Value Stream Capacity Understanding Value Stream Decision Making © BMA Inc. 2008. All rights reserved. Understanding Value Stream Capacity • The production quantity that can be achieved at each step in the value stream or production process. • There are usually one or two production steps (cells, machines, or work centers) that constrain the flow through the value stream or business unit. • We need to identify the production capacity at each step in the value stream (or production flow) so that we can understand the flow through the entire process. • Where is the data required for this analysis? – On the Value Stream Maps © BMA Inc. 2008. All rights reserved. Analyzing the capacity Productive capacity Value added activities Provides value to the customer Comes directly from customer pull Non-productive capacity Non-value-added activities Change-overs, unplanned maintenance, making for stock, defects/rework, etc. Also meetings, 5S, improvement activity Available capacity Capacity that is not currently being use for productive or non-productive activities. © BMA Inc. 2008. All rights reserved. OEM Value Stream Map Purchase Forecasts Supplier S&OP Demand Forecasts Customer 3,000 per Month Kanban DATA BOXES © BMA Inc. 2008. All rights reserved. Machine Machine Machine Shop Shop Shop Welding Assembly Assembly Assembly Qty = 30,000 C/T = 70s Batch = 1500 Set Up = 10,800s Scrap = 10% Rework = 20% Downtime = 15% Inspection = 10% Insp Time = 120s # cells = 8 Crew Size = 4 # of people = 34 Shifts = 1 Qty = 15,000 C/T = 180s Batch = 600 Set Up = 1200s Scrap = 5% Rework = 10% Downtime = 5% Inspection=100% Insp Time = 30s # cells = 5 Crew Size = 1 # of people = 10 Shifts = 2 Qty = 3,000 C/T = 210s Batch = 20 Set Up = 600s Scrap = 0% Rework = 10% Downtime = 0% Inspection=100% Insp Time = 60s # cells = 2 Crew Size = 5 # of people = 10 Shifts = 1 Order Shipping Shipping Shipping Qty = 3,000 C/T = 120s Batch = 1 Set Up = 0s Scrap = 0% Rework = 2% Downtime = 0% Inspection=0% Insp Time = 0s # cells = 1 Crew Size = 1 # of people = 1 Shifts = 1 Standard Cycle Time Cycle Time: C/T • • • • How often a part or product is completed by a process. (or: the time taken for an operator to go through all his/her work elements before repeating them.) Cycle time includes all processes VA & NVA Cycle time is measured by tracking it with a stop watch We match the cycle time to the customer takt time The process is “under control” if the cycle time is consistent © BMA Inc. 2008. All rights reserved. Crew size and number of cells • • Crew size - the number of people in the cell or operation required to produce to the cycle time recorded on the Value Stream Map # of cells = the number of cells running in parallel. Similar cells, working on the same products and performing the same process step. Crew size = 5 # of cells = 1 © BMA Inc. 2008. All rights reserved. Calculate the Capacity for the Machine Shop Purchase Forecasts Supplier S&OP Demand Forecasts Customer 3,000 per Month Kanban DATA BOXES © BMA Inc. 2008. All rights reserved. Machine Machine Machine Shop Shop Shop Welding Assembly Assembly Assembly Qty = 30,000 C/T = 70s Batch = 1500 Set Up = 10,800s Scrap = 10% Rework = 20% Downtime = 15% Inspection = 10% Insp Time = 120s # cells = 8 Crew Size = 4 # of people = 34 Shifts = 1 Qty = 15,000 C/T = 180s Batch = 600 Set Up = 1200s Scrap = 5% Rework = 10% Downtime = 5% Inspection=100% Insp Time = 30s # cells = 5 Crew Size = 1 # of people = 10 Shifts = 2 Qty = 3,000 C/T = 210s Batch = 20 Set Up = 600s Scrap = 0% Rework = 10% Downtime = 0% Inspection=100% Insp Time = 60s # cells = 2 Crew Size = 5 # of people = 10 Shifts = 1 Order Shipping Shipping Shipping Qty = 3,000 C/T = 120s Batch = 1 Set Up = 0s Scrap = 0% Rework = 2% Downtime = 0% Inspection=0% Insp Time = 0s # cells = 1 Crew Size = 1 # of people = 1 Shifts = 1 Calculate the employee capacity Step 1. Calculate the Total Available Employee Time (#employees x #days x Labor Hrs per shift) Step 2. Calculate the Employee Productive Time (Qty per Month x Cycle Time x Crew Size) Step 3. Calculate the Emp. Productive Capacity Percentage. (Employee Productive Time / Total Available Time) Step 4. Calculate the change-over time, scrap & rework time, downtime, inspection time. C/O = (quantity/batch size) x Change-over time Scrap/rework = (Qty produced / (1- (scrap + rework %) ) * (scrap + rework%) x Cycle Time x Crew Size D/T = Downtime% x Total Available Time Inspection= (Total produced + scrap/rework) x Inspection % x Inspection time Over-production = OP Qty x Cycle Time * Crew Size 5S & Clean-up = 5S Time x #Employees x #days Meetings = Meeting Time x #Employees x #days TPM = TPM Time per day * #days Step 5. Calculate the Total Non-Productive Time Sum of Step 4 Step 6. Calculate the Emp. Non-Productive Capacity Percentage Total Non-Prod Time / Total Available Time CELL DESCRIPTION Employee Productive Capacity Employee Non-Productive Capacity Employee Available Capacity Quantity Required per Month Quantity Produced in the Cell Over Production Unit of Measure Employee Cycle Time (per Crew) Maximum Pieces per Hour (per Crew) Internal Change Over Time Sec External Change-Over Sec Labor Hours per shift # Shifts per day Average Batch Size Number of Change-Overs Scrap Rate Rework Rate Scrap/Rework Quantitiy Downtime % Inspection % Inspection Time Sec 5S & Clean Up Time per Day Meetings & reporting per day TPM Time per Day Other Non-Productive - User defined Other Non-Productive - User defined Crew Size # cells Number of Employees Machine Shop 46% 47% 8% 30000 31500 1500 Units 70 51 10800 0 7.50 1 1500 20 10% 20% 13,500 15% 10% 120 600 600 1800 0 0 4 8 34 Step 7. Calculate the Emp. Available Capacity Percentage. 100% - (Prod. Capacity + Non-Prod Capacity) © BMA Inc. 2008. All rights reserved. Days per month 20 Machine Shop Capacity - employees Step 1 Total Employee Time 34 * 20 * 7.5 *3600 seconds 18,360,000 sec Step 2 Productive Time 30,000 * 70 * 4 8,400,000 sec Step 3 Productive Percentage 8,400,000 / 18,360,000 46% Step 4 Non-Productive Time Change-Over: 20 * 10,800 Scrap/Rework: (31,500 / 70%) * 30% * 70 * 4 Downtime: 15% * 18,360,000 Inspection Time: (31,500+13,500) * 10% * 120 Over production: 1500 * 70 * 4 5S & Clean Up: 600 * 34 * 20 Meetings & reports: 120 * 34 * 20 TPM: 1,800 * 20 216,000 sec 3,780,000 sec 2,754,000 sec 540,000 sec 420,000 sec 408,000 sec 408,000 sec 36,000 sec Step 5 Total Non-Productive Time 8,562,000 sec Step 6 Non-Productive Percentage 8,562,000 / 18,360,000 47% Step 7 Available Capacity 100% - (46% + 47%) 7% © BMA Inc. 2008. All rights reserved. Machine Shop Capacity EMPLOYEE CAPACITY CELL DESCRIPTION Employee Productive Capacity Employee Non-Productive Capacity Employee Available Capacity Quantity Required per Month Quantitiy Produced in the Cell Over Production Unit of Measure Employee Cycle Time (per Crew) Maximum Pieces per Hour Internal Change Over Time Sec External Change-Over Sec Labor Hours per shift # Shifts per day Average Batch Size Number of Change-Overs Scrap Rate Rework Rate Scrap/Rework Quantitiy Downtime % Inspection % Inspection Time Sec 5S & Clean Up Time per Day Meetings & reporting per day TPM Time per Day Other Non-Productive - User defined Other Non-Productive - User defined Crew Size # cells Number of Employees Days per month © BMA Inc. 2008. All rights reserved. Machine Shop 46% 47% 8% 30000 31500 1500 Units 70 51 10800 0 7.50 1 1500 20 10% 20% 13,500 15% 10% 120 600 600 1800 0 0 4 8 34 20 MACHINE CAPACITY CELL DESCRIPTION Machine Productive Capacity Machine Non-Productive Capacity Machine Available Capacity Quantity per Month Quantitiy Produced in the Cell Over Production Unit of Measure Machine Cycle Time Change Over Time Machine Hours per Shift # Shifts per day Average Batch Size Number of Change-Overs Scrap Rate Rework Rate Scrap/Rework Quantitiy Downtime % 5S & Clean Up Time per Day Meetings & reporting per day TPM Time per Day Other Non-Productive - User defined Other Non-Productive - User defined # Machines per Cycle Number of Machines Days per month Cell output is driven by Employee Time rather than Machine Time. There is more machine capacity than employee capacity Machine Shop 31% 35% 33% 30,000 31,500 1,500 Units 30 10800 8 1 1500 20 10% 20% 12,858 15% 600 120 9,600 0 0 2 10 20 Capacity Calculations when you have Multiple Product Families Calculate the weighted average of the cycle time, change-over, etc. WEIGHTED AVERAGE CALCULATION PRODUCT FAMILY TOTAL Quantity Required per Month 10,500 Employee Cycle Time (per Crew) 131 Total Cycle Time 5,520,000 Internal Change Over Time Sec 8,293 External Change-Over Sec 0 Average Batch Size 375 # Batches 28 Total Internal 928,800 Total External 0 Total Change Over Time 928,800 Scrap Rate 13% Rework Rate 18% Total Scrap 1,514 Total Rework 2,257 Total Scrap & Rework 3,771 Inspection % 10% Inspection Qty 1,050 Inspection Time Sec 91 Total Inspection Time 384,000 Crew Size 4 © BMA Inc. 2008. All rights reserved. Product Family A 2,500 240 2,400,000 10,800 0 400 7 302,400 0 302,400 20% 20% 625 625 1,250 10% 250 120 120,000 Product Family B 5,000 120 2,400,000 5,400 0 400 13 280,800 0 280,800 10% 15% 556 882 1,438 10% 500 60 120,000 Product Family C 3,000 60 720,000 10,800 0 400 8 345,600 0 345,600 10% 20% 333 750 1,083 10% 300 120 144,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Value Stream Capacity CELL DESCRIPTION Employee Productive Capacity Employee Non-Productive Capacity Employee Available Capacity Quantity Required per Month Quantitiy Produced in the Cell Over Production Unit of Measure Employee Cycle Time (per Crew) Maximum Pieces per Hour Internal Change Over Time Sec External Change-Over Sec Labor Hours per shift # Shifts per day Average Batch Size Number of Change-Overs Scrap Rate Rework Rate Scrap/Rework Quantitiy Downtime % Inspection % Inspection Time Sec 5S & Clean Up Time per Day Meetings & reporting per day TPM Time per Day Other Non-Productive - User defined Other Non-Productive - User defined Crew Size # cells Number of Employees Days per month © BMA Inc. 2008. All rights reserved. Machine Shop 46% 45% 9% 30000 31500 1500 Units 70 51 10800 0 7.50 1 1500 20 10% 20% 13,500 15% 10% 120 600 120 1800 0 0 4 8 34 Welding Shop 50% 26% 24% 15000 15000 0 Units 180 20 1200 0 7.50 2 600 25 5% 10% 2,648 5% 100% 30 600 120 0 0 0 1 5 10 Assembly 58% 10% 32% 3000 3000 0 Units 210 17 600 0 7.50 1 20 150 0% 10% 334 0% 0% 0 600 120 0 0 0 5 2 10 Shipping 67% 4% 29% 3000 3000 0 Units 120 30 0 0 7.50 1 1 3000 0% 2% 62 0% 0% 0 600 120 0 0 0 1 1 1 20 20 20 20 • Value Stream demand = 3,000 units/month • Takt Time = 180 sec • Average product has 5 welded sub-assy • Average sub-assy has 2 machined components • Machine Shop makes 30,000 items • Welding Shop welds 15,000 sub-assy • Assembly assembles 3,000 units Maximum Capacity is • Shipping ships 3,000 3,000 units because units Machine Shop can only make 30,000 parts