MPF / JLOTS Overview MPF org chart 4 SLRP (Survey Liaison Recon Party) O-9 3 ACB2 SLRP could include the following reps: - S3, S3A, S4, S7A, A3, B6, B3, C3, EA1 SLRP responsibilities: Gather detailed info on conditions within the AAA - Hydrographic analysis of the beach - Location of HN sources for construction materials - Location of covered storage and hardstand - Designation of MSR and MHE requirements - Location of HN emergency medical facilities - HN public telephone/satellite communications - Analysis on effects of customs/traditions - HN translator - Location of HN military, police & intel agencies 2 1 0 K -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 OPP (Off-load Preparation Party) O-4 3 2 OPP team includes reps from the MAGTF subordinate elements and NSE OPP responsibilities: OPP is tasked with the preparation of the equipment onboard the Maritime Prepositioning Ships (MPS) for debarkation at the AAA 1 Typical OPP team consists of ~100 personnel per MPS ~84 from MEF FWD ~16 from NSE (~5 from ACB2) 0 K -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 Advanced Party O-4 SECURITY 3 Red Beach 2 1 Green Beach - AP arranges the reception of the Main Body in coordination with the Tanker Airlift Control Element (TALCE) - Consists of AAOG, AAOE, LFSP, NSE and security elements to provide protection - AP team includes: 150 Security 200 NCW 210 NAVCHAPGRU 18 (2 boat crews) 110 Camp Support 688 - Arrival Airfield Control Group is operational - Tanker Airlift Control Element operational - Beach/Port/Airfield security is established 0 K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 Seaward Security (NCW) O-2 SEC SECURITY - MPSRON arrives in the AAA - Seaward security is established at Beach/Port - Arrival and Assembly organizations functional: 3 Red Beach 2 1 AAOG (Arrival Assembly Operations Group) AAOE (Arrival Assembly Operations Element) LFSP (Landing Force Support Party) POG (Port Operations Group) BOG (Beach Operations Group) MCC(Movement Control Center) AACG(Arrival Airfield Control Group) Green Beach SEC 0 K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 Navy Day O-1 SEC SECURITY - Splash lighterage at beach - Off-load systems ready - Voice and Data Communications established and tested 3 CF Shore Party Red Beach 2 RRDF LCT (lighterage control team) BPT (Beach Party Team) 1 Shore Party - MPS ready for off-load - Cargo Handling Systems prepared - Causeway ferries assembled - Connect RRDF CF CF SEC 0 Green Beach CF K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: Roll On Roll Off Discharge Facility (RRDF) • Purpose: Used for In-Stream off-load. Allows for quick discharge of rolling stock and mobile loaded material onto lighterage for transport to shore. • Capacity: 100 tons per section • Operating Limits: Sea State 2 • Installation: Approx. 36 hrs. • Crew: (Approx. 60 personnel) – OPS: 2 shifts of 13 personnel (26 total) – SLWT’s: 2 crews (16 personnel) • Craft: – (2) SLWT (Bring to the ship) – (1) SLWT (support) Major Events: Roll On Roll Off Discharge Facility (RRDF) • Equipment: – – – – – (6) CIN’s (1) COS (optional) (3) Tricons (3) ISO Containers RRDF kit (Lights, Zodiak, Easy, Dunnage, Flexors, Side Shear Connectors, 3 bumpers) • Acronyms – – – – – – PCO – Primary Control Officer OCO – Offload Control Officer LCO – Lighterage Control Officer LSO – Lighterage Supply Officer POG – Port Ops Group AAOG – Arrival Assembly Ops Group • USNS Martin (6 CINs, 1 SLWT) •Major CPF (Causeway Platform Facility) Events: 4 O - Day - Rolling stock, container and fuel off-load begins - Main Body begins arriving ~315 SECURITY - 80 ACB - 100 NCW - 65 ACU 3 Shore Party 2 Staging or Marshalling Area Shore Party control team) Green Beach Causeway Ferry RRDF Causeway Ferry SEC 0 Causeway Ferry LCT (lighterage BPT (Beach Party Team) 1 - Splash AAVs - Offload NSE equipment - Instream off-load begins SEC Red Beach - 60 BMU - 10 CNBG K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 O +1 - Initial water capability - Main Body continues to arrive SECURITY 3 Shore Party 2 Staging or Marshalling Area Causeway Ferry LCM-8 LCT (lighterage control team) BPT (Beach Party Team) 1 Shore Party RRDF Green Beach Causeway Ferry LCM-8 Causeway Ferry SEC 0 SEC Red Beach K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 O +2 - Issue habitability/capability sets - MRE issue point established - Install AABWS/AABFS SECURITY 3 Shore Party 2 Staging or Marshalling Area Causeway Ferry LCM-8 LCT (lighterage control team) BPT (Beach Party Team) 1 Shore Party Causeway Ferry Green Beach Causeway Ferry LCM-8 SEC AABFS 0 RRDF SEC Red Beach K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: Amphibious Assault Bulk Fuel System (AABFS) • • • • • • • Crew Size: 12 (Including BIU Crew and Boat Crew) Length: 10,000 ft Capability (5,000 ft per hosereel) Hose: 6 in. diameter Install: 10 hrs – 10,000 ft Rate of delivery: 700 gal/min @ 5,000 ft hose length (700,000 gal/day) Craft: SLWT/CSP/BF+1/LCU/LCM8 Operating Limits: install – sea state 2, operate – sea state 3 Intended for 30 days or less 600 GPM pump (in-line booster pump) Hose comes in 100 ft sections 2 zodiacs standing by for operations and maintenance Make sure hose has not been used for fuel or non-potable water Major Events: Amphibious Assault Bulk Fuel System (AABFS) • BIU – Beach Interface Unit (Place 150 ft above high water mark) • Installation: 1. Place BIU at beach 2. Place 2 sections (200 ft) on beach 3. Install riding saddle approx. 100 ft from beach 4. Pay out hose from shore 5. Anchor every 150 ft. 6. Light buoy every 100 ft Major Events: Amphibious Assault Bulk Water System (AABWS) • • • • • Crew Size: 12 (Including BIU Crew and Boat Crew) Length: 10,000 Per Hosereel Hose: 4 in. diameter Install: 10 hrs – 10,000 ft Rate of delivery: 300 gal/min @ 10,000 ft hose length (700,000 gal/day) • Craft: SLWT/CSP/BF+1/LCU/LCM8 Hose comes in 150 ft sections 2 zodiacs standing by for operations and maintenance Make sure hose has not been used for fuel or non-potable water Major Events: 4 O +4 - Main Body FIE complete - MAGTF self-deploying aircraft begins arriving - Instream rolling stock off-load complete SECURITY 3 Shore Party 2 Staging or Marshalling Area Causeway Ferry LCM-8 LCT (lighterage control team) BPT (Beach Party Team) 1 Shore Party Causeway Ferry Green Beach Causeway Ferry LCM-8 SEC AABFS 0 RRDF SEC Red Beach K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: 4 O +6 through O+9 - Container off-load complete O+6 - MAGTF operationally ready O+9 SECURITY 3 Shore Party 2 Staging or Marshalling Area Causeway Ferry LCM-8 LCT (lighterage control team) BPT (Beach Party Team) 1 Shore Party Causeway Ferry Green Beach Causeway Ferry LCM-8 SEC AABFS 0 SEC Red Beach K CAMP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22 Major Events: Joint Logistics Over The Shore (JLOTS) Pre-JLOTS SEC SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS MPS Red Beach Causeway Ferry MPS LCM-8 Staging or Marshalling Area SLCP(ship literage control point) BLCP (Beach literage Cont Pt) Crane ship Causeway Ferry Green Beach MPS HLPS LCM-8 HLPS BCU LCM-8 AABFS MPS K SEC 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 ABN BDE Closes Prepo Afloat APS 3 PREPO Ashore BDE Closes ADVON arrives P.O.P. Arrives MPS Discharge 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Pre-JLOTS SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS Red Beach MPS Causeway Ferry MPS LCM-8 Staging or Marshalling Area SLCP(ship literage control point) BLCP (Beach literage Cont Pt) Causeway Ferry Green Beach MPS LCM-8 BCU MPS P. O. P. ABLTS MPS K SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Discharge P.O.P. Assemble RRDF Floating pier MPS Discharge 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Pre-JLOTS SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS MPS MPS MPS Red Beach Causeway Ferry MPS LCM-8 Staging or Marshalling Area SLCP(ship literage control point) BLCP (Beach literage Cont Pt) Crane ship Causeway Ferry Green Beach MPS HLPS LCM-8 BCU HLPS ABLTS MPS K SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MPS Establish port/beach for APS Discharge Discharge 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS Prep SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS MPS Red Beach LMSR LMSR LMSR LMSR LMSR LMSR MPS Staging or Marshalling Area Floating Pier SLCP(ship literage control point) BLCP (Beach Crane ship literage Cont Pt) Green Beach JLCC (Joint literage control center) MPS BCU AABFS MPS K SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MPS APS 3 Arrives Discharge JLCC 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS Prep SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS Red Beach MPS MPS Floating Pier SLCP(ship literage control point) BLCP (Beach literage Cont Pt) LMSR LMSR LMSR LMSR LMSR LSV Causeway Ferry LCM-8 Staging or Marshalling Area LMSR Container Ship Container Ship Crane ship Causeway Ferry Green Beach MPS LCM-8 AMMO AMMO BCU AMMO AABFS MPS K SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Remaining APS 3 Arrives Additional Trans Gp. Arr LSV Arrives MPS Discharge 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS Prep OPDS arrives - delivers up to 1.2M gal of product SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS MPS LMSR LMSR LMSR LMSR LMSR LSV Red Beach Staging or Marshalling Area LMSR MPS Floating Pier SLCP(ship literage control point) BLCP (Beach Container Ship Container Ship Crane ship literage Cont Pt) Green Beach JLCC (Joint literage control center) MPS AMMO BCU AMMO AABFS MPS K AMMO SEC APOD OPDS CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 OPDS Arr. MPS Discharge OPDS (Offshore Petroleum Distribution System) • Crew: ( approx. 50 per shift) – ACB2 – 100 personnel – Other – 76 personnel – Total: 176 personnel • Equipment: – – – – – – Modified Medium Tanker 4 nautical miles of hose (6” diameter) Single Anchor Leg Moor System (SALM) (30o list to drop) OPDS Jewelry for SLWT conversion 4 modified SLWTs or 5 OUBs (OPDS Utility Boats) UCT support for installation and maintenance • Length: 4 nautical miles – 1 product 2 nautical miles – 2 products • Capacity: 1.2 Million Gallons/ 20 hour Day OPDS (Offshore Petroleum Distribution System) • Operating Limits: – water depths of 35 – 200 ft – 1.5 knot currents, 16 knot winds – sea bottom made up of sand, mud, coral (not rock) • Planning Factors: – 48 hrs to convert craft – 48 hrs after tanker arrival, deliver 1.2 MG/20 hr day using 4 point mooring – 7 days after tanker arrival to have SALM system operational intended for 180 day installation – 5 OUB’s on each tanker (1 repair barge, 3 tow tugs, 1 dive boat) – BTU (Beach Termination Unit) each tanker carries 2 (crew size 4) – SALM will survive 55 knot winds 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS Prep SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) MPS MPS LMSR LMSR LMSR LMSR LMSR LSV Red Beach Staging or Marshalling Area LMSR MPS Floating Pier Container Ship Container Ship Crane ship SLCP(ship literage control point) BLCP (Beach literage Cont Pt) Green Beach JLCC (Joint literage control center) AMMO MPS AMMO BCU AMMO OUB OUB OUB OUB AABFS OUB MPS K SEC APOD OPDS CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Establish OPDS MPS Discharge 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS Prep SECURITY Staging or Marshalling Area BCU (Beach Clearance Unit) LMSR LMSR LMSR LMSR LSV LMSR Red Beach Staging or Marshalling Area MPS Floating Pier Container Ship Container Ship Crane ship SLCP(ship literage control point) BLCP (Beach LMSR literage Cont Pt) Green Beach JLCC (Joint literage control center) MPS AMMO AMMO BCU AMMO OUB OUB OUB OUB OUB IPDS K OPDS SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Begin APS 3 Discharge at SPOD Est. IPDS/ MPS Discharge 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS SECURITY Staging or Marshalling Area LMSR LMSR LMSR LMSR BCU LSV LMSR Red Beach Staging or Marshalling Area Container Ship BLCP Container Ship Crane ship Floating Pier BCU JLCC (Joint literage control center) LMSR Green Beach AMMO AMMO SLCP BLCP AMMO OUB OUB OUB OUB OUB IPDS K OPDS SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MPS Complete Transfer Responsibility PREPO Afloat Main Body Arriving 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 JLOTS SECURITY LMSR Staging or Marshalling Area LMSR LMSR BCU LMSR Red Beach LSV RRDF LMSR BLCP Container Ship LCU-2000 Staging or Marshalling Area Floating Pier Container Ship Crane ship RRDF LCM-8 LCU-2000 JLCC (Joint literage control center) BCU LMSR LCM-8 Green Beach AMMO AMMO AMMO SLCP BLCP OUB OUB OUB OUB OUB IPDS K OPDS SEC APOD CAMP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Begin Instream Discharge of APS 3 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 JLOTS ELCAS(M) arrives - critical to throughput across the beach SECURITY LMSR Staging or Marshalling Area LMSR LMSR BCU LMSR Red Beach RRDF LMSR BLCP Staging or Marshalling Area Container Ship Floating Pier Container Ship Crane ship RRDF BCU JLCC (Joint literage control center) LMSR Green Beach AMMO AMMO ELCAS (Elevated Causeway) AMMO SLCP BLCP OUB OUB OUB OUB OUB OPDS APOD CAMP Fuel Farm SEC K IPDS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 OPDS In Operation LT Division Closes PREPO BDE Closes ELCAS Arrives Elevated Causeway System (ELCAS(M) ) • Crew Size: – Erection: 120 (2-60 man crews) – Operation: 54 (2-27 man crews) – SLWT: 32 (4-8 man crews) • Length: Goal: Pier Head outside of surf zone with at least 20 ft. depth of water. • Description: 8’x 40’x 5’ (pontoon) modular sections cantilevered over the water • Operational Requirements: (Erect 3000 ft. in 7 days) handle cargo from both sides of pier head erect from shore using cantilever erection with 175 ton cranes operate in sea state 3 (5ft waves) , survive sea state 5 (12 ft waves) beach gradient (not less than 1:24 or greater than 1:300) Elevated Causeway System (ELCAS(M) ) • Planning Factors: 20 ft at pier head prefer soft bottom (sand/clay) need shore side area for staging, marshalling, logistics bottom of roadway pontoon 7 ft above mean high water • Modular BF: 3 pontoons wide x 3 pontoons long (24 x 120 w/o powered section, carry up to 298,000 lbs) 5 pontoons wide x 3 pontoons long (40 x 120 w/o powered section, carry up to 498,000 lbs) • Used to carry cranes, pontoons, pile bins Elevated Causeway System (ELCAS(M) ) Equipment: (2) 175 Ton Cranes (2) Tractor trailer turntables (48,000 lbs) (1) 30T Rough Terrain Mobile Crane (2) 25 Ton RTCH (3) Welding Machines (1) 15,000 lb RT Forklift (2) Diesel hammers (1) 6,000 lb RT extended boom forklift (2) Portable floodlight trailers (1) Hydraulic vibratory extractor • • • • • • • Various Slings Beveling Machines Pile Welding Fixture Matting Beach Ramp (6 pontoons) Roadway (201 pontoons) Pierhead (66 pontoons) Elevated Causeway System (ELCAS(M) ) • Marshalling Yard (7 areas): (Crew: 44, 22 man shifts at 12 hrs each) • • • • • • • Receiving staging, used for inspecting pontoons Storage for 20’ ISO’s containing ELCAS(M) components Equipment Storage/Maintenance Staging Pontoons and Piles (Beach Ramp Location) Welded Pile Stowage, Pile Welding Stations Pile bin stowage Pontoon Stowage • Pile Size: 24” OD (1/2” thickness) steel piles in 38 ft length ( fits in ISO containers) Elevated Causeway System (ELCAS(M) ) • Installation: – Bring ELCAS (M) materials ashore using 3 or 5 wide MCWF or other lighterage – Prepare marshalling areas and beach ramp site. Beach ramp hole is 79 ft back from high-water mark and 7 ft above above high water mark. – (6) P40G Pontoon sections (3 wide x 2 long) are placed for beach ramp. Maintain 7.5o angle. 6 piles are used to secure ramp. Piles are cut 3 ft above deck. – Roadway consists of 3 wide P40G pontoons (201 for 3000 ft). Transition from beach ramp to roadway is via 9 angled connectors. Fasten 2 pontoons side by side, lift them into place, cantilevered out, add third section. – Construct pier head once the proper distance is obtained. Pier head piles are cut 2 inches below the deck level. Pierhead crane piles cut 1 inch above deck level. (Specific pontoons in certain locations) – The turntables, lights, throughput cranes. (installation of 175 ton cranes), navigation lights, life lines, nets, life ring buoys (every 80 ft opposite sides) – OPS: The turned tractor trailer is loaded on the turntable. Vehicle traffic is on the left hand side. 100 JLOTS SECURITY SPOD End User 80 Staging or Marshalling Area SURGE SURGE BCU Red Beach 60 LSV SURGE BLCP 40 Container Ship LCU-2000 Staging or Marshalling Area End User Floating Pier Container Ship Crane ship LCM-8 LCU-2000 20 JLCC (Joint literage control center) Staging or End User Marshalling Area BCU SURGE Green Beach LCM-8 ELCAS (Elevated Causeway) BLCP SLCP Container Ship Crane ship OPDS 0 APOD CAMP End User 11 12 13 14 15 16 Fuel Farm SEC K IPDS 17 18 19 20 21 22 23 24 25 26 27 28 29 1st Hvy Div 2nd Hvy Div 3rd Hvy Div 30 35 40 45 50 55 60 65 70 75 80 5 1/3rd Hvy Div 100 JLOTS Sustainment SECURITY End User 80 Staging or Marshalling Area Container Ship Container Ship BCU Red Beach 60 LSV Container Ship BLCP 40 Container Ship LCU-2000 Staging or Marshalling Area End User Container Ship Floating Pier Container Ship Crane ship LCM-8 LCU-2000 20 JLCC (Joint literage control center) Staging or End User Marshalling Area BCU Container Ship LCM-8 Green Beach BLCP ELCAS (Elevated Causeway) SLCP Container Ship Crane ship OPDS 0 APOD CAMP End User Fuel Farm SEC K IPDS 25 26 27 28 29 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 Resupply / Regeneration JTF CDR *** MTMC AFFOR ARFOR Support JLOTS CDR** TRANS GROUP TACON WHEN U|W NSE LNO AACG NAVY LIGHTERAGE CREWS BSC BPT ARMY LIGHTERAGE CREWS Other Support CAMP BSWO * APS SSO LNO LSO OPDS OIC TACON DURING PUMPING ELCAS CDR * FSO LNO OPDS TANKER TACON BCU TSC MSCO OPDS CDR TACON DURING OPDS OPS MUAET NAVFOR MARFOR FSO * TERM BN JLCC * MSC LNO Support APSRON NSE * TRUCK BN CDR Tiger tm IPDS BN BLCP ELCAS OIC SDO SLCP * PHASE 4 START: MPF complete TRANSITION: Army Corps has closed Debark TMs 4 Regeneration - Retrograde, washdown and backload operations commence - Navy backloads lighterage - MPSRON deploys - Redeployment SECURITY 3 Shore Party 2 Staging or Marshalling Area Causeway Ferry LCM-8 LCT (lighterage control team) BPT (Beach Party Team) 1 Shore Party Causeway Ferry Green Beach Causeway Ferry LCM-8 SEC AABFS 0 SEC Red Beach K CAMP +20 +21 +22+23+24+25+26+27+28+29+30+31+32+33+34+35+36+37+38+39+40+41+42+43+44+45+46+47+48+49 Major Events: