OEE OVERALL EQUIPMENT EFFECTIVENESS Training agenda 1. Why we observe OEE ? 2. Definition 3. Finish 1. Why we observe OEE ? Overall equipment effectiveness (OEE) Definition of Overall Equipment Effectiveness OEE is an indicator of how a machine , production line or a process are performing in terms of Availability , Performance (Speed) and Quality . OEE 指的是生产过程中,机器,生产线或者 一个流程的生产能力的效率和质量的具体体现. How actually can look 8 hour on the machine ? Loss from start machine Product changeover Adjust machine Failure machine Personel fault Cycle optimatization Planned downtime Production 开机损失 更换定单 机器调整 机器故障 个人失误 周期优化 理论年度,每天生产时间 Theoretical production time , 365 days , 24 hours Planned down-time Planned production time Net operating time Planning factor (Pf) Equipment failure Unplenned down-time losses Gross operating time Six big losses Set up & Adjustment Idling & Minor Stoppages Speed losses Reduced speed Valuable operating time OEE TOEE Defects in process Quality losses Start up losses = Availability (A) X = Planning factor (Pf) X Total Productivity Performance (P) OEE X Quality (Q) Availability (A) Performance (P) Quality (Q) 1. Why we observe OEE ? Key requirement for stabilization and betterment OEE are :关键设备的稳定性和OEE改进 Strong maintenance加强维护保养 Good molds (tools) and trim tools良好模具和相关工 具 Stable and Manage proceses过程稳定和可控性 Strong process TPM (Total Productive Maintenance) 加强全过程的生产保养 Quickly change molds processes快速的模具更换流程 Professionally schooled worker oriented on the work in team 专业的职工队伍 1. Why we observe OEE ? OEE is tool for measuring most important managerial parameters and give answer of most main question give information about weak spots in production process support expansion of production (stability production process) help to see production process in detail make possible benchmark with others companies in branch OEE helps predictability in production 2. Definition OEE Theoretical production time , 365 days , 24 hours Planned down-time Planned production time Net operating time Planning factor (Pf) Equipment failure Unplenned down-time losses Gross operating time Six big losses Set up & Adjustment Idling & Minor Stoppages Speed losses Reduced speed Valuable operating time OEE = Defects in process Quality losses Start up losses Availability (A) OEE TOEE X Performance (P) X Quality (Q) Availability (A) Performance (P) Quality (Q) 2. Definition Planned production time Planned down-time Planning factor (Pf) OEE TOEE Total Productivity Planned downtime计划停机时间: - dowtime approved management companies as planned down-time - we could also say : planned down-time which production teams aren´t influence - examples : Sampling , Mold cleaning , Machine cleaning , power cutting , planned maintenance , planned maintenance periphery , NO production order 2. Definition Six big losses Equipment failure Gross operating time Unplenned down-time losses Availability (A) Set up & Adjustment OEE Availability factor is calculated on the basis of the Planned production time and Unplanned dowtime losses , and is the ratio of the planned production time to the gross operating time . Availability factor most influence : - failures (maintenance and process) and machine defects (maintenance) , edfects equipments , operator errors , tool changes , unplanned cleaning , time for adjustment machines / tools / equipments , communications , ..... * for the easy analysis dowtime we have cods 2. Definition Net operating time Six big losses Speed losses Idling & Minor Stoppages Reduced speed Performance (P) OEE Performance factor is calculated on the basis of the Gross operating time and the Performance (speed) losses = difference between norm and really cycle time Performance factor most influence : - performance reduction 2.Definition Valuable operating time Defects in process Quality losses Quality Start up losses (Q) OEE Quality factor we here mean the product quality which influences the production yield . Quality factor is calculated on the basis of the Net operating time and Quality . Losses due to „Defects in process“ and „Start up losses“ . * we have cods for quality faults – FA , FU , FO . 2. Definition OEE = Availability (A) X Performance (P) X OEE Quality (Q) Planned dow- time TOEE TOEE = Planning factor (Pf) Total Productivity X OEE 2. Definition OEE Theoretical production time , 365 days , 24 hours Planned down-time Planned production time Net operating time Planning factor (Pf) Equipment failure Unplenned down-time losses Gross operating time Six big losses Set up & Adjustment Idling & Minor Stoppages Speed losses Reduced speed Valuable operating time OEE = Defects in process Quality losses Start up losses Availability (A) X Performance (P) OEE TOEE Total Productivity X Quality (Q) Availability (A) Performance (P) Quality (Q) 5. Finish OEE is the main production parameter in Plaston Group And where else ? 5. Finish Where is our competition ? Qualities of best companies : • Great experience with the measuring of losses in production process • Systematicle improvement • Improving of employees qualification 100 90 80 70 60 50 40 30 20 10 Average in branche The best Outhers Foundries insustry Machine Injection cellulose, Paper , 0