Subsea IOR in a Broad(er) Perspective Subsea IOR in a broader perspective January 2011 January 2011 Di rd ect or,vi Sal Ar il Sel g es & M arketing Eastern Region Arild Selvig + 47 66 75 32 05 arild.selvig@ fks.fm cti.com Current Trends M illion BO EPD Increasing Dependency of Subsea M illion BO EPD Subsea Production AnnualAverage = 480 trees Source: Infield System s Ltd. Source: Datam onitor 2 Current Trends Stronger Focus on Increased Recovery Subsea Fields Production Profile Post Peak Annual Field Decline Rates M illion BO EPD 15-18% 9-11% 5-7% Source: CERA,Douglas W estw ood Source: Cam bridge Energy Research Associates (CERA); Jan 2008 3 16 milliarder fat står på spill Publisert O ffshore.no 04.01.2011 Subseabrønner er vanskeligere å overhale. Vi trenger derfor en kraftinnsats på subseabrønner, slik at vi får en like god utvinningsgrad i disse som for plattformborede brønner. Åm og Terje Riis-Johansen (bildet), er enige med Oljedirektoratet i at økt boring er hovedresepten for på kort sikt å øke utvinningen på modne feltene. 4 FMC Responding to Trends Expansion of the Subsea Focus – Subsea IOR IO R Production Systems • Deeper water • HP/HT • Longer distance Processing • Separation • Pumping/Boosting • Compression Production Operations • Light Well Intervention • Through Tubing Rotary Drilling • Production Performance Services 5 Subsea Processing Evolution Subsea to Market Boosting Station Subsea Compression Raw Seawater Injection Compact Separation Heavy Oil applications Gravity Separation 6 Subsea Processing Road Map Statoil Tordis First Stage Separation Total Pazflor Deepwater Heavy Oil Petrobras Marlim Secondary Separation Gas Compression 7 FMC’s Subsea Processing Projects Activity in every major deepwater basin Tordis • Brow nfield • Gas/O il/W ater/Sand Separation • Boosting Cascade • Greenfield • Boosting Pazflor • Greenfield • Gas/Liquid Separation • Boosting Perdido • Greenfield • Gas/Liquid Separation • Boosting Marlim • Brow nfield • Gas/O il/W ater/Sand Separation Greenfield BC-10 • Greenfield • Gas/Liquid Separation • Boosting Brownfield 8 Subsea Gas Compression The next gamechanger in subsea 9 Light Well Intervention Opportunity to extend well life and increase oil recovery Subsea Installed Base 1,561 8.9 years Subsea production challenges: • 647 5.5 years Subsea w ell population aging • Production rates declining over tim e • Rig costs rising 844 4.7 years 310 7.2 years 783 9.0 years Producing subsea wells Average age of wells Source: Quest Offshore Resources,Inc. 10 Light Well Intervention Patented technology solution • Low er cost -rigless • Faster interventions • No hydrocarbons to surface riserless • Increased oilrecovery Contracts Awarded to FMC Operator Location Term Start-up Statoil North Sea 6 Yrs 2Q 2006 Statoil North Sea 4 Yrs 2Q 2009 BP North Sea 3 Yrs 2Q 2009 11 Through Tubing Rotary Drilling - TTRD • Enable efficient drilling,intervention and through tubing com pletion through the existing subsea com pletion. • M ore efficient and m ore cost effective com pared to conventionaldrilling • – Possible to develop m arginalw elltargets – Increased recovery In 2009 Statoildem onstrated,through tw o successfulTTRD operations,intervention and drilling through sam e system NPD IOR 2009 Award Together w ith Statoil,FM C developed and tested the TTRD technology in the Åsgard field, drilling the w orld’s longest sidetrack ever from a floating rig. Teknisk Ukeblad 2010 Engineering Award Aw arded for the developm ent ofIOR technologies ,Light W ell Intervention,TTRD and Subsea Processing TTRD Equipm ent Low er Part ONS 2009 Inovation Award Aw arded for the developm ent ofTTRD,an im portant contribution to the IOR effort 12 FMC Technologies – Watch ONSHORE SUPPORT In the collaboration room •Know ledge and Enhancem ent •Advice and Proactive Service Datalink to shore WATCH 24/7 On the platform: •Data Collector •Flow M anager •Condition & Perform ance M onitoring •Sm artTool Subsea control system “Data highway Down-hole Sensors Equipment Sensors/Instrumentation on: Trees,M anifolds,Process,Flow lines 13 FMC Watch System Real-time monitoring, operational support and services Engineering • FlowManager™ Metering – Basis for reservoir m anagem ent – Production Optim isation – Accelerated production and/or Increased recovery Real Time Flowing Conditions • FlowManager™ Advice Secure safe and prudent production planning 5000 rpm QT/QTR Min 0.55 kW – 0.0 Basis for production planning 0 40 – • FlowManager™ Performance – Integrity equipm ent m anagem ent po ma x. we r=2 de sig 92 5 .0 n kW 0 25 3000 rpm 0.0 00 kW 20 .0 kW 0 15 Increase uptim e 0.0 .0 00 k 14 kW 10 – FMC current subsea IOR Tool box WATCH 24/7 Flow Manager Maintenance Modification Repair 15 FMC’s vision - the Field of the Future 16