Neighborhoods Advisory Group West Main Street Redevelopment David J. Neuman, Architect for the University April 2014 Clark Park | Principles for the Design of Clark Park The Clark Park enhancements will build on the existing positive characteristics of the Park while improving the civic quality, the accessibility, the use, and the connection of the park to the Battle Building Forecourt, University and Community University Gateway | Clark Park and Battle Building Forecourt Education Resource Center – Lee Street Redevelopment Emily Couric Clinical Cancer Center Lee Street Connective Elements Education Resource Center Site 11th Street Parking Garage Education Resource Center – View of Site from North Education Resource Center –Rendering from Hospital Lobby Neighborhoods Advisory Group Meeting April 10, 2014 Thomas A. Harkins Chief Environment of Care Officer UVA Medical Center The Battle Building Battle Building Battle Building Battle Building Battle Building UVA Medical Center Hospital Expansion Plan Emergency Department Expansion 14 The Current Condition Current Capacity • 43 Private and Semi-Private Exam and Trauma Beds (Only 16 Private) • 17 Hallway Beds • 60 Total Exam and Treatment Locations/Beds Emergency Department Renovation and Expansion Projected Capacity Need • • • • • 56 Private Exam (Treatment)/Trauma Beds 8 Psychiatric Beds 2 Forensic Beds Clinical Decision Making Unit 65 to 80 Treatment Beds Emergency Department Renovation and Expansion Project Schedule Project Planning (JLL) Summer 2013 Programming Schematic Design Design Development & Construction Documents BOV Project Review Nov 2014 Project Cost • $119,000,000 to $145,000,000 (Furniture & Equipment not included) Construction 30-36 Months Construction start Summer 2015 Bed Tower Interventional Emergency Department