c Installation Instructions 35E Push/Pull Conversion Kit 6844140 This sheet describes converting a three function push/pull attachment to two function operation using Conversion Kit 6844140. The kit includes fittings, hoses, tubes, mounting plates and hardware. Attachment Removal 1 Fully extend the faceplate. pallet. 1 Lower the attachment onto a 2 Remove lower hooks. Bolt-On Hooks – Remove the lower mounting hooks. For reassembly, tighten the capscrews to a torque of 120 ft.-lbs. (165 Nm). Quick-Change Hooks – Pull out the retaining pins, slide the hooks down and reinstall the pins in the lower holes. For reassembly, slide the hooks up and install the pins in the top holes. WARNING: Before removing any hoses, relieve pressure in the hydraulic system. With the truck off, open the truck auxiliary control valve(s) several times in both directions. PP1498.eps Bolt-On Hooks Carriage Bar RC0368.eps 2 ST JU AD LH Lower Hook 3 Disconnect and plug the hoses at the carriage hose terminals. Tag hoses for reassembly. 4 Disconnect the solenoid electrical connection at the truck carriage. 5 Lower the truck carriage and back away from the Quick-Change Hooks attachment. Guide 4 2 RC0367.eps ® e ad sc ca 3 PP2123.eps -1 14 55 67 C- LH Lower Hook (Unlocked) Locking Pin cascade W corporation For Technical Support . . . To Order Parts . . . Call: 1-800-227-2233 Fax: 1-888-329-8207 Call: 1-888-227-2233 Fax: 1-888-329-0234 Internet: www.cascorp.com Internet: www.cascorp.com Write: Cascade Corporation, PO Box 20187, Portland, OR 97294 Write: Cascade Corporation, 2501 Sheridan Ave., Springfield, OH 45505 Conversion Kit Installation 1 Remove attachment as described in previous section, 1 “Attachment Removal”. 2 Remove existing solenoid valves, push/pull valve, junction 2 block, check valve, tubes, hoses, fittings, cables, mounting bracket and hardware. NOTE: Tubes, fittings and plugs can remain on the cylinder. The kit does contain replacement tubes and fittings. Replace if necessary. 4 3 67 5 1 3 Mark the locations, as shown, on the attachment frame using the provided dimensions. 4 Drill and tap the left flange with three M8 x 1.25 mm thread through. 5 Drill the middle bracket with two holes with the diameter between 0.43-0.46 in. (11.0-11.8 mm). 4 5 M8 x 1.25 mm thread, through (three places) PP2124.eps Diameter: 0.43-0.46 in. (11.0-11.8 mm) Location Dimensions 1 2 3 4 5 6 7 6 Mount bracket on each attachment flange. Tighten capscrews to 15 ft.-lbs. (20 Nm). 7 Install fittings to the brackets and middle frame bracket. 8 Install fittings to the push/pull valve. 9 Install push/pull valve on the arm. Tighten capscrews to 15 ft.-lbs. (20 Nm). 6 7 8 7 Mounting Bracket Mounting Bracket Capscrews PP2128.eps .39 ±.04 in. (10 ±1 mm) .59 ±.04 in. (15 ±1 mm) 3.94 in. (100 mm) 1.97 in. (50 mm) 4.04 ±.04 in. (102.5 ±1 mm) 1.10 in. (28 mm) .55 ±.04 in. (14 ±1 mm) 9 PP2127.eps 7 2 8 10 Install tubes for supply connections. 11 Install tubes from frame to the sideshift cylinder. 11 10 PP2129.eps 12 Install hoses from the frame to the push/pull valve. 13 Install hoses from the push/pull valve to the cylinders and gripper valve. (Push/Pull PR Cylinder Rod) 13 IMPORTANT: Take note of valve port locations and connection points for the hoses. PB (Push/Pull Cylinder Base) 13 Gripper Valve GR (Gripper GB Cylinder Rod) (Gripper Cylinder Base) GR PR Push/Pull Valve GB If required, replace tubes and fittings. PB 13 EXT RET RET EXT 12 PP2130.eps 3 14 Install the attachment onto the truck. Refer to Installation Instructions 684944 for complete installation procedure. PP2133.eps Sideshift Right 15 Push Pull Sideshift Left Prepare and install supply hoses. NOTE: Flush hoses prior to connecting the hoses from the attachment to the truck. PP2134.eps 16 Cycle attachment functions. • With no load, cycle all attachment functions several times. Push/Pull with Sideshift A Sideshift Left B Sideshift Right C Faceplate Push/Extend D Faceplate Pull/Retract • Check for operation in accordance with ANSI (ISO) standards. • Push/Pull a maximum load and sideshift left and right. Check for smoothness and adequate speed. • Check for leaks at fittings, valves and cylinders. D Tilt Forward Hoist Down B A C A C B D PP0325.eps PP0325.eps GA0005.eps Hoist Up Tilt Back 4 Hydraulic Conversion Kit Parts 1 4 2 ! 3 % $ 90 5 # 6 PP2131.eps REF QTY PART NO. 7 @ 8 DESCRIPTION 1 2 3 4 5 6 1 1 1 1 6 2 6844140 6844113 6844112 6844075 6844033 765329 2680 7 2 2375 Fitting, 6-6 8 4 2453 Fitting, 6-6 REF QTY Hydraulic Conversion Kit Tube Tube 9 10 11 12 13 14 15 Bracket – LH Bracket – RH Capscrew, M8 x 20 Fitting, 6-6 lSee Hydraulic Group page for parts breakdown. Reference:SK-32183. 5 2 2 2 1 1 1 1 PART NO. 2669 2617 2451 6844076 6844077 6844041 6844042 6086064 DESCRIPTION Fitting, 4-6 Nut Fitting, 4-4 Tube Tube Tube Tube Hydraulic Group ● Hydraulic Group 2 1 4 PR ! 0 PB 3 ! GR GB 8 4 5 4 $ % ! 9 @ 4 ! RET EXT 67 PP1629.eps REF QTY PART NO. DESCRIPTION 6086064 685831 683173 2375 604511 604511 6085927 Hydraulic Group (R1) Hose, Twinline, 39.60 in. 5 1 2 1 2 6 1 6 1 6045016 Relief Valve Cartridge ■ 1 2 3 4 u Hose, 15.50 in. u Fitting, 6-6 u Fitting, 6-6 Fitting, 6-6 Valve Body n n Included in Valve Assembly 6085925. Reference: SK-5385, SK-5386. © Cascade Corporation 2013 REF QTY 7 8 9 10 11 12 13 14 1 2 2 2 4 1 1 1 PART NO. 682170 787373 685978 684956 605235 200647 200649 200648 DESCRIPTION Service Kit u Capscrew, M8 x 25 Hose, 19.40 in. Cable Tie u Fitting, 6-6 u Tube u Tube u Tube u Included in Hydraulic Components Group 200581-R7. 6 10-2013 Part Number 6844154