the presentation (PowerPoint document 4,8 Mb)

advertisement

1 SNCF Infra | juin 2010

Maintenance policies

Bernard SCHAER

Director of Contracts & Customers Services

SNCF Infrastructure Branch

EFRTC

June 11th, 2010

1 | SNCF INFRASTRUCTURE BRANCH

SNCF INFRASTRUCTURE BRANCH : 3 DOMAINS

MAINTENANCE & TRAVAUX

CIRCULATION FERROVIAIRE

INGENIERIES

33 , 000 people

60 local entities

€ 3,500 m

2009

14,000 people

21 local entities

€ 950 m

2009

5 , 100 people

€ 650 m

2009

IG , INEXIA, SYSTRA

Maintenance of the railway network

Management of investments for RFF and SNCF

Troubleshooting 24/7

Timetable management

Traffic Control

Safety and punctuality of the railway system

Rail projects in France and throughout the world

Expertise and project management

Management of investments for RFF and SNCF

3 SNCF Infra | juin 2010

SNCF INFRA MANAGEMENT

SNCF INFRA

P. IZARD

C.E.O

WORK &

MAINTENANCE

X. OUIN

Director

HUMAN

RESSOURCES

FINANCE

COMMUNICATION

STRATEGY

CONTRACTS &

CUSTOMER SERVICES

B. SCHAER

Director

INFORMATION

SECURITY

TRAFFIC SAFETY

ENGINEERING

F.DELORME

Director

4 SNCF Infra | juin 2010

TRAFFIC CONTROL

DCF

A.H. BERTRAND

Director

2 | THE FRENCH RAILWAY SYSTEM

FRENCH RAILWAY SYSTEM AT A GLANCE

Operators

Regional

Authorities

(fund local trains)

Stations management

Infrastructure

Other operating Companies

Payments for paths

Maintenance contract

Operation contract

Infrastructure Manager

State

Safety body

Regulatory body

ARAF

6 SNCF Infra | juin 2010

SOME OF THE ACTORS OF THE SYSTEM

ARAF

R.F.F.

Réseau Ferré de France

E.P.S.F.

Etablissement Public de

Sécurité Ferroviaire

ARAF

Autorité de Régulation des Activités Ferroviaires

D.C.F

Direction de la Circulation

Ferroviaire

SNCF Infrastructure

Created in 1997

Owns the network

Took over €20.4b of historical SNCF debt (SNCF retained €7b)

A performance contract was signed with the

State in November

2008

7 SNCF Infra | juin 2010

Created in march 2006

Created by law in

December 2009

European directive

2004/49

Regulatory body for the railway sector

Monitors safety issues on the national railway network

Should be in place before the end of 2010

DCF still belongs to

SNCF, however has some kind of an independent status

Its director is named directly by the government.

DCF works for RFF and is responsible for

Traffic Control

Maintains the network

Manages investment works on behalf of RFF

A maintenance contract is signed between SNCF and

RFF since 2007

3 | THE FRENCH RAILWAY NETWORK

The French Network

Total track length

UIC 1 à 4 : 19885 km ( included 3839 km HSL )

9969 S & C ( included 754 HSL )

UIC 5 et 6 13803 km - 7621 S & C

Regional lines

• with passengers : 11723 km - 4113 S & C without passengers: 4417 km - 2171 S & C

Side tracks 14949 km - 46177 S & C

Level-crossings 18843

Bridges 40914

Tunnels 1 588 (631 km)

Signal boxes 2256

9 SNCF Infra | juin 2010

Power supply

Sub-stations: 535

Overhead lines

1500 V: 12 547 Km (40%)

25 000 V :19 098 Km (60%)

Study of EPFL 2005

The study made by EPFL in 2005 showed

Bad conditions of the network

No optimization of M/R: The share M/R was 2/3;1/3 when it was from 1/2;1/2 up to 1/3;2/3 in other europeen countries

No optimization of track possession : According to the EPFL, track possession duration was too short

(1h50) and no technically and economically efficient

No optimization of traffic control : There were too much signalling boxes

10 SNCF Infra | juin 2010

What has be done so far

At the end of 2005, RFF,SNCF and the French Government came to an agreement of an increasing of funding for renewal

1780 1800 1800 1800

1550

1343

1048

899

700

Track

Bridges

Sign

OHL

11 SNCF Infra | juin 2010

A 2005 A 2007 A 2008 A 2009 A 2010 A 2012 A 2013 A 2014 A 2015

2005

450

120

80

40

2007

602

130

75

50

2008

740

123

105

47

2009

965

132

144

51

2010

997

140

176

55

2012

1183

197

307

61

2013

1269

2014

1237

2015

1231

What has be done

60

55

50

60

55

50

45

40

35

30

2008 2009 2010 2011 2012 2013 2014 2015 2016

Courbes d'évolution de la substance UIC 1-4

45

40

35

30

2008 2009 2010 2011 2012 2013 2014 2015 2016

Courbes d'évolution de la substance UIC 5-6

12 SNCF Infra | juin 2010

A model of the network’s evolution has be done

These figures show that the track renewal program do not allow to modernize the network

Courbes d'évolution de la substance UIC 1-6

60

55

50

45

40

35

30

2008 2009 2010 2011 2012 2013 2014 2015 2016

Without renewal

With Perfomance Contract

What is going on

RFF has defined his strategic vision of the network

Definition of freight corridors with high level of availability

More accurate definition of the performance of the network according to the different routes, eg:

Axel load

Speed

Gauge

Availability

Increasing of the slots for TOCs and FOCs

Decreasing of maintenance and renewal costs

So SNCF has to improve the maintenance policies, in order to have more trains, more availability, as all Infra Managers do.

13 SNCF Infra | juin 2010

Maintenance policies

These huge requirements lead to

An optimization of maintenance and renewal, that means an assessment of the policies on each route based on LCC

More efficiency of the renewal

Longer zones

Uniformization

Planning

The necessity of planning and reducing maintenance costs; the best way is to move from an « on condition » based maintenance to a predictive maintenance

14 SNCF Infra | juin 2010

Predictive maintenance

To do that,it is necessary:

To have a good knowledge of the conditions of the network

To know the parameters which have an impact on the behaviour of the components of the infrastructure

To know the degradation’s laws of these components according to the sollicitations they have to support

In order to plan the interventions

15 SNCF Infra | juin 2010

Predictive maintenance

The knowledge of the degradation’s laws,eg:

Track circuits components

16 SNCF Infra | juin 2010

Tools

Development and implementation of measurement cars

IRIS 320 already in operation

Purchase of new measurement cars for conventional lines

Development and implementation of tools in order to modelize the degradation’s laws and so to define

« what to do » and « when to do » eg:

Contact wire wear measurement and planning of replacement (with « Catalyse »)

Track geometry quality measurement and planning of tamping (with « TIMON »)

17 SNCF Infra | juin 2010

Contact wire wear measurement

18 SNCF Infra | juin 2010

Contact wire wear analyse CATALYSE

Tableaux de synthèse classés par ligne

 Tableau de prévision de remplacement

 Tableau de suivi baguettes

 Tableau de suivi des périodicités de mesures préconisées dans les référentiels

Résultats des différents calculs (% inexploitable, section moyenne des FC, point le plus bas, homogénéité,….) des différentes années de mesures

Affichage N° support

Affichage des courbes sur différentes années de mesures avec les couleurs correspondantes.

 Bleu= année 2005

 Orange= année 2007

 Vert= année 2009

Seuil d’alarme

19 SNCF Infra | juin 2010

CATALYSE

20 SNCF Infra | juin 2010

Sélection des fichiers de mesures de référence et choix de la date de projection

Différents traits de couleur suivant les années de mesures.

 Bleu=2007

 Orange=2009

 Vert= Projection 2013

TIMON HSL 1

21 SNCF Infra | juin 2010

TIMON Conventional Line Paris-Le Havre

22 SNCF Infra | juin 2010

Remote control

Development and implementation of remote control for level crossings Signalling and S & C in 3

Supervision Centers (Paris, Lyon,Pagny/Moselle)

Curve of translation of a switch

23 SNCF Infra | juin 2010

Maintenance methods

Implementation of new methods of maintenance for a higher durability of the interventions eg:

Tamping in BAS

Grinding

Tamping and grinding

24 SNCF Infra | juin 2010

Optimization Maintenance/Renewal

X/T Y max

(T)/T

Y min

(T)/T

Niveau de saturation de

«jour»

Niveau de saturation de

«nuit»

T (âge de renouvellement)

To To

X = Coûts de régénération à la date 0

Y(T) = Coûts cumulés d’entretien de 0 à la date T

25 SNCF Infra | juin 2010

Models of maintenance costs

Maintenance costs are modelized according to track possession and distances between stations

D = 25km

14

12

10

Nombre de périodes

8

6

4

2

0

Nbr e P

/ 2h e P

Nbr

/ 3h

Nbr e P

/ 4h e P

/ 5h

Nbr

Nbr e P

/ 6h

19

17

15

13

11

5

7

9

Age Voie

26 SNCF Infra | juin 2010

12-14

10-12

8-10

6-8

4-6

2-4

0-2

Models of maintenance costs

D = 50km

25

20

Nombre de périodes

15

10

5

0

N br e P

/ 2h e P

N br

/ 3h

N br e P

/ 4h

N br e P

/ 5h

N br e P

/ 6h

19

17

15

13

11

5

7

9

Age Voie

27 SNCF Infra | juin 2010

20-25

15-20

10-15

5-10

0-5

28 SNCF Infra | juin 2010

Thank you for your attention

Q&A