State of Washington State Interoperability Executive Committee SIEC MEETING THURSDAY, AUGUST 21, 2014 Page 1 Agenda Welcome and Introductions • Introduction of Katrina Osborn, Washington • • • • OneNet staff Members and guests introductions Review and modify Agenda Approval of June 19, 2014 Meeting Minutes Results of vote on OSCCR Upgrade Page 2 Special Presentation Shelley Westall Marilyn Freeman Page 3 News and Information Sharing Bill Schrier Page 4 SR530 Interoperability Report • New Version 7 (still draft) • Executive Summary Added • Role of Telecommunicators Added • Still open for input Page 5 Washington State Patrol Narrowbanding Project Report Robert Schwent Washington State Patrol Page 6 WSP Districts 7 WSP Narrowbanding Major Tasks Completed or In Process • District 2 (Bellevue) Implementation District Coverage Surveys Complete • Design Document Receipt and Approval Complete • Detailed Expectation Document Approval Complete • Console Configuration Complete Challenges • Conventional user interoperability • Zone 1 and Zone 2 system levels / updates Upcoming Milestones • User and Dispatcher Training • 700MHz Pilot Test Page 8 SIEC Advisory Workgroup and 800 MHz Rebanding Reports Michael Marusich, Office of the CIO Page 9 SIEC Advisory Workgroup OSCCR Upgrade Recommendation RCW requires all State agency radio system purchases be approved by the SIEC. The SAW provides recommendation to the SIEC; therefore, this request was submitted to the SAW in anticipation of receiving a favorable review and recommendation for approval by the SIEC. The Washington Military Department / Emergency Management Division requested approval for the purchase of four (4) On-Scene Command and Control Radio (OSCCR) servers, eight (8) computers and the contract labor required to migrate the OSCCR system from Windows 2003 / XP to Windows 8.1. This is required because Microsoft ceased support of Windows XP and Office 2003. State policy directs agencies to migrate off unsupported products. Total project is estimated to be $67,553. The SAW provided a recommendation for approval of the purchase and the SIEC approved the recommendation (via email) with a majority vote. Page 10 Rebanding Report WSDOT - New Radio Integration by Region • WA State Ferry, Southwest, Northwest, Olympic, North Central Regions are complete. • Minimal straggler units are being addressed by regional technicians in their normal course of business; Legacy equipment return is pending. • Eastern and South Central Regions are in process; SCR is currently one week ahead of its proposed install schedule. Page 11 Rebanding Report WADOC – Facility / Site Status RECONFIGURATION COMPLETE • • • • • • • Larch Correction Center Monroe Correction Complex Coyote Ridge Correction Center Olympic Correction Center Stafford Creek Correction Center Washington Correction Center for Women Mission Creek Correction Center for Women Larch Mountain Striped Peak Ellis Lookout Neilton Peak South Mountain Mt. Octopus IN PROCESS / SCHEDULED • • • Washington State Penitentiary - FNE & subscriber units previously reconfigured; Replacing combiners week of 8/18. Clallam Bay Corrections Center - FNE complete; Spectra radio replacement (11) pending; COR in process; Second Touch - mobiles week of 8/18 & subscribers week of 8/25. Cedar Creek Correction Center – Currently addressing combiner issue with Crown Castle; Rebanding in September 2014. Page 12 Rebanding Report WADOC – Facility / Site Status IN PROCESS / SCHEDULED (continued) • • • • • Capitol Peak - CCCC FNE Dependent; Scheduled for September 2014. Airway Heights Correction Center - Replacing system in October 2014. Washington Correction Center - Scheduled for early November 2014. Department of Social and Health Services SCC - Pending DSHS/SCC coordination. WA Department of Correction Headquarters - Scheduled for December 2014. Rebanding Challenges • • Unanticipated frequency conflicts & repeated Sprint loaner equipment failures are cause for multiple Change Order Requests (CORs). No Wave 1 Reconciliation response from Sprint (submitted in June). Upcoming Milestones • Wave 4 Planning Funding Agreement (FRA) Reconciliation Page 13 OneNet Committee Summit | SCIP Workshop August 13-14 Spokane, WA Facilitated by Bill Schrier Michael Marusich Katrina Osborn Bob Schwent Shelley Westall Page 14 Summit - Keynote T. J. Kennedy – FirstNet General Manager Page 15 Summit - General • Facilitation by Homeland Security’s Office of • • Emergency Communications– Schrier Attendance – Westall Event and Video Feedback - Westall • • Hosting Opportunities for partner organizations EventMobi App – Osborn • • Event Analytics Future Uses - Westall Page 16 EventMobi.com Page 17 EventMobi Analytics Page 18 EventMobi Analytics Page 19 Summit – Specific Outcomes • • • • • • • Revised SCIP New: Include county and regional LMR New: Include mobile data apps and use • Examples: TeamWork, Safety Pad Involving other responders COML training and certification Statewide Field Operations Guide (FOG) Updating Communications Asset Systems Management (CASM) tool Page 20 Summit – SIEC Discussion SIEC: • One stop clearinghouse for best practices? • Advocacy and champions for interop? • Wide focus including 911 / NG911? • Wider involvement of locals in SAW? • Policies and governance for FirstNet in Washington? • Newsletter and other tools for leadership and interacting with local government? Page 21 Role and Responsibilities of SIEC Members Facilitated by Bill Schrier Page 22 Washington OneNet (WON) Status Bill Schrier Shelley Westall Page 23 Brief WON Updates • • • Outreach Efforts - Westall • FCC Tribal Broadband Summit • Colville and Yakama Nation Visits • Community Transportation Association of the Northwest (CTANW) • Fusion Liaison Officer Training • APCO • Etc. Subcontracting: PNWER & WSU – Schrier October 16 FirstNet Initial Consultation - Schrier Washington OneNet and FirstNet Website: OneNet.wa.gov Twitter: twitter.com/waonenet Page 24 WON Outreach Map Page 25 Timelines • April 30: • • • • • FirstNet publishes checklist June 3: Washington submits (#5 of 56) August 13-14: Proposed stakeholder & technical committees kickoff October 16: SIEC + FirstNet + SCIP Kickoff Oct 2014 – 2015?: Design FirstNet WA Early 2016?: Design final & to Governor Page 26 Washington OneNet (WON) http://OneNet.wa.gov OneNet@ocio.wa.gov Page 27 Washington State Governance Structure Thursday, June 19, 2014 State Interoperability Executive Committee SIEC Workplan and Task List Bill Schrier Page 29 Budget Subcommittee • • • • • • Shawn Berry, WSP Bill Legg, WSDOT Albert Kassel, DNR Bill Schrier, OCIO Jim Semmens, Gambling Commission Jose Zuniga or designee, Corrections Staff: • Robert Schwent, WSP and SWIC • Michael Marusich, OCIO, alternate SWIC Page 30 Topics: Budget Subcommittee • SWIC Staffing • SIEC Staffing – frequency coordination • COML/COMT/AUXCOMM lists, training, certification, exercises, meetings • Field Operations Guides (FOG) • Statewide Communications Interoperability Plan (SCIP) & NECP • Work with locals to prepare comms for next disaster, major incidents Page 31 Upcoming Items Date TBD TBD TBD TBD October 16 October 16 December 18 December 18 Early 2016 Future Agenda Topics - Final Report of Interoperability during the SR530 Landslide and potential action on its specific recommendations (see below). - Final Report on April 10th E-911 Outage. - Recommendations and Action Plan from the Statewide Comms Interoperability Planning (SCIP) Workshop (Aug 13-14) - State Dispatch Centers Consolidation Report (from August, 2013 meeting) - Recommendations of Budget Subcommittee - FirstNet initial consultation with State of Washington. This is the launch of the “design” phase of the network in Washington. - Presentation of current status and plans for upgrade or replacement of the Washington State Department of Transportation Radio Network. - Presentation of the Plan for the Puget Sound Emergency Radio Network (PSERN), an upgrade or replacement of the King County 800 MHz radio Network - Review and recommendation to the Governor on the State Plan for FirstNet Page 32 Good of the Order Next Meeting: October 16 (probably 9AM – 3PM) FirstNet Initial Consultation Page 33