The 2nd Green Mekong Forum International Conference on “Green Mekong Initiative” Water Resources Management in Lao PDR By: Mr. Phousavanh Fongkhamdeng Department of Water Resources, Ministry of Natural Resources and Environment 21 October 2013, Bangkok, Thailand 1 OverviewWater Resources in Lao PDR Lao PDR is located in South-East Asia with Area of 236,800 km2, approx. 6.2 Mil. people; 90% of the country are in Mekong Basin; Water resources per capita is around 55,000 m3 per year; 35% of annual flow (or equal 270,000 mil. m3) in Mekong is from Lao tributaries; The monthly rivers flow by the pattern of rainfall is around 80% during the rainy season and 20% in the dry season. Overview - The Basin Linkages IWRM IN LAO PDR Geography IWRM instruments Mekong Basin Mekong IWRM Strategy Mekong IWRM-based BDP Lao PDR National Water Resources Strategy 2020 and Action Plan 2011-2015 Nam Ngum Nam Ngum IWRM Plan Nam Xong sub-Basins Nam Xong sub-basin plans Watersheds Integrated Watershed Management Plans (Nam Po) IWRM Progress & Cooperation in Lao PDR Institutional Aspects: • The government is working very constructively to improve the water resources planning and management system in Lao PDR; • IWRM responsibility (Ministry of Natural Resources and Environment (MONRE) + 17 PONRE + 147 DONRE countrywide); • Department of Water Resources is one of 17 Departments in MONRE; • Water & Water Resources Law (revising, next month pass GOL Roundtable and expect that end of 2013 pass National Assembly); • Water Resources Strategy 2020 (in place, indicated 12 major programmes). National Water Resource Strategy 2020 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Institutional Strengthening & Coordination; Legislation, Plans and Implementation; RB and Sub-RBs WR Planning; Groundwater Management; Data & Information Management; Water Allocation; Protection of WQ and Ecosystems; Wetland Management; Flood and Drought Management; WR Risk Mgt. & CC Adaptation; IWRM Financing; Awareness, Participation & Capt. Building. 3 IWRM Progress & Cooperation in Lao PDR (cont.) Technical Aspects: • Applied IWRM in RB/sub-basin planning & Mgt. – first 5 basins mentioned in NSEDP 2011-2015 & more (Nam Ngum, Nam Theun-Kading, Sebangfai, Sebanghieng, Sekong, Sedone…); • National IWRM Support Programme - IWRM Capacity & Awareness Plans, RBM+ IWRM Curriculums Development, IRBM Guidelines, Water Resources Inventory & Modeling, Groundwater Management, Climate Change to Water, etc (implementing); • Pilot project on WQ monitoring in RB/sub-basin (Nam Lik, Nam Ting-Nam Chat, Nam Kho, etc & expanding to others) + guidelines development; • National IWRM Demonstration Site and training centre in Vangvieng District , Vientiane Province (approx. 8,000 ha, benchmarking, designing); • Lao IWRM Financing Study – water use fee, WR fund options, etc. (putting into Presidential Decree on Natural Resources Charges -ongoing) • Public-Private-Community IWRM Awareness and Participation. “Consultation & Public Awareness” “e.g. River Clean Up Day – Nam Xong” “e.g. Gender Mainstreaming in IWRM” Some Challenges New institutional arrangement & establishment; Legislations need to improve, IWRM-based plans (still limited understanding of stakeholders-public, private, communities); Limited capacity of concerned staff on RB planning & management + public awareness & local participation on IWRM; Lack of efficient & accurate WR data & information; WR development increased -WQ and ecosystems has been degraded in some areas; Natural disaster frequently occurred and more severe - floods, drought & CC impact on water countrywide; Limit financial support & sustainable mechanism; Milestones 2011-2015 1) Implement and disseminate the National Water Resource Strategy 2020 (12 programmes); 2) Continue to update and implement WR law + its supported legal documents – decree, regulations, etc; 3) Carry out IWRM-based planning & management in basins including (NN, NT-KD, Sekong, Sebangfai, Sebanghieng, Sedone, Nam Ou) & other tributaries; 4) Create and improve water database & link with RBs & related line agencies; 5) Study and establish WR fund, water use fee/benefit sharing for IWRM and testing its operation; Milestones 2011-2015 (cont.) 6) Implement the capacity development & awareness raising plan on IWRM (plan in placed); 7) Prepare and implement WQ, wetlands and groundwater mgt. plan, profiles and guidelines; 8) Flood and Drought Management; 9) Create demonstration site, training centre on IWRM + awareness + Capacity Development.; 10) Encourage more stakeholders in IWRM incl. hydropower, mining and related issue forums; 11) Promote more investments for conservation and rehabilitation of WR & response to CCA on water (small infrastructure, etc). . Priority Needs for Cooperation • Lao PDR needs to have appropriate management approach, policy suit to Laos context and capacities for IWRM including technical capacity and funding. • Participate in regional and global cooperation & exchange in IWRM in all aspects (trainings, exchange, meetings, forums, etc). Thank You Contact: lan-laos@hotmail.com; lan.jrp@gmail.com; Mobile: +856 20 2366 5577 Office Contact: www.dwr.monre.gov.la Tel: +856-21 241 744; Fax: +856-21 218 737