SOLAR MARKET IN TURKEY FARUK TELEMCIOGLU GUNDER (ISES – TR ) info@gunder.org.tr INTERNATIONAL SOLAR ENERGY SOCIETY TURKEY SECTION REPRESENTING TURKEY IN WE ARE THE MEMBER OF : TOTAL INSTALLED POWER CAPACITY IN TURKEY (68 GW ) JEOTERMAL 358,42 MW % 0,53 RÜZGAR 3483,94 MW % 5,11 GÜNEŞ 35 MW % 0,05 DOĞAL GAZ + LNG 21190,69 MW % 31,06 BARAJLI HİDROLİK 16586,64 MW % 24,31 KÜÇÜK HİDROLİK 6868,29 MW % 10,07 KÖMÜR & LİNYİT 14034,28 MW % 20,57 DİĞER 5964,4 MW % 8,95 TOTAL INSTALLED RENEWABLE POWER CAPACITY (11 GW ) RENEWABLE + WASTE 267,67 MW 2,4% MICRO HYDRAULIC 6868,29 MW % 62 WIND 3483,94 MW % 31,6 GEOTHERMAL 358,42 MW % 3,25 SOLAR 35 MW 0,3% PROJECTION TOTAL CAPACITY: 125 GW TOTAL PRODUCTION: 424 TWh RENEWABLE ENERGY PRODUCTION PROJECTION RENEWABLE POTENTIAL OF TURKEY • • • • • • 160,000 GWh/a. ECO. HYDRO 48,000 MW WIND 1,500 kWh/m²-year AGSR 31,500 MWt GEOTHERMAL 8.6 MTEP BIOMASS 1.5-2 MTEP BIOGAS 12 FEED IN TARIFFS According to Law on Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy Schedule I (Provision of the law dated 29/12/2010 and numbered 6094) Type of Production Facility Based on Renewable Energy Resources a. Hydroelectric production facility Prices Applicable (US Dollar cent/kWh) 7.3 b. Wind power based production facility c. Geothermal power based production facility d. Biomass based production facility (including landfill gas) 10.5 e. Solar power based production facility 13.3 7.3 13.3 13 TARGETS FOR 2023 The whole economically feasible hydropower potential of Turkey will be provided for generating electrical energy, 20,000 MW capacity of wind power plant will be in operation Minimum 3000 MW of solar energy capacity will be reached Minimum 600 MWe geothermal will be implemented 1500 MWe installed capacity for Biomass energy 14 SOLAR ENERGY IN TURKEY SOLAR WATER HEATING SYSTEMS 18 SOLAR THERMAL MARKET • PRODUCER : MORE THAN 90 COMPANIES RETAILERS: 800 - INSTALLERS : 3000 • TOTAL POWER : 18.000.000 M2 • PER 1000 INHABITANTS 5TH PLACE IN THE WORLD • THIRD BIGGEST PRODUCER IN THE WORLD • 2013 PRODUCTION : 1.600.000 M2 • FOR 2013 MARKET SHARE: %70 FLAT PLATE - %30 EVACUATED TUBE SOLAR THERMAL PRODUCERS PV MARKET • • • • • • • • PV PANEL PRODUCER : 14 COMPANIES (LAMINATION) TOTAL EPC COMPANIES : MORE THAN 100 TOTAL POWER PLANT : 35 MW UNLICENSED UNLICENSE LIMIT : 1 MW LICENSE LIMIT : 50 MW LICENSE APPLICATION : 496 FILES – 7873 MW TOTAL PERMITTED CAPACITY 600 MW LICENSE TIME : BY END OF 2014 TOP 5 PV MARKET PHOTOVOLTAIC PRODUCERS SOLAR INVESTMENTS • LICENCED • UNLICENCED LICENSED INVESTMENT PROCESS SOLAR MEASUREMENT INSIDE THE PROJECT SITE PRE-LICENSE APPLICATION TO EMRA TECHNICAL EVALUATION BY THE MENR COMPETITION TENDER GRANTED PRE-LICENSE PERMISSIONS FROM RELATED AUTHORITIES GRANTED LICENSE INSTALLATION & PROJECT ACCEPTANCE FROM THE MENR OPERATION REGION NO REGION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 4. ANTALYA 5. ANTALYA ADANA-OSMANİYE BİTLİS BURDUR DENİZLİ ELAZIĞ ERZURUM HAKKARİ ISPARTA - AFYON KAHRAMANMARAŞ – ADIYAMAN KARAMAN KAYSERİ KONYA - 1 KONYA - 2 MALATYA - ADIYAMAN MERSİN MUĞLA - AYDIN MUŞ NİĞDE – NEVŞEHİR -AKSARAY SİİRT – BATMAN - MARDİN SİVAS ŞANLIURFA - DİYARBAKIR ŞIRNAK VAN - AĞRI BİNGÖL - TUNCELİ ERZİNCAN TOTAL ANNOUNCED NUMBER OF TOTAL CAPACITY REGIONAL CAPACITY APPLICATION (MW) (MW) 29 12 155,26 29 10 147,4 9 5 45 16 6 65,2 26 24 402,44 18 20 228,24 8 5 36,2 5 2 9,9 21 1 21 18 30 420,04 27 28 442,9 38 62 1128,12 25 31 521,97 46 36 657,94 46 67 1266,03 22 30 427,15 35 14 197,5 20 18 264,75 9 1 9 26 51 794,1 9 4 32 9 6 54 7 10 58 11 1 7 77 22 538,67 11 0 0 3 0 0 600 496 7929,79 LOCATIONS APPLIED FOR LICENSE The Central Anatolian region and Konya are the leading applied provinces. UN LICENSEDINVESTMENT PROCESS CONNECTION APPLICATION TO DISTRUBITION COMPANY TECHNICAL EVALUATION BY THE MENR INVITATION LETTER PERMISSIONS FROM RELATED AUTHORITIES PROJECT ACCEPTANCE FROM THE MENR OPERATION THE PREDICTIONS FOR PV MARKET • 2023 TARGET : OFFICALLY 3 GW EXPECTATION : 10 – 12 GW • UNLICENSE LIMIT : 1 MW • NEW LICENSE APP. DATE : APRIL 2015 • MEASUREMENT : MIN 6 MONTHS • TOTAL PERMITTED CAPACITY : 1,2 GW IN 2015 RENEWABLE ENERGY SUPPORT MECHANISM Renewable power plants that have come into operation since 18 May 2005 or will come into operation before 31 December 2020 will be eligible to receive the feed-in tariffs for the first 10 years of their operation. In addition, if the mechanical or electro-mechanical equipment of the power plant is produced locally, a premium shall be added to the feed-in tariffs during the first five years of operation. FEED-IN TARRIF AND LOCAL EQUIPMENT BONUS SOCIAL PROJECTS • • • • • ORKOY ILBANK IPRAD 1 AND IPRAD 2 PROJECTS TURSEFF RE COOPERATIVE SHC CONFERENCE 2015 İstanbul Let’s meet where the continents meet... THANK YOU FOR YOUR ATTENTION…. Faruk TELEMCİOĞLU info@gunder.org.tr