Presentation - Granite-PR

advertisement

Aberdeen-Stavanger Gateway

DOF Subsea

• Welcome

• Giovanni Corbetta, Managing Director

• DOF Subsea, part of the DOF Group

DOF Subsea 2

DOF Subsea 3

“To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day ”

DOF Subsea 4

DOF Subsea business model

• Steady business

• Time charter/ROV contracts

• Long-term contracts

DOF Subsea 5

Company Capabilities

• Integrated Subsea Construction

• Engineering

• Flexible & Umbilical Installation

• Subsea Structure Installation

• Mooring & Riser Installation

• Inspection Maintenance & Repair

• Tie-in & Diverless Intervention

Capabilities

• Field Abandonment & Decommissioning

• Seabed Mapping

• Positioning Services

DOF Subsea

DOF Subsea Atlantic fleet

Normand Reach Skandi Skolten Skandi Skansen

Geoholm

DOF Subsea

Geosund Skandi Inspector

7

DOF Subsea in Aberdeen

• Moved into Aberdeen in 2006

• Opportunities in subsea / marine construction

• Success to date

• Followed by a trend of vessel owners moving towards a more projects-based approach

DOF Subsea 8

Aberdeen – Norway

• Working together as a region

• 350 staff working in Atlantic operations

• People synergies

• Skills transfer and maximising knowledge

• Lessons learned

DOF Subsea 9

Challenges

• Cultural differences

office culture

business relationships

• Communication

language barriers

physical distance

DOF Subsea 10

Global Locations Focus regions

DOF Subsea

DOF Subsea

Current projects

Gina Krog FSO Field Development

Scope:

• Installation of TM Buoy

• Installation of Riser and Riser

Base

• Design, Fabrication and

Installation of Spool and Covers

• Offshore installation May and

June 2016

Vessels:

• Skandi Skolten

• Normand Reach

DOF Subsea 13

Maersk Riser Replacement, North Sea

Scope:

• Removal of existing flexible riser system on the Dunbarton field

• Installation of new riser system

• Associated surveys

Offshore installation will commence

July 2014

Vessel:

• Normand Reach

DOF Subsea 14

Shell – Corrib Natural Gass Field, Ireland

Scope:

• Disconnecting of the redundant flexible flowlines

• Install two flexible flowlines

• Tie-ins of the new flowlines to the wellhead and subsea manifold using the GE Icarus tiein tool

Offshore Installation August 2014

Vessel:

• Normand Reach

DOF Subsea 15

Thank you!