SEESIM 14 IPC Operational WG slides

advertisement
Operational Working Group
SEESIM 14
Initial Planning Conference
(IPC)
21st – 24th January 2014
Zagreb, Croatia
Co-Chairs
LTC Ana Hajdić
LTC Petar Vrategov
UNCLASSIFIED
1
Operational Working Group
SEESIM 14
Introductions
UNCLASSIFIED
2
IPC Operational WG Objectives
SEESIM 14
Discuss proposal and schedule for Training
Audience Seminars and Workshops
Review and update Exercise Specification
(EXSPEC)
Develop DRAFT Manning Document
Review Exercise Planning and Execution
dates
Review and update Plan of Action and
Milestones (POA&M)
UNCLASSIFIED
3
IPC Operational WG Objectives
SEESIM 14
Conduct Training Objective Workshop
(TOW)
Conduct MEL/MIL Development Workshop
Discuss development of ‘Road to Crisis”
(Video?)
Determine Operational Working Group
Objectives for the MPC
Draft Operational Working Group minutes
UNCLASSIFIED
4
Manning Document
SEESIM 14
• Exercise Control (EXCON)
– Operational Personnel (includes all Response
Cells)
– Technical Personnel
– Determine required billets at IPC
– Provide names at FCC
• Training Audience
– Personnel in Emergency Operations Centers
(EOCs) and SEEBRIG HQ
– Determine required billets at IPC
– Provide names at FCC
UNCLASSIFIED
5
POA&M
SEESIM 14
• Items to add to POA&M
– Dates for Training Seminars/ Workshops
(Steering Group)
UNCLASSIFIED
8
IPC Operational WG Objectives
SEESIM 14
• Discuss proposal and schedule for Training
Audience Seminars and Workshops
• Review approved EXSPEC
• Discuss and refine Manning Document
• Discuss Information Management strategy
for the exercise
• Discuss AAR strategy for the exercise
• Review Exercise Planning and Execution
dates
UNCLASSIFIED
9
IPC Operational WG Objectives
SEESIM 14
• Review and update POA&M
• Conduct Training Objectives Workshop
• Conduct MEL/MIL Workshop
• Determine Operational Working Group
Objectives for the MPC
• Identify and discuss any remaining
Operational Issues
• Draft Operational Working Group minutes
UNCLASSIFIED
10
IPC Operational WG Objectives
SEESIM 14
•
•
OpWG representatives will participate in the
Training Objectives Workshop (TOW) and
MEL/MIL Development Workshop on 22-23
January 2014.
These representatives will be responsible for
developing detailed exercise injects to support
the specified scenarios and training objectives
for SEESIM 14. They should not be members
of the Training Audience.
UNCLASSIFIED
11
MPC Operational WG Objectives
SEESIM 14
• Review and refine Exercise design
• Discuss Training Audience Workshops
• Review Exercise floor plans
• Review Exercise planning and execution
timeline
• Discuss Manning Document
• Review and discuss draft Information
Management Plan
• Refine National Scenarios and Training
Objectives
UNCLASSIFIED
12
MPC Operational WG Objectives
SEESIM 14
• Develop daily Exercise Operational Schedule
• Review exercise planning and execution
timeline
• Review and update POA&M
• Conduct MEL/MIL Workshop
• Determine Operational Working Group
objectives for the FCC
• Identify and discuss any remaining
Operational Issues
• Draft Operational Working Group minutes
UNCLASSIFIED
13
SEESIM 14 MEL/MIL
SEESIM 14
Road to Crisis Video
Discussion
UNCLASSIFIED
14
14
SEESIM 14
Questions ?
UNCLASSIFIED
15
SEESIM 14
SEESIM 14
Scenario Development
Scenario Manager
CPT Višnja Prebeg
UNCLASSIFIED
16
Definitions
SEESIM 14
National Scenarios
Scenarios retained within the border of a
single nation, but does not prevent crossborder coordination for additional
resources
Sub-Regional Scenarios
Large incidents occurring in more than one
nation that stimulates cross-border
coordination
UNCLASSIFIED
17
SEESIM 14
National Scenarios
UNCLASSIFIED
18
National Scenarios Agreed at ESC
SEESIM 14
•Bosnia and Herzegovina – Cyber Attacks, Forest fire
•Bulgaria – Flooding, Refugee Influx
•Croatia – Earthquake, Cyber Attack
•Montenegro – Earthquake
•Romania – Terrorist attack
•The former Yugoslav Republic of Macedonia* – Cyber
Attack
•SEEBRIG – Assistance to be determined (only for
Disaster Relief Operations)
•Albania, Georgia? -TBD
•*Turkey recognizes the Republic of Macedonia
with its constitutionalUNCLASSIFIED
name.
19
SEESIM 14
Sub-Regional Scenarios
UNCLASSIFIED
20
•Sub-Regional Scenarios Agreed at ESC
SEESIM 14
•Earthquake – Romania and Bulgaria
•Flooding – Bosnia and Herzegovina and Croatia,
•Flooding – Bulgaria and the Former Yugoslav Republic
of Macedonia*,
•Chemical incident – Bosnia and Herzegovina and
Croatia
•Airplane crash – Croatia and Montenegro
•Albania, Georgia? -TBD
•*Turkey recognizes the Republic of Macedonia with its constitutional name.
UNCLASSIFIED
21
Scenarios Agreed at ESC- Sub-Regional
SEESIM 14
UNCLASSIFIED
22
Coordination of Sub-regional Incidents
SEESIM 14
•
•
•
•
•
•
•
Training Objectives (primary, secondary)
Locations/affected area (per nation)
Description “step by step”
Number of affected persons
Incident start/end time
Expected Outcome
Lead nation
UNCLASSIFIED
23
Main Scenario
SEESIM 14
•
•
•
•
•
•
•
•
•
•
•
•
Themes Agreed at ESC:
Cyber Attacks
Bosnia and Herzegovina
Croatia
The former Yugoslav Republic of Macedonia*
Others?
Earthquakes
Croatia
Montenegro
Romania
Bulgaria
Others?
UNCLASSIFIED
24
Main Scenario
SEESIM 14
Themes Agreed at ESC:
Floodings
• Bulgaria
• Bosnia and Herzegovina
• Croatia
• The former Yugoslav Republic of Macedonia*
• Others?
UNCLASSIFIED
25
To be considered . . .
SEESIM 14
• Leading Nations for sub-regional
scenarios?
• Training Objectives for sub-regional
scenarios – AAR analysis, data base
updates?
• RPs required to establish a realistic
training environment for the EOCs
• IOs, GOs, NGOs, Media (national and
international) vs TOs?
UNCLASSIFIED
26
SEESIM 14
Questions ?
UNCLASSIFIED
27
SEESIM 14
Training Objectives Workshop
(TOW)
UNCLASSIFIED
28
Training Objectives
SEESIM 14
• The list of agreed training objectives
UNCLASSIFIED
29
Training Objectives
SEESIM 14
• Describes desired outcome of a training activity
• Based on essential tasks, and derived from joint doctrine,
SOPs, and Commander’s guidance
• Multiple training objectives may be prescribed for each task
UNCLASSIFIED
30
Training Objective Workshop Goals
SEESIM 14
• Derive Training Objectives from selected tasks by
identifying:
– Training Audiences (who must contribute to the
accomplishment of a task?)
– Fundamental activities and processes of each
Training Audience contributing to
accomplishment of a task (what must we do?)
– Stimuli that spur the Training Audience to act
(when must we respond?)
– Associated performance metrics ( e.g., how well /
often, etc. must we do it?)
– Methods to accomplish the training (how)
UNCLASSIFIED
31
How TO are Developed
SEESIM 14
•
•Ask....
.Who contributes to the accomplishment of the task?
(the potential Training Audience, which may have
multiple players)
– Do they do all of the task or only part?
– If only part, who else contributes?
• What processes do they do? (performance)
• What prompts them to do or affects them doing the
task? (training situation)
• What measures and criteria show task(s) completion?
(level of performance)
The combined answers equate to a Training Objective
UNCLASSIFIED
32
TO Workshop Goals
SEESIM 14
• A Training Objective MUST be
Measurable!!!
• Short Term: Objectively (time,
percentage, go-no)
• Long Term: Subjectively (very hard in
SEESIM event)
UNCLASSIFIED
33
PRIMARY TRAINING AUDIENCE
SEESIM 14
• PTA for SEESIM 14 :
• CMEP officials responsible for national
response to a crisis.
• PTA operates from Emergency Operations
Centers (EOC)
• Playing from their respective countries
(JCATS availability?).
• TA for SEEBRIG - SEEBRIG HQ
• SEEBRIG HQ playing from Larissa,
Greece
• SEEBRIG Engineer Task Force (ETF)
participation?
UNCLASSIFIED
34
“Tools” For Developing TO
SEESIM 14
• NATO Task List (NTL)
• Standing Operating Procedures (SOPs)
or Emergency Operating Procedures
(EOPs)
• Training Manuals
• Operational Plans
• Doctrine / Tactics, Techniques &
Procedures
• Lessons Learned Analysis
UNCLASSIFIED
35
Training Objectives Summary
SEESIM 14
• Properly prepared, training objectives,
derived from essential tasks, assist the
command to focus attention on improving
required performance levels, demonstrated
in training exercises
• “If all training objectives for a particular
task are achieved, that task can be
accomplished to standard by the audience
being observed.”
UNCLASSIFIED
36
SEESIM 14
Training Objective
Practical Writing
UNCLASSIFIED
37
Sub Regional Incidents
SEESIM 14
•Natural Disaster
Incidents
•(Earthquake,
Floodings)
•ST 1.2.3
Provide for EnRoute Support
and Clearances
•OT 1.7.8 Plan
and Conduct
Patient
Evacuation
•OT 2.1.5
Develop
Multinational
Intel / Info
Sharing
Structure
•OT 2.5.0
Disseminate
and Integrate
Operational
Intel
•OT 3.2.4
•Provide for
Movement
Services in AO
•OT 4.11.4
Establish
Disaster
Control
Measures
•OT 4.12.6
Coordinate
Disaster Relief
•ST 6.3.1
Coordinate
Support for
Forces in the
AO
•Natural
Disasters
•Terrorism
UNCLASSIFIED
•ST 6.5.5
Provide
Support for
HADR, & Civ/Mil
Cooperation
•Cyber
38
SEESIM 14
Training Objective
Practical Writing
•Intelligence
•Performance •Provide Theater Threat
•Assessment
•Operations
•Performance •Coordinate, Integrate and
•Execute Force
•Employment
•Command
•OT 3.2.4
•Provide for
Movement
Services in
AO
•Performance •Coordinate Ministry
Support for Relief Actions
•Comms
•Performance -
•Logistics
•Establish and Maintain
• Communications
•Matrix
•Performance •Oversee Movement
•of Fuel and Ammo Intra•Theater
UNCLASSIFIED
39
Sub Regional Incidents
SEESIM 14
•Intel
•Intel
•Identified
•Task
•Identified
•Task
•Command
•Command
•Intel
•Identified
•Task
•Operations
•Operations
•Comms
•Comms
•Operations
•Comms
•Logistics
•Logistics
•Intel
•Logistics
•Command
•Identified
•Task
•Operations
•Comms
•Logistics
•Intel
•Identified
•Task
•Command
•Sub Regional
Incidents
•(Affected
SEDM
Nations)
•Command
•Intel
•Operations
•Identified
•Task
•Comms
•Logistics
•Intel
•Command
•Identified
•Task
•Operations
•Comms
•Logistics
•Intel
•Command •Operations
•Identified
•Task
•Command
•Comms
•Logistics
•Operations
•Comms
•Natural Disasters
•Logistics
•Terrorism
UNCLASSIFIED
•Cyber
40
Deriving Objectives
SEESIM 14
•Intel
•Command
•Identified
•Task
•Operations
•Comms
•Logistics
•Emergen
cy or
•Standing
•Operatin
g
•Procedur
es
•“Coordinate
…”
•“Determine …”
•“Respond …”
•“Conduct …”
UNCLASSIFIED
41
Training Objective (TO) Examples
SEESIM 14
• 3 Categories of Level of Performance (LOP)
– Process and procedures (P/P)
– Time
– % accomplished
UNCLASSIFIED
•
42
SEESIM 14
MEL/MIL Development WS
UNCLASSIFIED
43
Agreed during ESC
SEESIM 14
• The Training Objective Workshop (TOW) and
initial MEL/MIL Development Workshop are
scheduled as part of the Initial Planning
Conference (IPC)
• Each nation should develop approximately 90100 injects at the IPC
• Each inject developed during the workshop
should support a specific training objective and
include an expected action to assist with
proper evaluation
UNCLASSIFIED
44
MEL/MIL Development
SEESIM 14
• Scenario Managers will review all injects after
the IPC and provide feedback at the MPC to
identify gaps
• A second MEL/MIL Development Workshop is
scheduled for the Main Planning Conference
(MPC) to finalize injects
• Nations will be provided the opportunity to
continue MEL/MIL development between
planning conferences
UNCLASSIFIED
45
SEESIM 14 Scenario
SEESIM 14
• The SEESIM 14 Scenario will be constructed
using events, incidents and injects.
- Event – Entity (nacional, sub regional ..)
- Incident – Major theme within the Event (flooding,
earthquake, terrorist attack, …)
- Inject – Detailed information sent to the training
audience related to the incidents (28 homes
completely submerged in they city of xxxx, 200
school children trapped under rubble, etc.)
UNCLASSIFIED
46
MEL/MIL Development
SEESIM 14
• An automated MEL/MIL development tool will
be used to enter injects (JEMM)
• Training on the automated tool will be provided
prior to the MEL/MIL Workshop
• A Final Draft of the MEL/MIL will be available
for review at the Final Coordination Conference
(FCC)
UNCLASSIFIED
47
MEL/MIL Sync Matrix sample
SEESIM 14
UNCLASSIFIED
48
MEL/MIL Sync Matrix sample
SEESIM 14
UNCLASSIFIED
49
SEESIM 14 MEL/MIL WS
SEESIM 14
• MEL/MIL Development Workshop
• 60-70 draft MEL/MIL injects (view
sample)
• Coordination of Sub regional injects
UNCLASSIFIED
50
To be considered
SEESIM 14
• Leading Nations for sub-regional
scenarios?
• Training Objectives for sub-regional
scenarios – AAR analysis, data base
updates?
• RPs required to establish a realistic
training environment for the EOCs
• IOs, GOs, NGOs, Media (national and
international) vs TOs?
UNCLASSIFIED
51
To ensure
SEESIM 14
•
•
•
•
•
“Expected Action” should be included for each
inject to allow for proper analysis.
AAR personnel familiar with the scenario and
national focus areas
Each nation to send MEL/MIL Trackers,
JCATS operators and LNOs to EXCON Main
Suficient number of AAR analysts per Site
Suficient RPs to replicate IOs, NGOs
UNCLASSIFIED
52
SEESIM 14
Questions ?
UNCLASSIFIED
53
SEESIM 14
¸After Action Review
Manager
MAJ Željko Mauhar
AAR Manager
UNCLASSIFIED
54
SEESIM 14
JEMM Familiarization
LTC Stefan Siminoi
MAJ Cezar-Arian Paraascan
Romanian Simulation Training Centre
UNCLASSIFIED
55
SEESIM 14 Exercise Design
SEESIM 14
EXCON MAIN
CROATIA
VTC, VoIP, Web, Email
UNCLASSIFIED
56
SEESIM 14 Exercise Design
SEESIM 14
EXCON Main
Coordination
Coordination
National Response Cell
Liaison Officer
MEL/MIL Tracker
JCATS Operator
RFIs
Guidance
EXCON Forward
Site Manager
AAR Analyst
Role Players
Information
RFIs
Coordination
Exercise Director
EXCON Director
Operations Control
Scenario Manager
AAR Manager
Information Manager
Remote Site
TRAINING
AUDIENCE
MEL/MIL Injects
EOC
Other
EOCs
International Response Cell
(Role Players)
UNCLASSIFIED
57
SEESIM 14 Exercise Design
SEESIM 14
Exercise Director
Deputy Exercise Director
Personnel located in Croatia
Personnel located in Croatia
and remote sites
Visitor Observers Bureau (VOB)
Public Information Center (PIC)
EXCON Director
EXCON Admin
Operations Group
Technical Group
Operations Officer
Technical Coordinator
Information Manager
Systems Technicians
(One per Exercise site,
plus EXCON Main techs)
Scenario Manager
Comm Technicians
(One per Exercise site,
plus EXCON Main techs)
MEL/MIL Trackers
Liaison Officers
(One per Exercise site,
all located in Croatia)
(One per Exercise site,
all located in Croatia)
After Action Review Mgr
AAR Analysts
International Organizations
VTC Bridge Operator
VTC Operators
(One per Exercise site)
JCATS Tech Controller
(One per Exercise site)
Database Manager
(TBD)
Sr Model Controller
Site Mgrs / Role Players
JCATS Operators
UNCLASSIFIED
(One per Exercise site,
all located in Croatia)
58
EXCON Purpose
SEESIM 14
• Ensure that training takes place by using injects to
drive the Training Audience in the direction we want
them to go
• Provide an environment that increases realism and
enhances the training experience
• Coordinate activities of all control elements to ensure a
consistent and coherent picture is presented to the
Training Audience
• Capture Observations and lessons to improve future
planning and training
UNCLASSIFIED
59
EXCON Main
SEESIM 14
• EXCON Main provides the central focus for
consolidation of information, coordination of events,
and overall direction for the exercise
• EXCON Main will be located in Zagreb, Croatia
UNCLASSIFIED
60
EXCON Forward
SEESIM 14
• EXCON Forward will be located in each country or
organization which has an operational Emergency
Operations Center (EOC)
• EXCON Forward is the critical control link with the
Training Audience
• EXCON Forward feedback to EXCON Main will
determine the effectiveness of the overall regional
training
• EXCON Forward generally consists of a Site Manager,
AAR Analyst, Site Technicians (VTC Operator, Systems,
Communications), and other Role Players required
UNCLASSIFIED
61
EXCON Training
SEESIM 14
• Technical Training for remote site technicians will be
conducted 4 - 5 September 2014
• Training for Site Managers and AAR Analysts will be
conducted 9 - 11 September 2014
• Training for MEL/MIL trackers will be conducted TBD
• Training for JCATS Operators will be conducted 18 19 September 2014
• Training for EXCON Main personnel will be conducted
22 September 2014
UNCLASSIFIED
62
EXCON Training
SEESIM 14
• Training for EXCON Forward personnel will be
conducted by the Site Manager prior to
STARTEX
– Site Managers will receive EXCON Training three
weeks prior to STARTEX
– A Training Package will be provided to each Site
Manager for use in training of remote site EXCON
personnel
UNCLASSIFIED
63
EXCON Training Topics
SEESIM 14
• Exercise Overview
• Exercise Design
• EXCON Overview and Organization
• EXCON Key Billets and Responsibilities
• Scenario and MEL/MIL Inject Process
• JCATS Model Overview (TBD)
• Information Management
• White Cell Procedures
• AAR Process
• Distinguished Visitor’s Day (DVD)
UNCLASSIFIED
64
Training Audience (TA) Training
SEESIM 14
• Training for the Training Audience (EOCs) will
be in the form:
– Workshops and Seminars
– Exercise specific training
UNCLASSIFIED
65
Previous Training Workshops
SEESIM 14
• Croatia
– Crisis Management
– Civil Emergency Planning
• Greece
– Chemical, Biological, Radiological, Nuclear Defense
– Response To Terrorism
• Serbia
– Disaster Management Seminar
• Turkey
–
–
–
–
Humanitarian Relief Operations in Disasters
Cyber Terrorism
Border Security Control
Defence Against Terrorism
UNCLASSIFIED
66
Training Audience (TA) Training
SEESIM 14
• Exercise specific training for the Training
Audience will be conducted by each Site
Manager
• A Training Package will be provided to each Site
Manager during Site Manager Training for use in
training of their EOC
• Exercise specific training includes:
–
–
–
–
–
Exercise Overview and Objectives
Scenario Overview
Exercise Design
Information Management
Execution Schedule
UNCLASSIFIED
67
SEESIM 14
Questions ?
UNCLASSIFIED
68
Download