SOLAR MARKET IN TURKEY
FARUK TELEMCIOGLU
GUNDER (ISES – TR )
info@gunder.org.tr
INTERNATIONAL SOLAR
ENERGY SOCIETY
TURKEY SECTION
REPRESENTING TURKEY IN
WE ARE THE MEMBER OF :
TOTAL INSTALLED POWER CAPACITY IN TURKEY
(68 GW )
JEOTERMAL
358,42 MW
% 0,53
RÜZGAR
3483,94
MW
% 5,11
GÜNEŞ
35 MW
% 0,05
DOĞAL GAZ + LNG
21190,69 MW
% 31,06
BARAJLI HİDROLİK
16586,64 MW
% 24,31
KÜÇÜK HİDROLİK
6868,29 MW
% 10,07
KÖMÜR & LİNYİT
14034,28 MW
% 20,57
DİĞER
5964,4 MW
% 8,95
TOTAL INSTALLED
RENEWABLE POWER CAPACITY
(11 GW )
RENEWABLE +
WASTE
267,67 MW
2,4%
MICRO
HYDRAULIC
6868,29 MW
% 62
WIND
3483,94
MW
% 31,6
GEOTHERMAL
358,42 MW
% 3,25
SOLAR
35 MW
0,3%
PROJECTION
TOTAL CAPACITY: 125 GW
TOTAL PRODUCTION: 424 TWh
RENEWABLE ENERGY PRODUCTION PROJECTION
RENEWABLE POTENTIAL OF TURKEY
•
•
•
•
•
•
160,000 GWh/a. ECO. HYDRO
48,000 MW WIND
1,500 kWh/m²-year AGSR
31,500 MWt GEOTHERMAL
8.6 MTEP BIOMASS
1.5-2 MTEP BIOGAS
12
FEED IN TARIFFS
According to Law on Utilization of Renewable Energy Resources for the Purpose of
Generating Electrical Energy
Schedule I
(Provision of the law dated 29/12/2010 and numbered 6094)
Type of Production Facility Based on
Renewable Energy Resources
a. Hydroelectric production facility
Prices Applicable
(US Dollar cent/kWh)
7.3
b. Wind power based production facility
c. Geothermal power based production
facility
d. Biomass based production facility
(including landfill gas)
10.5
e. Solar power based production facility
13.3
7.3
13.3
13
TARGETS FOR 2023
The whole economically feasible
hydropower potential of Turkey
will be provided for generating
electrical energy,
20,000 MW capacity of wind power
plant will be in operation
Minimum 3000 MW of solar
energy capacity will be reached
Minimum 600 MWe geothermal
will be implemented
1500 MWe installed capacity
for Biomass energy
14
SOLAR ENERGY IN TURKEY
SOLAR WATER HEATING SYSTEMS
18
SOLAR THERMAL MARKET
• PRODUCER : MORE THAN 90 COMPANIES
RETAILERS: 800 - INSTALLERS : 3000
• TOTAL POWER : 18.000.000 M2
• PER 1000 INHABITANTS 5TH PLACE IN THE
WORLD
• THIRD BIGGEST PRODUCER IN THE WORLD
• 2013 PRODUCTION : 1.600.000 M2
• FOR 2013 MARKET SHARE:
%70 FLAT PLATE - %30 EVACUATED TUBE
SOLAR THERMAL PRODUCERS
PV MARKET
•
•
•
•
•
•
•
•
PV PANEL PRODUCER : 14 COMPANIES (LAMINATION)
TOTAL EPC COMPANIES : MORE THAN 100
TOTAL POWER PLANT : 35 MW UNLICENSED
UNLICENSE LIMIT : 1 MW
LICENSE LIMIT : 50 MW
LICENSE APPLICATION : 496 FILES – 7873 MW
TOTAL PERMITTED CAPACITY 600 MW
LICENSE TIME : BY END OF 2014
TOP 5 PV MARKET
PHOTOVOLTAIC PRODUCERS
SOLAR INVESTMENTS
• LICENCED
• UNLICENCED
LICENSED INVESTMENT PROCESS
SOLAR MEASUREMENT INSIDE THE PROJECT SITE
PRE-LICENSE APPLICATION TO EMRA
TECHNICAL EVALUATION BY THE MENR
COMPETITION TENDER
GRANTED PRE-LICENSE
PERMISSIONS FROM RELATED AUTHORITIES
GRANTED LICENSE
INSTALLATION & PROJECT ACCEPTANCE FROM THE MENR
OPERATION
REGION NO
REGION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
4. ANTALYA
5. ANTALYA
ADANA-OSMANİYE
BİTLİS
BURDUR
DENİZLİ
ELAZIĞ
ERZURUM
HAKKARİ
ISPARTA - AFYON
KAHRAMANMARAŞ – ADIYAMAN
KARAMAN
KAYSERİ
KONYA - 1
KONYA - 2
MALATYA - ADIYAMAN
MERSİN
MUĞLA - AYDIN
MUŞ
NİĞDE – NEVŞEHİR -AKSARAY
SİİRT – BATMAN - MARDİN
SİVAS
ŞANLIURFA - DİYARBAKIR
ŞIRNAK
VAN - AĞRI
BİNGÖL - TUNCELİ
ERZİNCAN
TOTAL
ANNOUNCED
NUMBER OF TOTAL CAPACITY
REGIONAL CAPACITY
APPLICATION
(MW)
(MW)
29
12
155,26
29
10
147,4
9
5
45
16
6
65,2
26
24
402,44
18
20
228,24
8
5
36,2
5
2
9,9
21
1
21
18
30
420,04
27
28
442,9
38
62
1128,12
25
31
521,97
46
36
657,94
46
67
1266,03
22
30
427,15
35
14
197,5
20
18
264,75
9
1
9
26
51
794,1
9
4
32
9
6
54
7
10
58
11
1
7
77
22
538,67
11
0
0
3
0
0
600
496
7929,79
LOCATIONS APPLIED FOR LICENSE
The Central Anatolian region and Konya are
the leading applied provinces.
UN LICENSEDINVESTMENT PROCESS
CONNECTION APPLICATION TO
DISTRUBITION COMPANY
TECHNICAL EVALUATION BY THE MENR
INVITATION LETTER
PERMISSIONS FROM
RELATED AUTHORITIES
PROJECT ACCEPTANCE
FROM THE MENR
OPERATION
THE PREDICTIONS FOR PV MARKET
• 2023 TARGET : OFFICALLY 3 GW
EXPECTATION : 10 – 12 GW
• UNLICENSE LIMIT : 1 MW
• NEW LICENSE APP. DATE : APRIL 2015
• MEASUREMENT : MIN 6 MONTHS
• TOTAL PERMITTED CAPACITY : 1,2 GW IN 2015
RENEWABLE ENERGY SUPPORT MECHANISM
Renewable power plants that have come into operation
since 18 May 2005 or will come into operation
before 31 December 2020 will be eligible to receive the
feed-in tariffs for the first 10 years of their operation.
In addition, if the mechanical or electro-mechanical
equipment of the power plant is produced locally,
a premium shall be added to the feed-in tariffs during the
first five years of operation.
FEED-IN TARRIF AND LOCAL EQUIPMENT BONUS
SOCIAL PROJECTS
•
•
•
•
•
ORKOY
ILBANK
IPRAD 1 AND IPRAD 2 PROJECTS
TURSEFF
RE COOPERATIVE
SHC CONFERENCE 2015
İstanbul
Let’s meet where the continents meet...