA HIGH LEVEL BRIDGES: DESIGN BUILD
PROVISIONS
* Separate SECTION of Specification dedicated to Design and
Construction of High Level Bridges.
 Design criteria in Bid Documents: Bidder submits Concept
Bridge Proposal in reasonable detail;
 Design Engineer, Geotechnical Engineer, Independent
Design Reviewer: To be nominated with Bid, and on
completion of tasks, to issue certificates;
 Contractor to submit full details, but Engineer does not
approve
 Contractor’s Design Engineer to make inspections.
MAKIRA CROSSINGS
• Advantages of Design Build
– Contractor can provide a standard or existing design to
his and Employer’s cost and time advantage;
– Design and geotechnical risks transferred to contractor.
• Design Form Proposed: Tied Steel Arch, 75m span. As
specified : above 100 year flood, T44 loading, single lane
with concrete deck.
• Outcome: Very successful.
Coastal wharves
Low Level Bridges
Low Level Bridges - Precast Concrete
Maharoa Bridge, 75 m Tied Arch