Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or turn down volume Outline of Presentation Meeting Agenda LCLS-II Performance Requirements and Issues Superconducting Undulators (SCU’s) compared with permanent magnet undulators SCU impact on LCLS-II Hard X-Ray (HXR) FEL performance SCU impact on LCLS-I performance (using Cu linac) Brief SCU R&D Plan (more from other speakers) Review Charge and Committee This is a review of the R&D Proposal which leads up to a possible design baseline change in 2015, and not an evaluation of that decision. SCU R&D Review, Jan. 31, 2014 DRAFT Agenda for Jan. 31 Review* (2014) Meeting Site at (no password needed): https://portal.slac.stanford.edu/sites/ad_public/reviews/scu_rd_jan_2014/ Review Agenda (all times Pacific/SLAC): 07:00 AM (5 min) 07:05 AM (30 min) 07:35 AM (20 min) 07:55 AM (50 min) 08:45 AM (10 min) 08:55 AM (50 min) 09:45 AM (20 min) 10:05 AM (25 min) 10:30 AM Welcome and Charge SCU Advantages in LCLS-II Undulator Tolerance Estimates SCU Development at ANL (break) SCU Development at LBNL SCU Field Measurements (executive session) (adjourn) Norbert Holtkamp (SLAC) Paul Emma (SLAC) Heinz-Dieter Nuhn (SLAC) Efim Gluskin (ANL) Soren Prestemon (LBNL) Diego Arbelaez (LBNL) Committee Only - Chairman assembles committee response in writing within 2 weeks (Feb. 14, 2014) * Carried out by teleconference to save travel. SCU R&D Review, Jan. 31, 2014 LCLS-II Design Summary New 4-GeV CW linac (1 MHz) and 2 new FELs (~2020) 2 New Permanent Magnet (PM) adjustable gap undulators SXR FEL: HXR FEL: 0.2 - 1.3 keV (SASE and self-seeded) 1.2 - 5.0 keV (SASE and self-seeded?) PM for HXR undulator barely allows 5.0 keV in SASE (no selfseeding unless 4 keV or less) – existing und. hall is 150 m Will also replace existing LCLS-I und. with adj.-gap PMU (HXR) Radiation damage to PM’s is a major issue at 1 MHz (gap?) HXR FEL based on 150-m long PM-undulator at 4 GeV is very sensitive to e- emittance when tuned above 3.5 keV (risk) HXR FEL SCU SXR FEL Schematic of the LCLS-II facility with the new SCRF linac and two new undulators, along with the existing copper (Cu) linac, undulator and experimental halls.2014 The “Cu Linac” is in the 3rd km of the SLAC tunnel. R&D Review, Jan. 31, Superconducting Undulator Motivation Using an SCU for the LCLS-II HXR undulator… …allows full LCLS-II performance to 5 keV (SASE & selfseeded) and with 50-70 m less undulator (or more taper) …has orders of mag. less sensitivity to rad. dose …is much less sensitive to e- emittance (new high-rate gun) …produces very low pressure in a small vacuum chamber (gas scattering at 1 MHz) …enhances LCLS-I FEL power, whereas a new PM degrades it. SCU R&D Review, Jan. 31, 2014 SCU’s Provide Real Performance Enhancement Much higher fields for a given period and gap (planar undulators) SCU (Nb3Sn) SCU (NbTi) PM (in-vac) PM (NdFeB) gap = 7.5 mm (5.7 mm for in-vac same stay-clear) SCU R&D Review, Jan. 31, 2014 LCLS-II PMU lu = 26 mm Bpk = 1.0 T gap = 7.2 mm Examine Field’s Impact on LCLS-II Undulator Length The next 2 slides assume the following: 4-GeV electron energy (1 kA, ge = 0.45 mm, sE = 500 keV, etc.) 1.2 - 4.0 keV photon tuning range (SASE & self-seeded) Full-height magnetic gap of 7.5 mm (chamber gap is 5.7 mm) Und. period set by lower-limit photon energy (1.2 keV) for FEL resonance at highest field possible for this gap and technology Und. length set by max. photon energy (4 keV), assuming 18LG (based on beam brightness), plus 50% longer for self-seeding Compare in-vacuum and out-of-vacuum Permanent Magnets (NdFeB), and SCUs (NbTi & Nb3Sn) – all with same chamber gap Und. length includes 1.15-m breaks, 3.4-m segments, +20% for margin, and 4-m extra space for self-seeding monochromator Examine total length sensitivity to main parameters (see next)… SCU R&D Review, Jan. 31, 2014 Undulator Length vs. e- Energy for LCLS-II HXR 1.2 - 4.0 keV Self-Seeded (SS) lu = 27.5 mm, 24.8 mm, 20.3 mm, 18.7 mm (4 GeV) SCU R&D Review, Jan. 31, 2014 lu = 20.3 mm lu = 18.7 mm g = 7.5 mm ge = 0.45 mm Ipk = 1 kA sE = 500 keV b = 15 m lu = 16.3 mm Period varies with energy to maintain lower-limit tuning range (1.2 keV) Und. Length Comparison for LCLS-II HXR a Self-Seeded + 20% b c stay-clear = 5.7 mm PM sensitive to gex,y e f d m-bunching not incl. lu defined by this lu = 27.5 mm, 24.8 mm, 20.3 mm, 18.7 mm SCU R&D Review, Jan. 31, 2014 5 keV SS not possible Compare Baseline LCLS-II with LCLS-I (Cu linac) LCLS-I FEL Performance Compromised with new PMU PM, lu = 26 mm (project baseline) LCLS-I H.-D. Nuhn SCU R&D Review, Jan. 31, 2014 Compare Nb3Sn (lu = 20 mm) LCLS-II with LCLS-I LCLS-I FEL Further Enhanced with 20-mm SCU Nb3Sn, lu = 20 mm H.-D. Nuhn SCU R&D Review, Jan. 31, 2014 SCU R&D Plan in Brief ANL… Builds 2-m test cryostat (based on existing design at APS) Build & test 1.5-m long NbTi prototype planar undulator (lu 21.0 mm) LBNL… Build & test 1.5-m long Nb3Sn prototype planar undulator (lu 18.5 mm) Develop and tune each of the NbTi and Nb3Sn undulators Both Labs… Develop field measurement and field correction techniques Demonstrate predicted field, field quality, end-field corrections, field measurement and tuning, cold mass fiducialization, and integration of cold mass into cryostat Goal: Within 18 months deliver 2 fully functional, 1.5-m long, SC prototype undulators which meet LCLS-II specifications SCU R&D Review, Jan. 31, 2014 SCU R&D and LCLS-II Construction Time-Line 17-Month SCU R&D (to ~May 2015) 3-Year production cycle for 33 SCU segments (~3 m/ea) Installation of LCLS-II undulator starts mid-2018 Undulator Production SCU R&D 2014 Start SCU R&D 2015 2016 End R&D Start Und. Production SCU R&D Review, Jan. 31, 2014 2017 2018 2019 2020 Start Und. Installation Linac and Cryo Install Complete Review Committee and Charge Review Committee: Name Mikael Eriksson, chair Sara Casalbuoni David Larbalestier Joachim Pflueger Johannes Bahrdt Institute Max Lab ANKA FSU EXFEL HZB E-Mail Address Mikael.Eriksson@maxlab.lu.se sara.casalbuoni@kit.edu larbalestier@asc.magnet.fsu.edu joachim.pflueger@xfel.eu johannes.bahrdt@helmholtz-berlin.de Confirmed Yes – 12/18/13 Yes – 12/18/13 Yes – 12/17/13 Yes – 12/18/13 Yes – 01/08/14 Charge to the Committee: 1. Is the SCU R&D plan technically sound, and is it well enough defined in scope, schedule, and cost so as to produce definitive results that can support a baseline design change to the hard x-ray LCLS-II undulator, by May 2015? 2. If the plan appears insufficient, what recommendations can the committee make to improve the chances for supporting a baseline change within 18 months? 3. What further alterations might be made to solidify the plan and move it forward in time or reduce costs? SCU R&D Review, Jan. 31, 2014 End SCU R&D Review, Jan. 31, 2014 Compare Nb3Sn (lu = 18.5 mm) LCLS-II with LCLS-I LCLS-I FEL Performance Enhanced with New SCU Nb3Sn, lu = 18.5 mm LCLS-I H.-D. Nuhn SCU R&D Review, Jan. 31, 2014 Und. Length with 4-mm Stay Clear (5.8 mm gap) stay-clear = 4.0 mm lu = 25.0 mm, 22.0 mm, 18.6 mm, 17.0 mm SCU R&D Review, Jan. 31, 2014 Prototype Undulator Parameters SCU R&D Review, Jan. 31, 2014