Nirmal Bharat Abhiyan - Madhya Pradesh (2)

advertisement
NIRMAL BHARAT ABHIYAN
MADHYA PRADESH
Presentation on Convergence Model
State Water and Sanitation Mission
About Total Sanitation Campaign





Total Sanitation Campaign initiated in 1999 as a part
of Reform Principle.
More emphasis on IEC activities less on subsidy.
Only BPL household got incentive @ Rs. 625/HH
Norms revised in 2006 to Rs. 1500/HH toilet. Still, no
incentive to APL households.
Challenge :- Low cost toilets, non-sustainable, low
motivation level and quality not upto the mark.
Need of convergence with MGNREGA







Due to low cost of toilets.
No durable and sustainable technology
available.
Low motivational factor for the construction and
usage of toilets due to low incentive.
No incentive to marginal APL household.
No Demand generation.
Individual focused campaign.
Cost of raw material and labour was high.
TSC after Convergence with MGNREGA
Nirmal Vatika since 2007







Strengthening of infrastructural facilities.
Focus on livelihood in rural areas and night soil use for
production of bio-fertilizer.
To increase the incentive to BPL/SC/ST families.
Two leach pit constructed
Five plant provided for each family.
Bio-Fertilizer made - Either used or sold for income
generation.
Incentive from TSC was Rs. 1200/HH and Cost range from
Rs. 2000-Rs. 4500/toilet which is met with MGNREGA.
TSC - Cost revised @Rs. 2500/unit
after convergence








GoI has revised the incentive @ Rs. 2500
per IHHL
Cost has been revised from 1st April 2008.
Central Share : Rs. 1500/unit
State Share : Rs. 700/unit
Beneficiary share - Rs. 300/unit
Eligible families - BPL families
Under Nirmal Vatika (sub-Scheme of
MGNREGA) range per unit from Rs. 2500 to
4000/unit)
All SC/ST families included in the State.
TSC - Cost revised @ Rs. 3500/unit
after convergence

GoI has revised the incentive @ Rs. 3500
per IHHL

Cost has been revised from 1st April 2010.

Central Share : Rs. 2200/unit

State Share : Rs. 1000/unit

Beneficiary share - Rs. 300/unit

Eligible families - BPL families


Under Nirmal Vatika (sub-Scheme of
MGNREGA) range per unit from Rs. 2500
to 4000/unit)
All SC/ST families included in the State.
Nirmal Bharat Abhiyan - Convergence
model

With Madhya Pradesh model of convergence, TSC renamed
to“Nirmal Bharat Abhiyan” (NBA) from 01/04/2012.

Focus on making whole village ODF.

Convergence with MGNREGA.

Incentive to :

All BPL/SC/ST

APL - Small and marginal farmers

APL - Landless farmer with homestead

APL - Physically handicapped.

APL - Women headed household

Incentive raised from Rs. 3500 to Rs. 5500/IHHL from NBA.

MGNREGA share - Rs. 4400/HH

Till date, 674437 household toilet constructed since
01/04/2012.
Provision of Family Toilet under NBA
convergence with MGNREGA
Structure
Unit Cost
Household
toilet Rs 9900/with two leach pits
and one water tank
MGNREGA
Unskilled labor
Material
 Rs 2640/- for 20  Rs 1760/- for 06 man
unskilled man days @ Rs days
(Mason/
132/- per day
Plumber/MAT)
 Payment
will
be  05 days labor for
provided to employment Mason/plumber @ Rs
cardholders
through 290/- per day up to a
master roll system
maximum of Rs 1460/ Incentive amount for
MAT is Rs 300
 Incentive amount to
MAT will be paid after
use of toilet
 Payment will be done
through
Voucher
system.
NBA for cost of
material
Rs 4600/- from
NBA + Rs 900/from beneficiary,
Total Rs 5500/- will
be used as cost of
material
Salient Features of NBA in Madhya
Pradesh
• Capacity building of all stakeholders.
• Whole Gram Panchayats taken up for Nirmal Gram
Puraskar.
• Gram Panchayat with water in all habitation taken on
priority basis.
• Gram Panchayat with higher sanitation coverage prioritized
under NRDWP i.e. Conjoint approach of water and
sanitation from 01/04/2012.
• Total 5856 Gram Panchayats identified this year under this
approach.
Salient Features of NBA in Madhya
Pradesh - WASH in Schools
• All schools to be covered with separate toilet units for
boys and girls.
• Convergence and joint action plan developed with Sarva
Shiksha Abhiyan (RSK) in MP - distribution of targets
and costs.
• Provision from Panch Permeshwar scheme for
construction of hand washing platforms in the schools
• Provision of Safai Karmi for cleaning schools toilets.
• Formation of Child Cabinet and Clean School Award - for
motivation and sustainability.
Salient Features of NBA in Madhya Pradesh
- Solid & liquid Waste management.
• Solid and Liquid Waste management (SLWM) in ‘project mode’ based on number of
households
• Cap of Rs. 7/12/15/20 lakh with Gram Panchayats having up to 150/300/500/ >500
households on a Centre and State/GP sharing ratio of 70:30.
• Convergence with MGNREGA @ Rs. 5 lakhs for 1000 population.
• Projects prioritized for Nirmal status GPs -Awarded and proposed.
• Works to be taken for SLWM
• With NBA MNREGA convergence
• Liquid waste management-Construction of oxidation pond, sewage line for grey and black
water-reuse and collection, soakage pit
• Solid waste management- Construction of compost pit, waste segregation unit, vermi-compost
• from NBA fund
• Solid and liquid waste management- Provision of dustbins at HH level, provision of collection
trolly/tricycle, human resource for collection, segregation waste management, procurement of
other materials for segregation, collections and decomposition kit, uniform for human resource.
Discussion points




Some blocks ready to ODF but due to hard
strata/rocky surface areas, few toilets yet to
be constructed.
Special funding provision for Hard Starta
Surface area/ villages to construct Bio Toilets
through DRDO.
F.O.R. cost till 100% construction of Bio-toilets
is Rs. 20000/toilet with RCC work.
Along with NBA, permission to allow the
convergence of funds from Infrastructure
budget of IAP and BRGF to cover balance
cost of Bio-toilet cost.
Funding Pattern at a glance under TSC
Construction of Individual Latrine for BPL @ Rs.625 each(60:20:20) during inception of TSC
COST REVISED - Rs. 1,500/- per unit from April 2006, Rs. 2500/Unit from April 2008, Rs. 3500/unit from
April 2009 onwards
Construction of Individual Latrine for APL (No Incentives)
Women Sanitary Complexes (60:20:20) Cost @ Rs 2.00 lakhs
School Latrines @ Rs.20,000 (60:30:10) (Revised sharing patter is 70:30),
Revised norms Rs. 35000/unit from April 2010
Anganwadi Toilets @ Rs. 5,000 per unit (60:30:10) (Revised sharing pattern is 70:30)
Revised norms Rs. 8000/unit from April 2010
Alternative delivery mechanism upto 5% ( maximum of Rs. 35 lakh/ district) (80:20): RSM/PC
Revised guideline include Revolving Fund Maxm Rs.50.00 Lacs for Group landing Activity ( 80:20:00)
Start up activities upto 5 % of the project cost ( GoI = 100%)
Administrative charges upto 5 % (80:20)
Start Up & IEC ( 15% of the project cost )
Solid & Liquid waste Management upto 10% (60:20:20)
Toilet Constructed under Maryada, District- Neemuch and Shajapur
THANKS